COMMONWEALTH OF AUSTRALIA
Section 708
Offshore Petroleum and Greenhouse Gas Storage Act 2006
VARIATION OF PETROLEUM PIPELINE LICENCE WA-24-PL (GWF-1)
I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth-Western Australia Offshore Petroleum Joint Authority hereby give notice of the variation of Petroleum Pipeline Licence WA-24-PL for which
Woodside Energy Ltd
(ABN 63 005 482 986)
Shell Australia Pty Ltd
(ACN 009 663 576)
BHP Billiton Petroleum (North West Shelf) Pty Ltd
(ABN 41 004 514 489)
Japan Australia LNG (MIMI) Pty Ltd
(ABN 18 006 303 180)
BP Developments Australia Pty Ltd
(ABN 54 081 102 856)
Chevron Australia Pty Ltd
(ABN 29 086 197 757)
are the registered titleholders.
- The Route of The Pipeline is varied by deleting the table on page 2 and replacing it with the following table:
No. | Feature Name | Easting (mE) | Northing (mN) |
1 | TPA Manifold | 383,721.56 | 7,814,441.65 |
2 | TPA Tie-In (F6) | 383,660.13 | 7,814,473.88 |
3 | Clamp B Pile – West – 0100-4 | 383,468.20 | 7,815,178.60 |
4 | Clamp B Pile – East – 0100-1 | 383,497.80 | 7,815,186.00 |
5 | Clamp B Datum – KP 0.0750 | 383,476.26 | 7,815,207.41 |
6 | GSA Tie-In 1 (F8) | 382,910.89 | 7,817,444.55 |
7 | GSA Tie-In Skid | 382,950.43 | 7,817,503.11 |
8 | GSA Tie-In 2 (F19) | 382,888.53 | 7,817,532.30 |
9 | Clamp A Pile – West – 0100-2 | 382,694.50 | 7,818,234.90 |
10 | Clamp A Pile – East – 0100-3 | 382,724.70 | 7,818,242.00 |
11 | Clamp A Datum – KP 3.904 | 382,703.16 | 7,818,262.72 |
12 | GDA Tie-In 1 (F22) | 382,137.15 | 7,820,505.50 |
13 | GDA Manifold | 382,176.20 | 7,820,564.15 |
14 | GDA Tie-In 2 (F33) | 382,136.92 | 7,820,645.66 |
15 | Buckle Initiator 1 (BI-1) | 383,236.28 | 7,821,861.60 |
16 | Buckle Initiator 2 (BI-2) | 384,108.17 | 7,823,261.26 |
17 | Buckle Initiator 3 (BI-3) | 385,207.10 | 7,824,483.37 |
18 | Buckle Initiator 4 (BI-4) | 386,501.43 | 7,825,498.49 |
19 | GWA Tie-In Spool Flange (F36) | 387,599.75 | 7,826,720.96 |
20 | GWA SSIV Structure | 387,678.51 | 7,826,702.11 |
21 | GWA Platform | 387,795.24 | 7,826,652.51 |
2. The Schedule of Specifications is varied only by deleting dot point No. 2 of the Basis of Design and replacing it with the following:
- design temperatures as set out in the table below:
GDA/TPA Manifolds and GSA Tie-In Skid | -29 deg C |
Tie-In Spool Pieces | -20 deg C |
Pipeline Transitions: (Min. length of 150m from tie-in spool downstream of TPA, GSA manifold headers and the GDS tie-in skid) | -10 deg C |
Remainder of pipeline | -5 deg C |
The rest of the Schedule of Specifications remains as stated in the licence instrument dated
18 December 2012.
3. The Greater Western Flank Phase 1 (GWF-1) Pipeline Route Map on page 4 is deleted and replaced with the map at Attachment 1.
This notice takes effect on the day on which it appears in the Australian Government Gazette.
Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia.
GRAEME ALBERT WATERS
TITLES ADMINISTRATOR
ON BEHALF OF THE COMMONWEALTH-WESTERN AUSTRALIA
OFFSHORE PETROLEUM JOINT AUTHORITY