Variation of Pipeline Licence WA-31-PL (Lambert Deep Pipeline) (08-2024)

Administered by Department of Industry, Science and Resources

Legislation au C2024G00463 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

VARIATION OF PIPELINE LICENCE WA-31-PL

(LAMBERT DEEP PIPELINE) (08-2024)

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby vary Pipeline Licence WA-31-PL, dated 9 December 2021 (the Licence), for which:

 

Woodside Energy Ltd.

(ACN 005 482 986)

 

BP Developments Australia Pty. Ltd.

(ACN 081 102 856)

 

Chevron Australia Pty Ltd

(ACN 086 197 757)

 

Japan Australia LNG (MIMI) Pty. Ltd.

(ACN 006 303 180)

 

Shell Australia Pty Ltd

(ACN 009 663 576)

 

Woodside Energy (North West Shelf) Pty Ltd

(ACN 004 514 489)

 

are the registered titleholders, as set out below.

 

The variation takes effect on the day on which this notice of variation is published in the Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia

 

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–WESTERN AUSTRALIA
OFFSHORE PETROLEUM JOINT AUTHORITY

 

 

 

 

 

  1. The Route of The Pipeline is varied by deleting all the current text and replacing with the following:

 

“The pipeline route commences at the Universal Connection System (UCON) connector face on the flexible flowline downstream of the Lambert Deep manifold and finishes at the flange face upstream of the riser emergency shutdown valve (RESDV) on the Angel Platform. Features of the route are described in the table hereunder and the route is further described in the attached route map (Attachment 1). The pipeline licence route corridor extends ± 40 m either side of the provided route. Coordinates are provided to the Geodetic Datum of Australia (GDA94), UTM Zone 50.”

 

Main Halyard Flowline System Co-Ordinates

 

Feature Name

KP

Easting (m)

Northing (m)

1.

UCON Connector face at LD Manifold

0.0

445 763

7 850 743

2.

MLC-15

0.997

446 474

7 850 255

3.

MLC-14

1.993

447 281

7 849 687

4.

MLC-13

2.988

448 090

7 849 128

5.

MLC-12

3.985

448 904

7 848 555

6.

MLC-11

4.987

449 719

7 847 982

7.

MLC-10

5.978

450 534

7 847 410

8.

MLC-09

6.972

451 347

7 846 838

9.

MLC-08

7.783

451 915

7 846 270

10.

MLC-07

8.954

452 478

7 845 696

11.

MLC-06

9.403

453 144

7 845 235

12.

MLC-05

10.284

453 874

7 844 743

13.

MLC-04

11.166

454 601

7 844 245

14.

MLC-03

12.050

455 362

7 843 808

15.

MLC-02

12.930

456 221

7 843 928

16.

MLC-01

13.811

457 079

7 844 088

17.

AP2 flowline crossing

14.529

457 775

7 844 017

18.

AP2 umbilical crossing

14.544

457 786

7 844 007

19.

J-tube bellmouth

14.587

457 814

7 843 975

 

2.        Under Specifications, the Design and Construction is varied by deleting all the current text and replacing with the following:

 

Design and Construction

 

“The offshore pipeline is of flexible construction and as such is designed and constructed

according to the international standard ISO 13628-1, “Design and operation of subsea

production systems – Part 1: General requirements and recommendations”, as is permitted by Clause 2.2 of AS2885 Part 4. The rigid topside piping on the Angel Platform that forms part of the pipeline is designed and constructed according to the Australian standard AS 2885.4.”

 

 

 

 

 

 

 

3.        Under Specifications, the Basis of Design is varied by updating the items in bold and italics:

 

Item

Item Description

Details

1

Inside diameter of pipe and riser

254 mm (10 inches)

2

Wall thickness of flowline and riser section

Light weight (KP 0 to 6.972): 55.2 mm

Heavy weight (KP 6.972 to 9.403): 60.8 mm

Medium weight and riser (KP 9.403 to riser hang-off): 59.3 mm

3

Length

14.7 km to RESDV

4

Design life

20 years

5

Pipeline Construction

Unbonded Flexible Pipe

6

Pipeline and Riser Material Grade

Carcass Layer (process wetted): AISI 316L

Pressure Sheath (light and heavy weight): TP 37

Pressure Sheath (medium weight and riser): TP 35

Various other steel and polymer materials are applied to complete the flexible cross section.

7

Pipeline Specification

Subsea flexible: Unbonded Flexible Pipe to API 17J

Topside rigid piping: AS 2885.4 / DNVGL-ST-F101

8

Minimum yield strength of pipe steel

Various steel yield strengths are adopted within the flexible cross section.

9

Pipeline System Pressure

MAOP: 19.5 MPa(a) (19.4 MPag)

Maximum Design: 31.8 MPa(a)

Minimum Design: 0 MPa(a)

10

Design Capacity

180 MMscf/d

11

Maximum Design Temperature

115 ⁰C

12

Minimum Design Temperature

-30 ⁰C

13

Operating temperature range

Maximum: 115 ⁰C (Inlet condition)

Minimum: 21.3 ⁰C (Arrival condition)

14

Characteristics of substance proposed to be conveyed

Gas and condensate

15

General plans and descriptions of pump stations, tank stations or valve stations and their equipment

A two slot CRA Lambert Deep Manifold is installed immediately upstream of KP 0.0 which is nominated as a terminal station.

16

General plans and description of pigging facilities

N/A

17

Cathodic Protection

Al-Zn-In sacrificial bracelet anodes

Monitoring via ROV or AUV survey

18

Hydrate Management

Insulation and MEG injection

Attachment 1

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.