COMMONWEALTH OF AUSTRALIA
Sections 226, 264 and 708
Offshore Petroleum and Greenhouse Gas Storage Act 2006
VARIATION OF PIPELINE LICENCE VIC/PL17
(FLOUNDER TO TUNA PIPELINE)
I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority hereby vary Pipeline Licence VIC/PL17, dated 30 August 1996 (the Licence), for which:
BHP Billiton Petroleum (Bass Strait) Pty. Ltd.
(ABN 29 004 228 004)
Esso Australia Resources Pty Ltd
(ABN 62 091 829 819)
are the registered titleholders, as set out below.
The variation takes effect on the day on which a notice of the variation is published in the Commonwealth Government Gazette.
Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia
GRAEME ALBERT WATERS
TITLES ADMINISTRATOR
ON BEHALF OF THE COMMONWEALTH–VICTORIA
OFFSHORE PETROLEUM JOINT AUTHORITY
- The text of the Renewal of Pipeline Licence on Page 1 is varied by:
- deleting the words:
“and subject to the conditions set out hereunder,”
b. deleting the words:
“the renewal of Pipeline Licence VIC/PL17, to have effect for a period of twenty-one (21) years from and including the 30th day of August 1996.”
and replacing with:
“the renewal of Pipeline Licence VIC/PL17, in the offshore area of Victoria, subject to:
a) the conditions set out in this licence;
b) the provisions of the Act; and
c) the provisions of the Regulations;
to construct and operate a pipeline for the conveyance of petroleum, of the design, size and capacity specified herein, along the route specified herein, in relation to the seabed specified herein, and to operate the pumping stations, tank stations and valve stations specified in the positions herein, to have effect from and including the 30th day of August 1996.
The licensee shall at all times comply with the provisions of the Act and Regulations (amended from time to time).”
2. The ‘INTERPRETATION’ on Page 2 of the Licence is varied by deleting the current text under the heading ‘INTERPRETATION’
and
substituting under the heading the following:
“In this document:
“the Act” means the Offshore Petroleum and Greenhouse Gas Storage Act 2006 and includes any Act with which that Act is incorporated and words used in this document have the same respective meanings as in the Act; and
“the Regulations” means regulations made under the Act.
“Pipeline” has the meaning given in the Act.”
3. The FIRST SCHEDULE of the Licence is varied by deleting the current text below the heading ‘FIRST SCHEDULE,’ ‘ROUTE OF PIPELINE’
and
substituting under the heading the following:
“The route of the Flounder to Tuna pipeline is described in the table below, and displayed in the map below, commencing at the flange immediately downstream of the Last Valve Off (LVO) on the Flounder platform and terminating at the first flange upstream of the First Valve On (FVO) on the Tuna platform. Coordinates are based on Geodetic Datum of Australia (GDA94).
ID | DESCRIPTION | EASTING | NORTHING |
1 | LVO FlounderManifold | 625859.5 | 5758705.0 |
2 | Inflection Point 01 | 625866.6 | 5758705.4 |
3 | Flexible Pipeline – Section 1 Begin | 625869.6 | 5758720.0 |
4 | Inflection Point 02 | 625873.3 | 5758735.3 |
5 | Inflection Point 03 | 625867.5 | 5758784.4 |
6 | Inflection Point 04 | 625833.0 | 5758787.0 |
7 | Inflection Point 05 | 625786.0 | 5758799.0 |
8 | Inflection Point 06 | 625783.0 | 5758817.0 |
9 | Flexible Pipeline – Section 1 End | 625783.0 | 5758820.5 |
10 | Flexible Pipeline – Section 2 Begin | 625829.0 | 5762200.6 |
11 | Inflection Point 07 | 625829.0 | 5762223.0 |
12 | Inflection Point 08 | 625863.0 | 5762244.0 |
13 | Flexible Pipeline – Section 2 End | 625863.7 | 5762252.3 |
14 | Flexible Pipeline – Section 3 Begin | 626088.7 | 5765623.2 |
15 | Inflection Point 09 | 626086.7 | 5765652.0 |
16 | Inflection Point 10 | 626118.3 | 5765644.9 |
17 | Flexible Pipeline – Section 3 End | 626115.6 | 5765674.0 |
18 | West Tuna Fluid Umbilical Crossing | 625459.8 | 5772194.2 |
19 | KPA350 South Gas Pipeline Crossing | 625455.8 | 5772214.9 |
20 | KPA350 North Gas Pipeline Crossing | 625446.1 | 5772265.8 |
21 | West Tuna Electrical Umbilical Crossing | 625441.2 | 5772291.4 |
22 | Inflection Point 11 | 625214.0 | 5773082.0 |
23 | Inflection Point 12 | 624587.1 | 5774202.3 |
24 | Inflection Point 13 | 624365.9 | 5774389.1 |
25 | FVO Tuna Manifold | 624358.2 | 5774389.1 |
Coordinate set above is based on GDA94 / MGA Zone 55, survey of pipeline centreline.”
4. The SECOND SCHEDULE of the Licence is varied by:
- deleting the current text under Part I Specification, Section (A) Design
and
substituting under the heading Section (A) Design the following:
“The pipeline design is based on the following parameters –
(a) a 250 mm nominal diameter pipeline for the conveyance of gaseous and liquid hydrocarbons;
(b) a flow rate of 8000 sm3/d (0.050 MMbbl/d) of liquid hydrocarbons & 0.85 MMsm3/d (30.02 MMscf/d) of gaseous hydrocarbons;
(c) an internal design pressure of 13,790 kPag;
(d) a flexible jumpers design temperature of 85⁰C;
(e) a specific gravity of 2.2 for the 250 mm weight coated pipeline (including contents);
(f) a pipeline length of approximately 16.152 km.”
b. deleting from Part I Specification, Section (B) Materials of Construction, the words:
“The materials used in any repair, addition or alteration to the pipeline shall conform to the following specifications-”
c. deleting the current text under Part I Specification, Section (B) Materials of Construction, subsection (i) Steel Pipe
and
substituting under the heading subsection (i) Steel Pipe the following:
”The line pipe shall be in accordance with the requirements of the American Petroleum Institute Specification – API Spec 5L, 38th Edition 1990 for Grade X52 seamless pipe and Esso Australia Limited Supplemental pipe specification accompanying the pipeline licence application, and except for the riser pipe the pipeline shall have the dimensions 273.1 mm O.D. and 12.7 mm W.T.
Three flexible jumpers of 254 mm I.D., 330.8 mm O.D. Wellstream sour service flexible jumper with ANSI 900# RTJ flanged end fitting assemblies. The said riser pipe shall have the dimensions 273.1mm O.D. and 18.3 mm W.T. with 11.1 mm W.T. API 5L X65 bends.”
d. deleting Part I Specification, Section (B) Materials of Construction, subsection (ii), Valves and Fittings.
e. deleting the current text under Part I Specification, Section (B) Materials of Construction, subsection (iii) Protective Coating:
and
substituting under the heading subsection (iii) Protective Coating the following:
“The line pipe shall be protected by a coating of Coal Tar Enamel to a thickness of not less than 3.50 mm or FBE corrosion coating.
In the splash zone, the risers are protected by a 12.7 mm carbon steel sleeve and a 5 mm Monel sheath.
Primary external corrosion protection for the pipeline is provided by a 3.5 mm CTE coating.”
f. amending the numbering of Part I Specification, Section (B) Materials of Construction, subsection (iii) Protective Coating to be:
“(ii) Protective Coating”
g. amending the numbering of Part I Specification, Section (B) Materials of Construction, subsection (iv) Weight Coating to be:
“(iii) Weight Coating”
h. deleting Part I Specification, Section (C) Connection to Pipeline, Pipeline Scraper Sender and Scraper Receiver.
i. amending the numbering of Part I Specification, Section (D) Cathodic Protection to be:
“(C) Cathodic Protection”
j. deleting Part I Specification, Section (E) Pressure Control.
k. deleting all Part II Further Conditions, Sections (A) to (E).
The rest of the Second Schedule remains as stated in the licence instrument dated 30 August 1996.