Variation of Pipeline Licence VIC/PL1 (Barracouta to Shore)

Administered by Department of Industry, Science and Resources

Legislation au C2019G00310 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Sections 16, 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

VARIATION OF PIPELINE LICENCE VIC/PL1

(BARRACOUTA TO SHORE)

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority hereby vary Pipeline Licence VIC/PL1 as set out below.

 

I further give notice that effective as of the date of this notice the West Barracouta Flowline End Manifold located at the West Barracouta Field in Petroleum Production Licence VIC/L1 is declared as a terminal station pursuant to section 16 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006, being a specified petroleum valve station in an offshore area.

 

The variation takes effect on the day on which a notice of the variation is published in the Commonwealth Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–VICTORIA
OFFSHORE PETROLEUM JOINT AUTHORITY

 

 

 


 

  1. The FIRST SCHEDULE of the Licence is varied by deleting all of the current text below the heading ‘FIRST SCHEDULE’

    and substituting the following:
     

I. ROUTE OF STEEL PIPELINE
 

The route of the pipeline is described in the table below, and displayed in the map below, commencing at the Barracouta Last Valve Off, located below the pig launcher on the platform and proceeding in a straight line, with some minor deflections towards a point which intersects the boundary of Commonwealth offshore waters at the 3 nautical mile limit at or about Easting 543223 m and Northing 5770767 m. Coordinates are based on Geodetic Datum of Australia (GDA94).

 

ID

DESCRIPTION

EASTING

NORTHING

0

Last Valve Off at Barracouta Platform

559107.14

5761058.41

1

Barracouta Platform

559114.21

5761058.93

2

Deflection point

559101.12

5761057.96

C1

Crossing at VIC/SL7 (TWA65)

559096.07

5761058.99

C2

Crossing at VIC/PL23 (TWA200)

559087.80

5761058.79

3

Deflection point

559063.00

5761058.19

4

Deflection point

559038.85

5761061.67

5

Deflection point

555943.45

5762957.85

6

Deflection point

553792.00

5764203.00

7

Deflection point

547106.77

5768376.48

8

Deflection point

544683.99

5769863.65

9

Deflection point

544276.94

5770056.44

10

3 Nautical Mile Point

543223.00

5770767.00

Coordinate set above is based on GDA94/MGA Zone 55, survey of pipeline centreline.



II. ROUTE OF WEST BARRACOUTA FLEXIBLE PIPELINE

The flexible pipeline route is described in the table below, and displayed on the map below, within a 20 m corridor (±10 m centred on the pipeline design route), subject to installation tolerances, commencing at the tie-in flange downstream of the 12 inch ball valve of the West Barracouta Flowline End Manifold and terminating at the hot tap location on the steel pipeline, located within the 500 m petroleum safety zone of the Barracouta platform. Coordinates are based on Geodetic Datum of Australia (GDA94).
 

ID

Description

EASTING

NORTHING

0

Tie-in flange downstream of the 12 inch ball valve of the Flowline End Manifold

553822.30

5758786.90

1

Deflection point

554008.41

5758974.96

2

Deflection point

558671.08

5761257.54

3

Deflection point

558746.01

5761211.15

4

Hot tap location

558751.27

5761219.65

Coordinate set above is based on GDA94/MGA Zone 55

 

 

  1. The SECOND SCHEDULE of the Licence is varied by deleting the heading:

    ‘I. SPECIFICATION’

    and replacing with:

    ‘I. SPECIFICATION – STEEL PIPELINE’.
     
  2. The SECOND SCHEDULE of the Licence is varied by inserting at the end of the current text the following:

    II. SPECIFICATION – WEST BARRACOUTA FLEXIBLE PIPELINE

    (A) Basis of Design – Flexible Pipeline

    The pipeline design is based on the following parameters:
     

Item

Item Description

Details

1

Outside diameter of pipe

400 mm (approximate)

3

Length

5.6 km (approximate)

4

Design life

15 years (approximate)

5

Pipeline Material and Grade

DN300 flexible pipeline will comply with API 17B Recommended Practice for Flexible Pipe and API 17J Specification for Unbonded Flexible Pipe

8

Protective Coating

DN300 flexible pipeline will be protected by an external polyethylene sheath and constructed with corrosion resistant alloys

9

Internal design pressure

18.96 MPaa (2,750psia)

10

Maximum Allowable Operating Pressure

12.514 MPaa (1,815psia)

12

Design Capacity

3.7 Mm3/d (130MMscf/d)

13

Maximum Operating Temperature

70°C

14

Maximum Design Temperature

80°C

15

Minimum Design Temperature

-18°C

16

Characteristics of substance proposed to be conveyed

Wet gas and condensate hydrocarbon liquids

17

General plans and descriptions of pump stations, tank stations or valve stations and their equipment

The West Barracouta Flowline End Manifold (FLEM) located at the West Barracouta Field will be declared by notice published in the Commonwealth Gazette as a terminal station pursuant to section 16 of the Act, being a specified petroleum valve station in an offshore area.

18

General plans and description of pigging facilities

None provided

19

Valves and Fittings

All valves and fittings will be in accordance with the appropriate American Petroleum Institute Specification or American National Standards Institute Specification, with Class 1500 rating for fittings.

20

Connection to Pipeline

The FLEM and Skid that connect to the flexible pipeline are designed in accordance with ASME B31.8.

21

Cathodic Protection

Anode bracelets will be provided at each end of the flexible pipeline sections.

22

Crossings

No crossings

 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.