Variation of Pipeline Licence VIC/PL2 (Marlin A to Shore Gas Pipeline)

Administered by Department of Industry, Science and Resources

Legislation au C2020G00002 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Sections 226, 264 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

VARIATION OF PIPELINE LICENCE VIC/PL2

(MARLIN A TO SHORE GAS PIPELINE)

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority hereby vary Pipeline Licence VIC/PL2, dated 25 August 1988 (the Licence), for which:

 

BHP Billiton Petroleum (Bass Strait) Pty. Ltd.

(ABN 29 004 228 004)

 

Esso Australia Resources Pty Ltd

(ABN 62 091 829 819)

 

are the registered titleholders, as set out below.

 

The variation takes effect on the day on which a notice of the variation is published in the Commonwealth Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–VICTORIA
OFFSHORE PETROLEUM JOINT AUTHORITY

 

 


  1. The text of the Renewal of Pipeline Licence on Page 1 is varied by:

 

a) deleting the words:

 

“and subject to the conditions set out hereunder,”

 

b) deleting the words:

 

“the renewal of Pipeline Licence VIC/PL2, to have effect for a period of twenty-one years from and including the 25th day of August 1988.”

 

and replacing with:

 

“the renewal of Pipeline Licence VIC/PL2, in the offshore area of Victoria, subject to:

 

a)     the conditions set out in this licence;

b)     the provisions of the Act; and

c)      the provisions of the Regulations;

 

to construct and operate a pipeline for the conveyance of petroleum, of the design, size and capacity specified herein, along the route specified herein, in relation to the seabed specified herein, and to operate the pumping stations, tank stations and valve stations specified in the positions herein, to have effect from and including the 25th day of August 1988.
 

The licensee shall at all times comply with the provisions of the Act and Regulations (as amended from time to time).”

 

2.      The ‘INTERPRETATION’ on Page 2 of the Licence is varied by deleting the current text under the heading ‘INTERPRETATION’

 

and

 

substituting under the heading the following:

“In this document:

 

“the Act” means the Offshore Petroleum and Greenhouse Gas Storage Act 2006 and includes any Act with which that Act is incorporated, and words used in this document have the same respective meanings as in the Act.

 

“The Regulations” means regulations made under the Act.

 

“Pipeline” has the meaning given in the Act.

 

3.      The FIRST SCHEDULE of the Licence is varied by deleting the current text below the heading ‘FIRST SCHEDULE,’ ‘ROUTE OF PIPELINE’

 

and

 

substituting under the heading the following:

 

The route of the Marlin to Shore Gas Pipeline is described in the table below, and displayed in the map below, commencing at the downstream flange of the Last Valve Off (LVO) at the Marlin A platform and proceeding in a straight line, with some minor deflections towards a point which intersects the boundary of Commonwealth offshore waters at the 3 nautical mile limit at or about Easting 566683.76 m and Northing 5790587.51 m. Coordinates are based on Geodetic Datum of Australia (GDA94).

 

P_ID

DESCRIPTION

EASTING

NORTHING

1

LVO Marlin A Platform

606835.56

5767901.98

2

Inflection Point 01

606810.12

5767881.41

3

MLA150 Fuel Gas Pipeline Crossing

606741

5767879.44

4

MLB450 Gas Pipeline Crossing

606092.24

5767905.98

5

SNA250 Oil Pipeline Crossing

604756.52

5768422.87

6

3 Nautical Mile Limit Crossing

566683.76

5790587.51

 

Coordinate set above is based on GDA94 / MGA Zone 55, survey of pipeline centreline.”

 

 

 

 

4.      The SECOND SCHEDULE of the Licence is varied by:

 

a)      deleting the current text under Part I Specification, Section (A) Design

 

and

 

substituting under the heading Section (A) Design the following:

“The pipeline design is based on the following parameters –

(a)   one 500 mm nominal diameter pipeline for the conveyance of gaseous hydrocarbons;

(b)   a flow rate of 10.5 million standard cubic metres (sm3) (370 million standard cubic feet (MMscf)) per day of gaseous hydrocarbons;

(c)   an internal maximum design pressure of 12,514 kPag (1815 psig);

(d)   a specific gravity of 1.34 for the 500 mm (20 inch) weight coated pipeline (including contents);

(e)   a pipeline length of approximately 46.282 km.”

 

b)     deleting from Part I Specification, Section (B) Materials of Construction, the words:

 

“The materials used in the pipeline shall meet the following specifications-”

 

c)      deleting the current text under Part I Specification, Section (B) Materials of Construction, subsection (i) Steel Pipe

 

and

 

substituting under the heading subsection (i) Steel Pipe the following:

 

“The line pipe shall be in accordance with the requirements of the American Petroleum Institute Specification – API Spec 5LX, 35th Edition for Grade X52 seamless pipe and Esso Australia Limited Supplemental pipe specification accompanying the pipeline licence application.

For the first 37.9 km, corresponding to depths greater than 50 m, the pipeline has an outer diameter of 508 mm with a wall thickness of 15.9 mm. The remaining section of pipeline up to the shore crossing has an external diameter of 508 mm and a wall thickness of 12.7 mm.

 

The Marlin A export riser is also made from API-X52 sour service seamless CS line-pipe. The riser has a diameter of 508 mm and a wall thickness of 19.1 mm.” 

d)     deleting Part I Specification, Section (B) Materials of Construction, subsection (ii), Valves and Fittings

 

e)      deleting from Part I Specification, Section (B) Materials of Construction, subsection (iii) Protective Coating the words

 

(15 lb)

 

and

 

inserting additional text under Part I Specification, Section (B) Materials of Construction, subsection (iii) Protective Coating:

 

“In the splash zone, the riser includes external corrosion protection provided by 12.7 mm thick carbon steel and a 5 mm thick Monel sleeve. The riser then has a 25 mm thick CWC and 3.2 mm CTE down to the seabed.”

 

and

 

amending the numbering of Part I Specification, Section (B) Materials of Construction, subsection (iii) Protective Coating to be:

 

“(ii) Protective Coating”

 

f)       amending the numbering of Part I Specification, Section (B) Materials of Construction, subsection (iv) Weight Coating to be:

 

(iii) Weight Coating

 

g)     deleting Part I Specification, Section (C) Connection to Pipeline

 

h)     amending the numbering of Part I Specification, Section (D) Cathodic Protection to be:

 

 (C) Cathodic Protection

 

i)       deleting Part I Specification, Section (E) Pressure Control

 

j)       deleting all of Part II Further Conditions, Sections (A) to (E)

 

 

The rest of the Second Schedule remains as stated in the licence instrument dated 25 August 1988.

The variation takes effect on the day on which a notice of the variation is published in the Commonwealth Government Gazette.

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia

Overview

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 was enacted by the Commonwealth Parliament of Australia to provide a legal framework governing the exploration, production, storage, and transportation of offshore petroleum and greenhouse gas. This Act was introduced to address the need for a comprehensive regulatory regime that ensures the sustainable and environmentally responsible exploitation of Australia's offshore resources. The policy objective behind the Act is to balance the economic benefits of offshore petroleum activities with the protection of the marine environment and the mitigation of greenhouse gas emissions. The Act facilitates the licensing of offshore petroleum activities and the imposition of conditions that safeguard the environment, while also ensuring that the rights and interests of various stakeholders, including indigenous communities and coastal states, are protected. In the context of the Marlin A to Shore Gas Pipeline, the Act empowers the National Offshore Petroleum Titles Administrator to vary the conditions of existing pipeline licences to reflect changes in operational requirements, technological advancements, and regulatory standards. The variation of Pipeline Licence VIC/PL2 under this Act ensures that the pipeline operations comply with current legislation and regulations, thereby maintaining the integrity and safety of the pipeline infrastructure while supporting the broader goals of energy security and environmental stewardship.

Scope and Application

The Offshore Petroleum and Greenhouse Gas Storage Act 2006, as applied in this variation of Pipeline Licence VIC/PL2, pertains specifically to the entities BHP Billiton Petroleum (Bass Strait) Pty. Ltd. and Esso Australia Resources Pty Ltd, who are the registered titleholders of the Marlin A to Shore Gas Pipeline. The Act applies to the construction, operation, and regulation of offshore petroleum activities and greenhouse gas storage within the Commonwealth of Australia, extending to offshore areas and including specific conditions for pipeline operations. The variation modifies the existing licence to address new operational requirements and standards, ensuring that the pipeline's construction and operation comply with updated legislative provisions and regulations. The geographic reach of this Act is confined to the offshore area of Victoria. Notably, this variation does not introduce new exclusions or exemptions beyond those already outlined in the overarching Act and associated regulations. The application and interpretation of this variation are further defined and extended through subordinate instruments, which may include regulations and guidelines issued under the authority of the Act.

Key Provisions

The key provisions of the variation to Pipeline Licence VIC/PL2, as outlined in sections 226, 264 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006, modify the original licence to align it with current legislative standards and operational requirements. The variation primarily affects the licence's scope, conditions, and design specifications (section 226). The licence now explicitly states that it is subject to the conditions outlined in the licence itself, the provisions of the Act, and the Regulations (section 264). Furthermore, the variation alters the interpretation of key terms used in the licence, ensuring they align with the definitions provided in the Act and the Regulations (section 708). The obligations and requirements imposed by this variation mandate that the licensees, BHP Billiton Petroleum (Bass Strait) Pty. Ltd. and Esso Australia Resources Pty Ltd, must comply with all provisions of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 and any relevant regulations. This includes adhering to the updated design specifications for the Marlin to Shore Gas Pipeline, ensuring the materials used meet the required standards, and maintaining the pipeline in accordance with the operational guidelines provided. The licensees are also required to submit any necessary reports and documentation to the National Offshore Petroleum Titles Administrator as per the Act. Failure to comply with the provisions of the Act or the conditions of the licence may result in legal consequences. Under the Offshore Petroleum and Greenhouse Gas Storage Act 2006, breaches can lead to both civil and criminal penalties. Civil penalties may include fines, and in severe cases, criminal penalties can apply, including imprisonment. The specific penalties are determined by the severity of the breach and the discretion of the court, with potential maximum penalties detailed in the Act. Ensuring compliance is therefore crucial to avoid these legal repercussions.

Legal classification tags

Area of Law
Environmental Law
Energy Law
Instrument
Legislative Instrument
Concepts
Definitions & Interpretation
Compliance Obligations
Regulatory Standards
Offence Provisions
Enforcement Powers

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.