Variation of Petroleum Pipeline Licence WA-24-PL (GWF-1)

Administered by Department of Industry, Science and Resources

Legislation au C2015G00417 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Section 708

 

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

VARIATION OF PETROLEUM PIPELINE LICENCE WA-24-PL (GWF-1)

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth-Western Australia Offshore Petroleum Joint Authority hereby give notice of the variation of Petroleum Pipeline Licence WA-24-PL for which

 

Woodside Energy Ltd

(ABN 63 005 482 986)

 

Shell Australia Pty Ltd

(ACN 009 663 576)

 

BHP Billiton Petroleum (North West Shelf) Pty Ltd

(ABN 41 004 514 489)

 

Japan Australia LNG (MIMI) Pty Ltd

(ABN 18 006 303 180)

 

BP Developments Australia Pty Ltd

(ABN 54 081 102 856)

 

Chevron Australia Pty Ltd

(ABN 29 086 197 757)

 

are the registered titleholders.   

 

  1. The Route of The Pipeline is varied by deleting the table on page 2 and replacing it with the following table:

 

No.

Feature Name

Easting (mE)

Northing (mN)

1

TPA Manifold

383,721.56

7,814,441.65

2

TPA Tie-In (F6)

383,660.13

7,814,473.88

3

Clamp B Pile – West – 0100-4

383,468.20

7,815,178.60

4

Clamp B Pile – East – 0100-1

383,497.80

7,815,186.00

5

Clamp B Datum – KP 0.0750

383,476.26

7,815,207.41

6

GSA Tie-In 1 (F8)

382,910.89

7,817,444.55

7

GSA Tie-In Skid

382,950.43

7,817,503.11

8

GSA Tie-In 2 (F19)

382,888.53

7,817,532.30

9

Clamp A Pile – West – 0100-2

382,694.50

7,818,234.90

10

Clamp A Pile – East – 0100-3

382,724.70

7,818,242.00

11

Clamp A Datum – KP 3.904

382,703.16

7,818,262.72

12

GDA Tie-In 1 (F22)

382,137.15

7,820,505.50

13

GDA Manifold

382,176.20

7,820,564.15

14

GDA Tie-In 2 (F33)

382,136.92

7,820,645.66

15

Buckle Initiator 1 (BI-1)

383,236.28

7,821,861.60

16

Buckle Initiator 2 (BI-2)

384,108.17

7,823,261.26

17

Buckle Initiator 3 (BI-3)

385,207.10

7,824,483.37

18

Buckle Initiator 4 (BI-4)

386,501.43

7,825,498.49

19

GWA Tie-In Spool Flange (F36)

387,599.75

7,826,720.96

20

GWA SSIV Structure

387,678.51

7,826,702.11

21

GWA Platform

387,795.24

7,826,652.51

 

2.             The Schedule of Specifications is varied only by deleting dot point No. 2 of the Basis of Design and replacing it with the following:

 

  • design temperatures as set out in the table below:

 

GDA/TPA Manifolds and GSA Tie-In Skid

-29 deg C

Tie-In Spool Pieces

-20 deg C

Pipeline Transitions: (Min. length of 150m from tie-in spool downstream of TPA, GSA manifold headers and the GDS tie-in skid)

-10 deg C

Remainder of pipeline

-5 deg C

 

The rest of the Schedule of Specifications remains as stated in the licence instrument dated
18 December 2012.

 

3.             The Greater Western Flank Phase 1 (GWF-1) Pipeline Route Map on page 4 is deleted and replaced with the map at Attachment 1.

 

 

 

This notice takes effect on the day on which it appears in the Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH-WESTERN AUSTRALIA

OFFSHORE PETROLEUM JOINT AUTHORITY


 

 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.