COMMONWEALTH OF AUSTRALIA
Sections 226 and 708
Offshore Petroleum and Greenhouse Gas Storage Act 2006
VARIATION OF PIPELINE LICENCE VIC/PL8
(MACKEREL TO HALIBUT) (C6XCVV)
I, STEVEN ROBERT TAYLOR, the Delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth-Victoria Offshore Petroleum Joint Authority hereby vary Pipeline Licence VIC/PL8, dated 30 June 1975 (the Licence), for which:
Esso Australia Resources Pty Ltd
(ACN 091 829 819)
Woodside Energy (Bass Strait) Pty Ltd
(ACN 004 228 004)
are the registered titleholders, as set out below.
The variation takes effect on the day on which this notice of variation is published in the Australian Government Gazette.
Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia
STEVEN ROBERT TAYLOR
DELEGATE OF THE TITLES ADMINISTRATOR
ON BEHALF OF THE COMMONWEALTH-VICTORIA
OFFSHORE PETROLEUM JOINT AUTHORITY
VARIATION OF
PIPELINE LICENCE VIC/PL8
- Vary the pipeline licence name from Mackerel A to Halibut A to Mackerel to Halibut.
- The FIRST SCHEDULE of the Licence is varied by deleting the current text and replacing it with the following:
FIRST SCHEDULE
ROUTE OF PIPELINE
The route of the pipeline is described in the table below, and displayed in the map below (Attachment A), commencing at the subsea cut location near the Mackerel platform and terminating at the first flange upstream of the First Valve On (FVO) on the Halibut platform.
ID | Description | Easting (mE) | Northing (mN) |
1 | Subsea cut location near Mackerel platform | 617108.39 | 5740147.54 |
2 | Inflection Point 02 | 616925.68 | 5740153.00 |
3 | Inflection Point 03 | 617234.51 | 5744105.63 |
4 | Inflection Point 04 | 617273.69 | 5744107.11 |
5 | Inflection Point 05 | 617222.86 | 5747499.34 |
5 | Inflection Point 06 | 615316.11 | 5748501.76 |
7 | Inflection Point 07 | 615311.94 | 5748505.64 |
8 | FVO Halibut Manifold | 615298.45 | 5748508.58 |
Coordinate set above is based on GDA 94/MGA Zone 55, survey of pipeline centreline.
- The VIC/PL8 Pipeline Route Map is deleted and replaced with the map at Attachment A.
- The SECOND SCHEDULE of the Licence remains unchanged.
SECOND SCHEDULE
SPECIFICATIONS
- Design
The pipeline design is based on the following parameters –
- one 300 mm nominal diameter pipeline for the conveyance of liquid hydrocarbons;
- a flow rate of 15,899 sm3/d (0.100 MMbbl/d) of liquid hydrocarbons;
- a maximum internal design pressure of 14,893 kPag;
- a pipeline length of approximately 9.4 km.
- Materials of Construction
- Steel Pipe
The line pipe shall be in accordance with the requirements of the American Petroleum Institute Specification – API Spec 5LX, 35th Edition for Grade X52 seamless pipe and Esso Australia Limited Supplemental pipe specification accompanying the pipeline licence application. There is a 4 km replacement section beginning at Mackerel and terminating at the flexible jumper. All replacement rigid line pipe has an external diameter of 323.9 mm and a wall thickness of 12.7 mm.
The original section of pipeline starts at the other side of the flexible jumper to Halibut. This section of pipeline has an outer diameter of 323.9 mm and a wall thickness of 9.53 mm.
The tie-in spool has an external diameter of 323.9 mm and a wall thickness of 12.7 mm thick. It also has a corrosion coating of 0.5 mm thick Fusion Bonded Epoxy and a 25 mm Concrete Weight Coating. The Concrete Weight Coating extended from the riser to tie-in spool flange connection to the tie-in spool to pipeline connection.
The flexible jumpers are fabricated from composite material manufactured by Coflexip and have a Nylon-11 pressure containing sheath. The flexible jumper is 65.8 mm long, has an internal diameter of 305 mm and a wall thickness of 55.2 mm.
- Protective Coating
Primary external corrosion protection for the pipeline is provided by a Coal Tar
Enamel coating and a high-density polyethylene coating called Yellow Jacket.
- Weight Coating
The specification for the steel mesh reinforced weight coating and the shop application of this material to the pipe shall be in accordance with the Esso Australia Limited Protective Coatings Specifications accompanying the original pipeline licence application.
Attachment A