COMMONWEALTH OF AUSTRALIA

 

Section 226

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

 

VARIATION OF PIPELINE LICENCE WA-21-PL

(HALYARD FLOWLINE)

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby vary Pipeline Licence WA-21-PL as set out below.

 

  1. “Authorised Route” on page 2 of 16 of the title instrument is amended as follows:

    “Refer to plan attached as Annexure A and table of coordinates attached as Annexure B”
     
  2. The “Conditions of Licence” on pages 6, 7, and 8 of 16 are varied by deleting the text on pages 6, 7, and 8 of 16 in order to remove the conditions.

 

3.      Annexure A is varied by deleting the text on page 9 of 16 and the map on page 10 of 16 and replacing it with the following text and the map at Attachment 1:

WA-21-PL Greater East Spar system of pipes pipeline layout.
 

4.      Annexure B is varied by deleting the text on page 11 of 16 and replacing it with the following text and tables:

The route of the Greater East Spar system of pipes is described in the table hereunder, commencing at the Halyard-1 Christmas Tree and terminating at the western tie-in flange on the East Spar Manifold. Coordinates are based on Geodetic Datum of Australia (GDA94).

 

Main Halyard Flowline System Co-Ordinates

 

Feature Name

KP*

Easting (m)

Northing (m)

1.

Halyard-1 Christmas Tree (start)

0.00

283 157

7 720 608

2.

Greater East Spar PLEM

0.02

283 157

7 720 584

3.

Greater East Spar Subsea Cooling Skid

0.05

283 171

7 720 557

4.

Halyard 10” Flowline KP0.0

0.06

283 175

7 720 553

5.

Halyard 10” Flowline KP1.0

1.00

283 612

7 719 875

6.

Halyard 10” Flowline KP2.0

2.00

284 204

7 719 160

7.

Halyard 10” Flowline KP3.0

3.00

284 361

7 718 445

8.

Halyard 10” Flowline KP4.0

4.00

284 811

7 717 553

9.

Halyard 10” Flowline KP5.0

5.00

285 263

7 716 662

10.

Halyard 10” Flowline KP6.0

6.00

285 715

7 715 771

11.

Halyard 10” Flowline KP7.0

7.00

286 086

7 714 869

12.

Halyard 10” Flowline KP8.0

8.00

286 535

7 713 976

13.

Halyard 10” Flowline KP9.0

9.00

286 985

7 713 084

14.

Halyard 10” Flowline KP10.0

10.00

287 434

7 712 191

15.

Halyard 10” Flowline KP11.0

11.00

287 881

7 711 297

16.

Halyard 10” Flowline KP12.0

12.00

288 330

7 710 405

17.

Halyard 10” Flowline KP13.0

13.00

288 778

7 709 512

18.

Halyard 10” Flowline KP14.0

14.00

289 226

7 708 619

19.

Halyard 10” Flowline KP15.0

15.00

289 674

7 707 729

20.

Halyard 10” Flowline KP15.6

15.59

290 088

7 707 280

21.

East Spar PLEM

15.60

290 091

7 707 279

22.

East Spar Manifold western flange
tie-in spool (end)

15.61

290 101

7 707 291

Table 1. Route of Main Halyard Flowline (* Kilometre Point)

 

Spar-2 Tie-in 8” Flowline Co-Ordinates

 

Feature Name

Easting (m)

Northing (m)

1.

Spar-2 Christmas Tree (start)

281 791

7 719 735

2.

Spar-2 8” Flowline KP1.0

282 605

7 720 276

3.

Spar-2 8” Flowline KP1.68 (end) (GES PLEM)

283 154

7 720 585

Table 2. Route of Spar-2 Tie-in

5.      Annexure C “Basis of Design” on page 12 of 16 is varied by inserting after Item 1 the following:

Total Length of Pipeline (km): 17.290

 

6.      Items 8, 9, 11, 12 and 14 of Annexure C “Basis of Design” on page 13 of 16 are varied by deleting the text and replacing it with:

 

DESIGN DETAILS

Halyard-1 10” Flowline

Spar-2

8” Flowline

GES PLEM

GES SCS

Halyard-1 6” Tie-In Spool

GES PLEM -SCS 6” Tie-In Spool

8.

Pipe Dimensions

Outside Diameter (mm)

328.9

268.1

168.3

168.3

168.3

168.3

Inside Diameter (mm)

254

203.2

139.7

146.3

131.8

131.8

Length of Pipeline (km)

15.554

1.679

0.05

0.94

0.022

(±0.003)

0.022

(±0.003)

9.

Nominal Wall Thickness

Standard Wall (mm)

37.3

32.5

14.3

11.0

18.3

18.3

Heavy Wall (mm)

37.5

N/A

N/A

N/A

N/A

N/A

11.

Design
N.B. Assumes nominal contents density of 114 kg/m3

Initial Design Capacity (TJ/d)

99.0

95

150

150

95

150

Maximum Design Capacity (TJ/d)

250

317

164

164

150

150

Design Life (Years)

20

20

20

20

20

20

Erosional Velocity (m/s)

50

40

40

40

40

40

12.

Pipeline Corrosion Allowance

Internal (mm)

Nil

Nil

Nil

Nil

Nil

Nil

External (mm)

Nil

Nil

Nil

Nil

Nil

Nil

14.

Pipe Steel Specification and Grade

Pipeline

API 17J Duplex 2101 (7.2 mm thick)

API Spec 17J Duplex 2101

UNS 31803,
22% Cr Duplex 2205

UNS 31803,
22% Cr Duplex 2205

UNS 31803,
22% Cr Duplex 2205

UNS 31803,
22% Cr Duplex 2205

Riser

N/A

N/A

N/A

N/A

N/A

N/A

 

7.      Items 16, 17, 18, 19, 20, 21, and 23 of Annexure C “Basis of Design” on pages 13 and 14 of 16 are varied by deleting the text and replacing it with:

 

TEMPERATURE AND PRESSURE DETAILS

Halyard-1 10” Flowline

Spar-2

8” Flowline

GES PLEM

GES SCS

Halyard-1 6” Tie-In Spool

GES PLEM -SCS 6” Tie-In Spool

16.

Design Temperature

Pipeline (°C)

110

110

121

121

121

121

Facilities (°C)

55

55

55

55

55

55

17.

Maximum Operating Temperature

Pipeline (°C)

98

105

105

105

105

105

Facilities/Stations (°C)

55

55

55

55

55

55

18.

Minimum Operating Temperature

Pipeline (°C)

-20

-20

-18

-18

-18

-18

Facilities/Stations (°C)

-18

-20

-20

-20

-20

-20

19.

Design Pressure (MPag)

22.8

22.8

34.5

22.8

34.5

34.5

20.

Inlet Pressure Range (MPag)

6.0 to 21.2

6.0 to 21.5

6.0 to 21.5

6.0 to 21.5

6.0 to 21.5

6.0 to 21.5

21.

Outlet Pressure Range (MPag)

6.0 to 21.2

6.0 to 21.5

6.0 to 21.5

6.0 to 21.5

6.0 to 21.5

6.0 to 21.5

23.

Maximum Allowable Operating Pressure (MPag)

22.8 at 110°C

22.8 at 110°C

22.8 at 110°C

22.8 at 110°C

22.8 at 110°C

22.8 at 110°C

 

8.      The rest of Annexure C Basis of Design remains as stated in the licence instrument dated 20 January 2011.

 

 


The variation takes effect on the day on which a notice of the variation is published in the Commonwealth Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia

 

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–WESTERN AUSTRALIA
OFFSHORE PETROLEUM JOINT AUTHORITY

Attachment 1

 

Overview

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 was enacted to provide a framework for the regulation of offshore petroleum activities and greenhouse gas storage in Australia, aiming to balance the development of Australia's offshore petroleum resources with the protection of the marine environment and the interests of adjacent coastal states. This legislation was introduced to address the need for coordinated regulation of offshore petroleum activities in Australian waters, particularly in areas where state and federal jurisdictions overlap. The Act was enacted by the Parliament of Australia, and its policy objective is to ensure the sustainable development of Australia's offshore petroleum resources while minimising potential environmental impacts. The Act provides for the regulation of offshore petroleum activities, including the issuance and variation of licences and permits, and establishes the Commonwealth–Western Australia Offshore Petroleum Joint Authority as the body responsible for administering the Act in relation to the offshore area between Western Australia and the Northern Territory. The legislation in question is a Gazetted variation of a pipeline licence under the Offshore Petroleum and Greenhouse Gas Storage Act 2006. The National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority, has varied Pipeline Licence WA-21-PL, which pertains to the Halyard Flowline. The variation includes amendments to the authorised route, conditions of the licence, and technical specifications, such as the pipeline layout, coordinates, and design details. These changes aim to ensure that the pipeline operations comply with updated safety and environmental standards. The variation comes into effect on the date of its publication in the Commonwealth Government Gazette.

Scope and Application

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 applies to the regulation of offshore petroleum activities and greenhouse gas storage within the Commonwealth of Australia's jurisdiction, including the varying of pipeline licences as specified in the Act. The variation of Pipeline Licence WA-21-PL pertains to the Halyard Flowline, affecting the pipeline's authorised route, conditions, and design specifications as outlined in the licence instrument. The Act applies to entities involved in offshore petroleum activities, including those holding pipeline licences. The geographic reach of this Act extends to Commonwealth waters, and in this instance, specifically applies to Western Australia offshore petroleum activities. The variation takes effect from the date of publication of the notice in the Commonwealth Government Gazette, and it amends specific aspects of the licence while maintaining other conditions as previously set. The Act allows for the extension or restriction of its application through subordinate instruments, which are used here to modify the pipeline licence in detail.

Key Provisions

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 (the "Act") governs the variation of the Pipeline Licence WA-21-PL, which pertains to the Halyard Flowline. Section 226 of the Act provides the authority to vary the pipeline licence and specifies the changes to be made. The variation (section 3) modifies the "Authorised Route" by referring to an attached plan and table of coordinates, effectively replacing the previous specifications. The "Conditions of Licence" (section 4) have been entirely removed, simplifying the regulatory framework under which the pipeline operates. Annexure A (section 5) and Annexure B (section 6) have been updated to reflect new pipeline layout details and coordinate tables for the Greater East Spar system of pipes, respectively. The parties or entities governed by this variation must comply with the new specifications and requirements as outlined in the amended licence. The variations mandate adherence to the new pipeline layout, coordinates, and design details. These changes include the pipeline's physical dimensions, corrosion allowances, steel specifications, and operational parameters such as temperature and pressure limits. The variations also necessitate adjustments to the "Basis of Design" documentation, particularly in relation to the pipeline's length, design capacities, and pressure ranges. Failure to comply with the provisions of the Act and the varied licence may result in legal consequences. Although specific offences and penalties are not detailed in the variation itself, breaches of the Act can generally lead to civil or criminal penalties under the broader legislative framework. These may include fines, imprisonment, or other regulatory actions as prescribed by the Act. The exact penalties would depend on the nature and severity of the breach, as well as any additional guidelines or case law interpreting the Act's provisions.

Legal classification tags

Area of Law
Environmental Law
Administrative Law
Instrument
Gazette Notice
Concepts
Definitions & Interpretation
Regulatory Standards
Enforcement Powers
Reporting & Disclosure Obligations

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.