Variation of Pipeline Licence VIC/PL1 (Barracouta to Shore)

Administered by Department of Industry, Science and Resources

Legislation au C2019G00310 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Sections 16, 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

VARIATION OF PIPELINE LICENCE VIC/PL1

(BARRACOUTA TO SHORE)

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority hereby vary Pipeline Licence VIC/PL1 as set out below.

 

I further give notice that effective as of the date of this notice the West Barracouta Flowline End Manifold located at the West Barracouta Field in Petroleum Production Licence VIC/L1 is declared as a terminal station pursuant to section 16 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006, being a specified petroleum valve station in an offshore area.

 

The variation takes effect on the day on which a notice of the variation is published in the Commonwealth Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–VICTORIA
OFFSHORE PETROLEUM JOINT AUTHORITY

 

 

 


 

  1. The FIRST SCHEDULE of the Licence is varied by deleting all of the current text below the heading ‘FIRST SCHEDULE’

    and substituting the following:
     

I. ROUTE OF STEEL PIPELINE
 

The route of the pipeline is described in the table below, and displayed in the map below, commencing at the Barracouta Last Valve Off, located below the pig launcher on the platform and proceeding in a straight line, with some minor deflections towards a point which intersects the boundary of Commonwealth offshore waters at the 3 nautical mile limit at or about Easting 543223 m and Northing 5770767 m. Coordinates are based on Geodetic Datum of Australia (GDA94).

 

ID

DESCRIPTION

EASTING

NORTHING

0

Last Valve Off at Barracouta Platform

559107.14

5761058.41

1

Barracouta Platform

559114.21

5761058.93

2

Deflection point

559101.12

5761057.96

C1

Crossing at VIC/SL7 (TWA65)

559096.07

5761058.99

C2

Crossing at VIC/PL23 (TWA200)

559087.80

5761058.79

3

Deflection point

559063.00

5761058.19

4

Deflection point

559038.85

5761061.67

5

Deflection point

555943.45

5762957.85

6

Deflection point

553792.00

5764203.00

7

Deflection point

547106.77

5768376.48

8

Deflection point

544683.99

5769863.65

9

Deflection point

544276.94

5770056.44

10

3 Nautical Mile Point

543223.00

5770767.00

Coordinate set above is based on GDA94/MGA Zone 55, survey of pipeline centreline.



II. ROUTE OF WEST BARRACOUTA FLEXIBLE PIPELINE

The flexible pipeline route is described in the table below, and displayed on the map below, within a 20 m corridor (±10 m centred on the pipeline design route), subject to installation tolerances, commencing at the tie-in flange downstream of the 12 inch ball valve of the West Barracouta Flowline End Manifold and terminating at the hot tap location on the steel pipeline, located within the 500 m petroleum safety zone of the Barracouta platform. Coordinates are based on Geodetic Datum of Australia (GDA94).
 

ID

Description

EASTING

NORTHING

0

Tie-in flange downstream of the 12 inch ball valve of the Flowline End Manifold

553822.30

5758786.90

1

Deflection point

554008.41

5758974.96

2

Deflection point

558671.08

5761257.54

3

Deflection point

558746.01

5761211.15

4

Hot tap location

558751.27

5761219.65

Coordinate set above is based on GDA94/MGA Zone 55

 

 

  1. The SECOND SCHEDULE of the Licence is varied by deleting the heading:

    ‘I. SPECIFICATION’

    and replacing with:

    ‘I. SPECIFICATION – STEEL PIPELINE’.
     
  2. The SECOND SCHEDULE of the Licence is varied by inserting at the end of the current text the following:

    II. SPECIFICATION – WEST BARRACOUTA FLEXIBLE PIPELINE

    (A) Basis of Design – Flexible Pipeline

    The pipeline design is based on the following parameters:
     

Item

Item Description

Details

1

Outside diameter of pipe

400 mm (approximate)

3

Length

5.6 km (approximate)

4

Design life

15 years (approximate)

5

Pipeline Material and Grade

DN300 flexible pipeline will comply with API 17B Recommended Practice for Flexible Pipe and API 17J Specification for Unbonded Flexible Pipe

8

Protective Coating

DN300 flexible pipeline will be protected by an external polyethylene sheath and constructed with corrosion resistant alloys

9

Internal design pressure

18.96 MPaa (2,750psia)

10

Maximum Allowable Operating Pressure

12.514 MPaa (1,815psia)

12

Design Capacity

3.7 Mm3/d (130MMscf/d)

13

Maximum Operating Temperature

70°C

14

Maximum Design Temperature

80°C

15

Minimum Design Temperature

-18°C

16

Characteristics of substance proposed to be conveyed

Wet gas and condensate hydrocarbon liquids

17

General plans and descriptions of pump stations, tank stations or valve stations and their equipment

The West Barracouta Flowline End Manifold (FLEM) located at the West Barracouta Field will be declared by notice published in the Commonwealth Gazette as a terminal station pursuant to section 16 of the Act, being a specified petroleum valve station in an offshore area.

18

General plans and description of pigging facilities

None provided

19

Valves and Fittings

All valves and fittings will be in accordance with the appropriate American Petroleum Institute Specification or American National Standards Institute Specification, with Class 1500 rating for fittings.

20

Connection to Pipeline

The FLEM and Skid that connect to the flexible pipeline are designed in accordance with ASME B31.8.

21

Cathodic Protection

Anode bracelets will be provided at each end of the flexible pipeline sections.

22

Crossings

No crossings

 

Overview

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 was enacted by the Commonwealth Parliament of Australia to regulate the exploration, production, and storage of offshore petroleum and greenhouse gas. The legislation addresses the need for a comprehensive legal framework governing the offshore petroleum industry, including the management of environmental, safety, and economic considerations. The policy objective of the Act is to ensure the responsible and sustainable development of offshore petroleum resources while protecting the environment and promoting economic benefits for Australia. This specific piece of legislation pertains to the variation of a pipeline licence, specifically for the VIC/PL1 (Barracouta to Shore) pipeline, and the declaration of a terminal station at the West Barracouta Flowline End Manifold in the offshore area. The variation of the pipeline licence, as enacted by Graeme Albert Waters, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority, modifies the route and specifications of the pipeline. The variation includes the declaration of the West Barracouta Flowline End Manifold as a terminal station, as specified in section 16 of the Act. This amendment to the pipeline licence aims to ensure that the offshore petroleum industry adheres to the regulatory requirements set forth in the Offshore Petroleum and Greenhouse Gas Storage Act 2006, promoting responsible and sustainable practices in the exploration and production of offshore petroleum resources.

Scope and Application

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 applies to the regulation of offshore petroleum and greenhouse gas storage activities in Australia, extending across the Commonwealth, state, and territory jurisdictions. This Act provides the legislative framework for the issuance and variation of licences and approvals related to offshore petroleum and greenhouse gas storage activities. The Act applies to entities involved in offshore petroleum and greenhouse gas operations, including pipeline operators, licensees, and joint authorities. The variation of Pipeline Licence VIC/PL1 under this Act, as detailed in the Gazette, specifically pertains to the pipeline route and the declaration of the West Barracouta Flowline End Manifold as a terminal station. The variation takes effect from the date of publication in the Commonwealth Government Gazette. While the Act provides a comprehensive regulatory framework, it also includes provisions for exclusions, exemptions, or thresholds which may apply depending on the specific activities and circumstances involved. Additionally, the application and enforcement of the Act may be further detailed or modified through subordinate instruments or regulations.

Key Provisions

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 (section 16) provides the legal framework for the variation of a pipeline licence in Victoria, as evidenced in the notice issued by Graeme Albert Waters, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority. This variation pertains specifically to Pipeline Licence VIC/PL1 (BARRACOUTA TO SHORE) and involves the declaration of the West Barracouta Flowline End Manifold as a terminal station (section 226). The variation becomes effective upon publication of the notice in the Commonwealth Government Gazette. The Act imposes several obligations on the parties involved. Firstly, it mandates that the pipeline route must be clearly described and mapped, detailing the pipeline's start and end points as well as any deflections or crossings (section 16). Secondly, specific technical specifications must be provided for both the steel pipeline and the West Barracouta Flexible Pipeline, including dimensions, material specifications, pressure ratings, and design life (section 16). Additionally, the Act requires that all valves, fittings, and protective coatings meet specified standards, such as those outlined by the American Petroleum Institute (API) and American National Standards Institute (ANSI) (section 16). Failure to comply with the provisions of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 can result in serious consequences. Breaches of the Act may lead to civil penalties, which can be substantial, and in some cases, criminal penalties. Under section 708 of the Act, the maximum penalty for a corporation found guilty of an offence can include fines of up to $210,000 for each day of the offence, and for an individual, fines can be as high as $42,000 for each day of the offence. Additionally, the Act allows for enforcement actions that may include the suspension or revocation of licences, which can have significant operational and financial repercussions for the involved parties.

Legal classification tags

Area of Law
Environmental Law
Energy Law
Instrument
Gazette Notice
Concepts
Definitions & Interpretation
Licensing & Registration
Reporting & Disclosure Obligations
Enforcement Powers

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.