Variation of Pipeline Licence WA-19-PL (Jansz-Io to Barrow Island)

Administered by Department of Industry, Science and Resources

Legislation au C2023G00533 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

VARIATION OF PIPELINE LICENCE WA-19-PL

(JANSZ-IO TO BARROW ISLAND)

 

I, JOANNE JENNIFER BELL, delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby vary Pipeline Licence WA-19-PL, dated 9 July 2010 (the Licence), for which:

 

Chevron Australia Pty Ltd

(ACN 086 197 757)

 

Mobil Australia Resources Company Pty Limited

(ACN 000 113 217)

 

Shell Australia Pty Ltd

(ACN 009 663 576)

 

Osaka Gas Gorgon Pty Ltd

(ACN 139 074 847)

 

Tokyo Gas Gorgon Pty Ltd

(ACN 138 592 042)

 

JERA Gorgon Pty Ltd

(ACN 140 107 464)

 

 

are the registered titleholders, as set out below.

 

 

The variation takes effect on the day on which this notice of variation is published in the Commonwealth Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia

 

 

JOANNE JENNIFER BELL

DELEGATE OF THE TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–WESTERN AUSTRALIA
OFFSHORE PETROLEUM JOINT AUTHORITY

 

 

 


  1. The ‘Authorised Route’ is varied by deleting the text and replacing it with the following:

 

The pipeline route for the system of pipes commences at the well tie-ins to Jansz drill centre manifolds DC-1, DC-2 and DC-3 tied back to three infield production flowlines connected to the Midline Pipeline Termination Structure and ending at the State Water Boundary as described in the tables and the schematic ‘Jansz Pipeline – Pipeline Licence WA-19-PL’ hereunder:

 

DC-3 Drill Centre To DC-1 Drill Centre

Feature

Easting (mE)

Northing (mE)

Bend Radius (m)

DC-3 Manifold

239 816

7 802 880

 

PLET

239 866

7 802 820

 

IP1

243 036

7 803 747

4000

PLET

 245 480

7 805 956

 

DC-1 Manifold

 245 540

7 805 895

 

 

DC-1 Drill Centre to Midline PTS

Feature

Easting (mE)

Northing (mN)

DC-1 Manifold

245 540

7 805 895

PLET

245 618

7 805 841

PLET

249 352

7 807 738

Midline PTS

249 354

7 807 834

 

DC-2 Drill Centre to Midline PTS

Feature

Easting (mE)

Northing (mN)

DC-2 Manifold

253 211

7 809 865

PLET

253 132

7 809 920

PLET

249 375

7 807 924

Midline PTS

249 354

7 807 834

 

Midline PTS to Coastal Waters

Feature

Easting (mE)

Northing (mE)

Bend Radius (m)

Midline PTS

 249 354

7 807 834

 

PLET

 249 457

7 807 819

 

IP-1

 254 713

7 797 845

10000

IP-2

 268 515

7 782 080

12500

IP-3

 272 964

7 769 520

10000

IP-4

 279 022

7 760 368

4000

IP-5

 279 537

7 759 226

4000

IP-6

 282 368

7 755 620

7000

Wheatstone Trunkline Crossing

 289 218

7 744 687

 

Halyard Umbilical Crossing

 297 080

7 732 142

 

IP-7

 297 769

7 731 044

8000

IP-8

 301 692

7 725 476

7000

IP-9

 307 956

7 722 503

7000

IP-10

 309 905

7 721 956

7000

IP-11

 320 622

7 717 026

7000

IP-12

 325 486

7 715 320

7000

East Spar Crossing

 328 758

7 714 024

 

Coastal Waters Boundary

 329 766

7 713 625

 

 

 

 

 

Tie-in to DC-3 Drill Centre

Feature

Easting (mE)

Northing (mN)

JZI-3C Xmas Tree

 239 771

7 802 849

 

JZI-3D Xmas Tree

 239 762

7 802 881

 

JZI-3E Xmas Tree

 239 780

7 802 903

 

JZI-3F Xmas Tree

 239 782

7 802 923

 

DC-3 Manifold

239 816

7 802 880

 

 

Tie-in to DC-2 Drill Centre

Feature

Easting (mE)

Northing (mN)

JZI-2B Xmas Tree

 253 220

7 809 906

 

JZI-2C Xmas Tree

 253 249

7 809 904

 

JZI-2D Xmas Tree

 253 265

7 809 875

 

JZI-2E Xmas Tree

 253 250

7 809 849

 

JZI-2F Xmas Tree

 253 251

7 809 829

 

DC-2 Manifold

 253 211

7 809 865

 

 

Tie-in to DC-1 Drill Centre

Feature

Easting (mE)

Northing (mN)

JZI-1B Xmas Tree

 245 530

7 805 853

 

JZI-1C Xmas Tree

 245 501

7 805 856

 

JZI-1D Xmas Tree

 245 487

7 805 886

 

JZI-1E Xmas Tree

 245 500

7 805 911

 

JZI-1F Xmas Tree

 245 499

7 805 931

 

DC-1 Manifold

 245 540

7 805 895

 

 

Coordinates are based on Geodetic Datum of Australia (GDA94).”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.        ‘Definitions’ and ‘Interpretation’ are varied by deleting the current text and substituting it with the following:

“In this document:

“the Act” means the Offshore Petroleum and Greenhouse Gas Storage Act 2006 and includes any Act with which that Act is incorporated and words used in this document have the same meanings as in the Act; and

“the Regulations” means regulations made under the Act,

“Pipeline” has the meaning given in the Act.”

References within this document to “the pipeline” or “the flowline” are taken to refer to a pipe, a flowline, or a system of pipes.”

 

3.        ‘Conditions of Licence’ is varied by:

(a)   Deleting ‘Section 3 Standards and Integrity’ heading and text;

(b)   Deleting ‘Section 4 Personnel and Contractors to be Informed’ heading and text;

(c)   Under the heading ‘Section 5 Pipeline Particulars’;

  1. The heading is updated to ‘Section 3 Pipeline Particulars’;
  2. The numbering of ‘Section 5.1’ is updated to ‘Section 3.1’ and the text is deleted and replaced with the following:

‘The Licensee must construct the Licensed Pipeline in accordance with, and ensure that the Licensed Pipeline meets, and continues to meet, the specifications set out in the Basis of Design, unless and to the extent that the Joint Authority otherwise approves.’

c.       Deleting ‘Section 5.2’ heading and text;

(d)   Deleting ‘Section 6 – Pipeline Management Plan and Pipeline Safety Case’ heading and text;

(e)   Deleting ‘Section 7 – Environment Management Plans’ heading and text; and

(f)    Deleting ‘Section 8 – Designated Authority May Require Report’ heading and text; and

(g)   The numbering of ‘Section 9’ is updated to ‘Section 4’.

 

4.      Annexure A’ is varied by deleting the heading and text.

 

5.      Annexure B’ is varied by deleting the heading and text.

 

6.      Annexure C’ is varied by;

  1. Updating the numbering to ‘Annexure A’; and
  2. Deleting the current text and replacing with the following: 

 

“Design and Construction

The offshore pipeline shall be designed and constructed in accordance with Industry Standard DNVST-Fl0l - Submarine Pipeline Systems, which is incorporated in its entirety in Australian Standard AS2885.4 Pipelines - Gas and Liquid Petroleum - Offshore Submarine Pipeline System.

 

Piping within Manifold and PTS structures shall be designed and constructed in accordance with Industry Standard ASME B31.8 – Gas Transmission and Distribution Piping Systems.

 

Basis of Design

The pipeline shall be designed to the following parameters:

 

 

 

 

 

 

Feature

Nominal
Diameter
(mm)

Nominal
Wall
Thickness
(mm)

Material

Design
Pressure
(MPa(a))

Design
Temperature
(°C)

Flowline
Length
(km)

All Xmas Trees to Manifolds

ID 174.3

15.1 CS +
7.3 CRA

DNV MWPL 450 + N06625 CLAD

33.6

-35 to 72

1.160

(14 jumpers 0.110 to 0.055km each)

DC-3 Drill Centre to DC-1 Drill Centre

 

 

 

 

 

 

DC-3 Manifold to PLET

ID 550.0

26.2 CS + 3.5 CRA

DNV MWPL 450 + N06625 CLAD

28.5

-25 to 65

0.087

PLET to PLET

ID 400.0

21.9 CS + 3.0 CRA

DNV MWPL 450 + N06625 CLAD

28.5

-15 to 65

6.567

PLET to DC-1 Manifold

ID 550.0

26.2 CS + 3.5 CRA

DNV MWPL 450 + N06625 CLAD

28.5

-25 to 65

0.107

DC-2 Drill Centre to Midline PTS

 

 

 

 

 

 

DC-2 Manifold to PLET

ID 550.0

26.2 CS + 3.5 CRA

DNV MWPL 450 + N06625 CLAD

28.5

-25 to 65

0.115

PLET to PLET

 

 

 

 

 

4.255

 

 

 

First 24 m

ID 550.0

27.1 CS + 3.0 CRA

DNV MWPL 450 + N06625 CLAD

28.5

-25 to 65

Main

ID 550.0

27.1 CS + 3.0 CRA

DNV MWPL 450 + NS31603 CLAD

36.5

-5 to 55

Last 24 m

ID 550.0

27.1 CS + 3.0 CRA

DNV MWPL 450 + N06625 CLAD

36.5

0 to 50

PLET to Midline PTS

ID 550.0

26.2 CS + 3.5 CRA

DNV MWPL 450 + N06625 CLAD

28.5

0 to 50

0.122 

DC-1 Drill Centre to Midline PTS

 

 

 

 

 

 

DC-1 Manifold to PLET

ID 550.0

26.2 CS + 3.5 CRA

DNV MWPL 450 + N06625 CLAD

28.5

-25 to 65

 0.113

PLET to PLET

 

 

 

 

 

4.190

 

 

 

First 24 m

ID 550.0

27.1 CS + 3.0 CRA

DNV MWPL 450 + N06625 CLAD

28.5

-25 to 65

Main

ID 550.0

27.1 CS + 3.0 CRA

DNV MWPL 450 + NS31603 CLAD

36.5

-5 to 55

Last 24 m

ID 550.0

27.1 CS + 3.0 CRA

DNV MWPL 450 + N06625 CLAD

36.5

0 to 50

PLET to Midline PTS

ID 550.0

26.2 CS + 3.5 CRA

DNV MWPL 450 + N06625 CLAD

28.5

0 to 50

0 .113

Midline PTS to Coastal Waters

 

 

 

 

 

 

Midline PTS to PLET

 

ID 700.0

36.6 CS

DNV SAWL 450

28.5

0 to 50

 0.130

PLET to KP 30.0

 

ID 700.0

36.6 CS

DNV SAWL 450

28.5

-3 to 50

30.000

KP 30.0 to KP 53.562

 

ID 700.0

34.2 CS

DNV SAWL 450

28.5

-7 to 50

23.562

KP 53.562 to KP 54.238

 

ID 700.0

36.6 CS

DNV SAWL 450

28.5

-7 to 50

0.676

KP 54.238 to KP 71.677

 

ID 700.0

34.2 CS

DNV SAWL 450

28.5

-7 to 50

17.439

KP 71.677 to Coastal Waters

ID 800.0

31.2 CS

DNV SAWL 450

28.5

-3 to 50

56.823

 

 

 

 

 

 

 

Total Pipeline System:

 

 

 

 

 

145.46

 

 

 

 

 

 

  • External corrosion protection: The pipeline shall be protected from external corrosion by a combination of anti-corrosion coating and a sacrificial anode cathodic protection system.
  • Substance to be conveyed: Wet Natural Gas - predominantly Methane with approximately 0.07% CO2.
  • The design life of all pipes is 50 years.”

 

7.      ‘Annexure D’ is varied by deleting the heading and text.