Variation of Pipeline Licence VIC/PL8 (Mackerel a to Halibut a Pipeline) (5MZC5N)

Administered by Department of Industry, Science and Resources

Legislation au C2025G00168 In force Gazette

Legislation content

COMMONWEALTH OF AUSTRALIA

 

Sections 226, 264 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

VARIATION OF PIPELINE LICENCE VIC/PL8

(MACKEREL A TO HALIBUT A PIPELINE) (5MZC5N)

 

 

I, NICOLE LYNETTE FILBAY, the Delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth-Victoria Offshore Petroleum Joint Authority hereby vary Pipeline Licence VIC/PL8, dated 30 June 1975 (the Licence), for which:

 

Esso Australia Resources Pty Ltd

(ACN 091 829 819)

 

Woodside Energy (Bass Strait) Pty Ltd

(ACN 004 228 004)

 

 

are the registered titleholders, as set out below.

 

The variation takes effect on the day on which this notice of variation is published in the Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia

 

NICOLE LYNETTE FILBAY

DELEGATE OF THE TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH-VICTORIA
OFFSHORE PETROLEUM JOINT AUTHORITY

 

 


FIRST SCHEDULE

ROUTE OF PIPELINE

 

The route of the pipeline is described in the table below and displayed in the map below (Attachment A), commencing at the cut spool location at the Mackerel platform and terminating at the first flange upstream of the First Valve On (FVO) on the Halibut A platform.

 

ID

DESCRIPTION

Easting (m)

 

Northing (m)

 

1

Cut spool location at the Mackerel platform

617112.65

5740149.89

2

Inflection Point 01

617103.28

5740144.71

3

Inflection Point 02

616925.68

5740153.00

4

Inflection Point 03

617234.51

5744105.63

5

Inflection Point 04

617273.69

5744107.11

6

Inflection Point 05

617222.86

5747499.34

7

Inflection Point 06

615316.11

5748501.76

8

Inflection Point 07

615311.94

5748505.64

9

FVO Halibut Manifold

615298.45

5748508.58

Coordinate set above is based on GDA 94/MGA Zone 55, survey of pipeline centreline.

 

SECOND SCHEDULE

 

SPECIFICATION

 

  1.         Design

 

The pipeline design is based on the following parameters –

 

  1.             one 300 mm nominal diameter pipeline for the conveyance of liquid hydrocarbons;
  2.          a flow rate of 15,899 sm3/d (0.100 MMbbl/d) of liquid hydrocarbons;
  3.        a maximum internal design pressure of 14,893 kPag;
  4.         a pipeline length of approximately 9.4 km.

 

  1.         Materials of Construction

 

  1.             Steel Pipe

 

The line pipe shall be in accordance with the requirements of the American Petroleum Institute Specification – API Spec 5LX, 35th Edition for Grade X52 seamless pipe and Esso Australia Limited Supplemental pipe specification accompanying the pipeline licence application. There is a 4 km replacement section beginning at Mackerel and terminating at the flexible jumper. All replacement rigid line pipe has an external diameter of 323.9 mm and a wall thickness of 12.7 mm.

 

The original section of pipeline starts at the other side of the flexible jumper to Halibut. This section of pipeline has an outer diameter of 323.9 mm and a wall thickness of 9.53 mm.

 

The tie-in spool has an external diameter of 323.9 mm and a wall thickness of 12.7 mm thick. It also has a corrosion coating of 0.5 mm thick Fusion Bonded Epoxy and a 25 mm Concrete Weight Coating. The Concrete Weight Coating extended from the riser to tie-in spool flange connection to the tie-in spool to pipeline connection.

 

The flexible jumpers are fabricated from composite material manufactured by Coflexip and have a Nylon-11 pressure containing sheath. The flexible jumper is 65.8 mm long, has an internal diameter of 305 mm and a wall thickness of 55.2 mm.

 

  1.          Protective Coating

 

Primary external corrosion protection for the pipeline is provided by a Coal Tar

Enamel coating and a high-density polyethylene coating called Yellow Jacket.

 

  1.        Weight Coating

 

The specification for the steel mesh reinforced weight coating and the shop application of this material to the pipe shall be in accordance with the Esso Australia Limited Protective Coatings Specifications accompanying the original pipeline licence application.

 

 

 

 

 

 


Attachment A


 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.