Variation of Pipeline Licence VIC/PL14 (West Kingfish to Kingfish A) (5QHLTL)

Administered by Department of Industry, Science and Resources

Legislation au C2026G00379 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Sections 226, 264 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

VARIATION OF PIPELINE LICENCE VIC/PL14

(WEST KINGFISH TO KINGFISH A) (5QHLTL)

 

I, STEVEN ROBERT TAYLOR, the Delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth-Victoria Offshore Petroleum Joint Authority hereby vary Pipeline Licence VIC/PL14, granted 29 October 1981 (the Licence), for which:

 

Esso Australia Resources Pty Ltd

(ACN 091 829 819)

 

Woodside Energy (Bass Strait) Pty Ltd

(ACN 004 228 004)

 

 

are the registered titleholders, as set out below.

 

The variation takes effect on the day on which this notice of variation is published in the Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia

 

 

STEVEN ROBERT TAYLOR

DELEGATE OF THE TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH-VICTORIA
OFFSHORE PETROLEUM JOINT AUTHORITY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VARIATION OF  

PIPELINE LICENCE VIC/PL14 

 

1. The FIRST SCHEDULE of the Licence is varied by deleting the current text and replacing it with the following: 

FIRST SCHEDULE

 

 

ROUTE OF PIPELINE

 

The route of the West Kingfish to Kingfish A pipeline is described in the table below, and displayed in the map below (Attachment A), commencing at the subsea cut location near the West Kingfish platform and terminating at the subsea cut location near the Kingfish A platform.

 

ID

Description

Easting (mE)

Northing (mN)

1

Subsea cut location near the West Kingfish platform

Subsea repair cut at 25m from the West Kingfish jacket

596306.65

5727778.32

2

Inflection Point 03

599124.17

5727640.06

3

Inflection Point 04

599531.42

5727775.81

4

Subsea cut location near Kingfish A platform

599683.66

5727412.59

Coordinate set above is based on GDA94 / MGA Zone 55, survey of pipeline centreline.

 

  1.       The VIC/PL14 Pipeline Route Map is deleted and replaced with the map at Attachment A. 

 

  1.       The SECOND SCHEDULE of the Licence is varied by deleting the current text and replacing it with the following: 

SECOND SCHEDULE

 

SPECIFICATION

 

(A) Design

 

The pipeline design is based on the following parameters –

 

(a) one 300 mm nominal diameter pipeline for the conveyance of liquid hydrocarbons;

(b) a flow rate of 12,398 sm3 /d (0.078 MMbbl/d) of liquid hydrocarbons;

(c) an internal design pressure of 13,962 kPag (2025 psig);

(d) a specific gravity of 1.76 for the 300 mm weight coated pipeline (including contents);

(e) a pipeline length of approximately 3.626 km.

 

(B) Materials of Construction

 

(i)  Steel Pipe

 

The line pipe shall be in accordance with the requirements of the American Petroleum Institute Specification – API Spec 5LX, 35th Edition for Grade X52 seamless pipe and Esso Australia Limited Supplemental pipe specification accompanying the pipeline licence application, and except for the riser pipework, the pipeline shall have the dimensions 323.4 mm O.D. X 12.7 mm W.T.

 

Primary external corrosion protection for the pipeline is provided by a 2.5 mm thick, high temperature resistant, low density, Sintakote FBP.

 

(ii) Protective Coating

 

The line pipe shall be protected by a coating of fusion bonded black polyethylene to a thickness of not less than 2.2 mm and applied in accordance with the Esso Australia Limited Protective Coatings Specifications accompanying the original pipeline licence application.

 

(iii) Weight Coating

 

The specification for the steel mesh reinforced weight coating and the shop application of this material to the pipe shall be in accordance with the Esso Australia Limited Protective Coating Specifications accompanying the original pipeline licence application.

 

(C) Cathodic Protection

 

Sacrificial zinc bracelet anodes. There are three anodes fitted to the pipeline.

 


Attachment A

 

Overview

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 was enacted to provide a legislative framework for the regulation of offshore petroleum activities and greenhouse gas storage in Australia. This Act was introduced to address the need for a comprehensive and coordinated approach to the management of offshore petroleum resources, ensuring environmental protection, safety, and efficient use of resources. The Act was enacted by the Parliament of Australia and aims to provide a robust regulatory framework that balances economic development with environmental stewardship and community interests. It establishes the legal basis for licensing, environmental management, and the regulation of activities associated with offshore petroleum exploration, production, and storage. Under the Act, the Commonwealth-Victoria Offshore Petroleum Joint Authority, acting through its delegate, has the authority to manage and regulate offshore petroleum activities within the jurisdiction of the Commonwealth and Victoria. The variation of Pipeline Licence VIC/PL14, as detailed in the gazette, is an example of the practical application of this legislation. The variation modifies the pipeline route and specifications to ensure alignment with current operational needs and safety standards, reflecting the policy objective of maintaining effective and safe management of offshore infrastructure. This variation underscores the Act's role in facilitating necessary adjustments to infrastructure while upholding stringent safety and environmental criteria.

Scope and Application

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 applies to the regulation of offshore petroleum activities, including the licensing and operation of pipelines used for the transportation of hydrocarbons in Commonwealth waters, which are defined as waters beyond the territorial sea of Australia. The Act applies to entities such as Esso Australia Resources Pty Ltd and Woodside Energy (Bass Strait) Pty Ltd, who are the registered titleholders of the pipeline licence VIC/PL14. This Act governs the conduct and operations of these entities, ensuring compliance with safety, environmental, and operational standards. The Act extends to the Commonwealth and state waters of Victoria, reflecting its jurisdictional reach. This legislation does not explicitly state exclusions or exemptions but allows for the regulation of pipeline activities through subordinate instruments, which provide further detail on technical specifications, safety standards, and environmental protections. These variations, such as the one altering the VIC/PL14 Pipeline Licence, ensure that the pipeline operations are conducted in a manner that adheres to the stringent safety and environmental requirements set out by the Act.

Key Provisions

The main operative sections of this variation pertain to the detailed specifications of the West Kingfish to Kingfish A pipeline, outlined in Sections 226, 264, and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006. Specifically, Section 226 allows for the variation of pipeline licences to ensure alignment with operational needs and safety standards, while Section 264 mandates the adherence to specific design and construction parameters. Section 708 details the administrative process by which these variations are enacted. The Licence, originally granted on 29 October 1981, is modified to update the pipeline route (Section 226(1)) and the technical specifications (Section 264(1)). These changes include alterations to the pipeline's physical route, which now starts at the subsea cut location near the West Kingfish platform and ends at the subsea cut location near the Kingfish A platform, as detailed in the new First Schedule. The Second Schedule further specifies the pipeline's design, materials of construction, and protective coatings, replacing the original specifications with updated parameters. The obligations imposed by this variation require Esso Australia Resources Pty Ltd and Woodside Energy (Bass Strait) Pty Ltd, as the registered titleholders, to conform to the new specifications and route. This involves ensuring the pipeline is constructed and maintained in accordance with the updated design and material standards. The titleholders must also ensure that the pipeline's operation complies with the updated technical specifications, including the specified flow rate, internal design pressure, and specific gravity. Additionally, the titleholders are responsible for implementing and maintaining the protective coatings and cathodic protection systems as detailed in the Second Schedule. The Act does not explicitly detail offences, penalties, or civil/criminal consequences for breach within the text of the variation. However, breaches of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 can generally lead to significant penalties, including fines and imprisonment. The severity of these penalties would depend on the nature and extent of the breach, with potential maximum penalties set out in the broader legislative framework. Non-compliance with the detailed specifications and obligations imposed by this variation could potentially result in enforcement actions by the relevant authorities, including the imposition of fines, suspension or revocation of the pipeline licence, and other regulatory measures designed to ensure safety and compliance with the Act.

Legal classification tags

Area of Law
Environmental Law
Energy Law
Instrument
Gazette Notice
Concepts
Definitions & Interpretation
Licensing & Registration
Reporting & Disclosure Obligations
Enforcement Powers
Regulatory Standards

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.