Radiocommunications (Digital Radio Channels - South Australia) Plan 2007

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2007L04666 In force Legislative Instrument

Legislation content

Radiocommunications (Digital Radio Channels — South Australia) Plan 2007

as amended

made under subsection 44A (1) of the

Radiocommunications Act 1992

This compilation was prepared on 29 June 2015
taking into account amendments up to Radiocommunications (Digital Radio Channels — South Australia) Plan Variation 2015 (No. 1)

Prepared by the Australian Communications and Media Authority

Contents

1  Name of Plan [see Note 1]

2  Commencement [see Note 1]

3  Definitions 

3A  Dividing line 

4  Digital radio channel plans 

5  Maximum ERP limits

6  Co-channel transmitters 

Schedule 1 Adelaide RA1 

Notes to the Radiocommunications (Digital Radio Channels — South Australia) Plan 2007

 

 

 

1 Name of Plan [see Note 1]

  This Plan is the Radiocommunications (Digital Radio Channels — South Australia) Plan 2007.

2 Commencement [see Note 1]

  This Plan commences on the day after it is registered.

3 Definitions

  In this Plan:

Act means the Radiocommunications Act 1992.

category means a category of digital radio multiplex transmitter licence described in section 5 of the Act.

DAB means digital audio broadcasting.

depression angle means the angle between the horizontal line and the dividing line.

designated BSA radio area means:

 (a) the BSA licence area (within the meaning of the Broadcasting Services Act 1992) of a commercial radio broadcasting licence; or

 (b) the BSA licence area of a community radio broadcasting licence, where that BSA licence area is the same (or is deemed to be the same) as the BSA licence area of a commercial radio broadcasting licence.

dividing line — see section 3A.

ERP means effective radiated power.

frequency block means a frequency channel of 1.536 MHz bandwidth.

horizontal line means a horizontal line at the maximum antenna height of an antenna.

maximum antenna height means the maximum permitted height above ground level of the electrical centre of an antenna.

technical planning guidelines means the guidelines made under section 33 of the Broadcasting Services Act 1992, as in force from time to time.

3A Dividing line

 (1) In this Plan, dividing line means a line from a point at the maximum antenna height of an antenna to a point on the Earth below the horizontal line.

 (2) For subsection (1), if a negative value is specified in the depression angle, the point on the Earth is above the horizontal line.

4 Digital radio channel plans

 (1) For subsection 44A (1) of the Act, each Schedule is a digital radio channel plan for the designated BSA radio area specified in that Schedule.

 (2) The digital radio channel plan specified in a Schedule:

 (a) allots a frequency block or blocks in relation to the designated BSA radio area for use by digital radio multiplex transmitter licensees; and

 (b) reserves a frequency block for a category 3 digital radio multiplex transmitter licence for the designated BSA radio area to be issued in accordance with subsection 102E (2) of the Act; and

 (c) determines which of the following types of licences, or which combination of the following types of licences, are to be issued for the designated BSA radio area:

 (i) category 1 digital radio multiplex transmitter licence;

 (ii) category 2 digital radio multiplex transmitter licence; and

 (d) if a particular type of licence mentioned in paragraph (c) is to be issued for the designated BSA radio area — determines whether:

 (i) a single licence of that type is to be issued for the designated BSA radio area; or

 (ii) 2 or more licences of that type are to be issued for the designated BSA radio area; and

 (e) determines technical specifications of multiplex transmitters operated under digital radio multiplex transmitter licences for the designated BSA radio area.

Note   The relevant technical specifications are set out in each Schedule as “attachments”.

5 Maximum ERP limits

 (1) For each digital radio multiplex transmitter, the ERP of that transmitter in any part of a sector or bearing must not exceed the maximum ERP specified in the output radiation pattern table for that sector or bearing.

 (2) If the output radiation pattern table for a digital radio multiplex transmitter specifies 2 maximum ERP values for a sector or bearing, the ERP of the transmitter in that sector or bearing must not exceed:

 (a) for a point at or above the dividing line — the maximum ERP in the column headed “At or above dividing line”; and

 (b) for a point below the dividing line — the maximum ERP in the column headed “Below dividing line”.

 (3) The licensee of a digital radio multiplex transmitter must, if requested by ACMA to do so, demonstrate, to the satisfaction of ACMA, that the ERP of a transmitter in any part of a sector or bearing specified by ACMA complies with this section.

6 Co-channel transmitters

The technical specifications for a co-channel transmitter licensed under a relevant digital radio multiplex transmitter licence are those determined by the technical planning guidelines.

Note   As at the date of the commencement of this section, the technical specifications for a co-channel transmitter licensed under a relevant digital radio multiplex transmitter are set out in Division 8 of Part 8 of the Broadcasting Services (Technical Planning) Guidelines 2007.

 

Schedule 1 Adelaide RA1

(subsection 4 (1))

 

Designated BSA radio area

Adelaide RA1

Table 1 Frequency channels

 

Column 1

Multiplex Name

Column 2

Frequency block

Column 3

Reserved frequency block

Column 4

Centre frequency (MHz)

Column 5

Category

Column 6

Technical Specification Number

Column 7

Technical Specifications (Attachment number)

Adelaide 1

9B

No

204.640

1

TS1132972

1.1

Adelaide 2

9C

Yes

206.352

3

TS1132973

1.2

Table 2 Number of licences to be issued

 

Column 1

Licence Category

Column 2

Number of licences

Category 1

1

Category 2

0

Category 3

1

Attachment 1.1 Multiplex Adelaide 1

 

Column 1

Technical specification

Column 2

Details

Category

1

General Area Served

Adelaide

Mode

DAB

Specification number

TS1132972

Transmitter Site

 

Nominal Location

NTL Tower

Summit Road

CRAFERS

Australian Map Grid Reference 1966

Zone Easting Northing

54 290707 6126723

Site Tolerance

Refer to technical planning guidelines

Emission

 

Frequency Band

VHF

Centre Frequency

204.640 MHz (Frequency Block 9B)

Polarisation

Vertical

Maximum antenna height

145 m

Output Radiation Pattern

Bearing or sector

(clockwise direction)

Depression angle

Maximum ERP

At or above dividing line

Below dividing line

 0 °T  70 °T

0.8°

21 kW

50 kW

 70 °T  120 °T

1.0°

1.6 kW

50 kW

 120 °T  140 °T

0.6°

2.1 kW

50 kW

 140 °T  145 °T

0.6°

4.5 kW

50 kW

 145 °T  295 °T

All angles

50 kW

 295 °T  340 °T

0.8°

13.5 kW

50 kW

 340 °T  360 °T

0.8°

21 kW

50 kW

Attachment 1.2 Multiplex Adelaide 2

 

Column 1

Technical specification

Column 2

Details

Category

3

General Area Served

Adelaide

Mode

DAB

Specification number

TS1132973

Transmitter Site

 

Nominal Location

NTL Tower

Summit Road

CRAFERS

Australian Map Grid Reference 1966

Zone Easting Northing

54 290707 6126723

Site Tolerance

Refer to technical planning guidelines

Emission

 

Frequency Band

VHF

Centre Frequency

206.352 MHz (Frequency Block 9C)

Polarisation

Vertical

Maximum antenna height

145 m

Output Radiation Pattern

Bearing or sector

(clockwise direction)

Depression angle

Maximum ERP

At or above dividing line

Below dividing line

 0 °T  70 °T

0.8°

21 kW

50 Kw

 70 °T  120 °T

1.0°

1.6 kW

50 kW

 120 °T  140 °T

0.6°

2.1 kW

50 kW

 140 °T  145 °T

0.6°

4.5 kW

50 kW

 145 °T  295 °T

All angles

50 kW

 295 °T  340 °T

0.8°

13.5 kW

50 kW

 340 °T  360 °T

0.8°

21 kW

50 kW

 

Notes to the Radiocommunications (Digital Radio Channels — South Australia) Plan 2007

Note 1

The Radiocommunications (Digital Radio Channels — South Australia) Plan 2007 (in force under subsection 44A (1) of the Radiocommunications Act 1992) as shown in this compilation is amended as indicated in the Tables below.

Table of Instruments

Title

Date of FRLI registration

Date of
commencement

Application, saving or
transitional provisions

Radiocommunications (Digital Radio Channels — South Australia) Plan 2007

10 Dec 2007 (see F2007L04666)

11 Dec 2007

 

Radiocommunications (Digital Radio Channels — South Australia) Plan Variation 2008 (No. 1)

19 Jan 2009 (see F2009L00102)

20 Jan 2009

Radiocommunications (Digital Radio Channels — South Australia) Plan Variation 2015 (No. 1)

11 May 2015(see F2015L00669)

12 May 2015

Table of Amendments

ad. = added or inserted      am. = amended      rep. = repealed      rs. = repealed and substituted

Provision affected

How affected

S. 3.................

am. 2008 No. 1

S. 3A................

ad. 2008 No. 1

S. 5.................

ad. 2008 No. 1

S. 6.................

ad. 2015 No. 1

Schedule 1

 

Schedule 1............

am. 2008 No. 1

 

 

Overview

The Radiocommunications (Digital Radio Channels — South Australia) Plan 2007 was enacted to address the need for efficient and organised digital radio broadcasting in South Australia. This plan was made under the authority of the Radiocommunications Act 1992 by the Australian Communications and Media Authority (ACMA). The purpose of this legislation is to allocate frequency blocks and establish technical specifications for digital radio multiplex transmitters in South Australia, ensuring the smooth and effective operation of digital audio broadcasting (DAB) services within the region. The plan outlines the frequency allocation, licensing requirements, and maximum effective radiated power (ERP) limits for digital radio multiplex transmitters, thereby facilitating the coordination and management of digital radio transmissions in the area. This initiative aims to support the growth and development of digital radio services, enhancing the quality and accessibility of radio content for listeners in South Australia.

Scope and Application

The Radiocommunications (Digital Radio Channels — South Australia) Plan 2007, as amended, applies to digital radio multiplex transmitter licensees operating within the designated BSA radio area of South Australia, specifically the Adelaide RA1 area. This plan allocates frequency blocks for digital radio multiplex transmitters, reserves a frequency block for category 3 digital radio multiplex transmitter licences, and determines the types and number of licences to be issued. Additionally, it sets technical specifications for digital radio multiplex transmitters, including maximum effective radiated power (ERP) limits and technical planning guidelines. The plan is made under subsection 44A (1) of the Radiocommunications Act 1992, and its scope and application are subject to amendments through subordinate instruments such as the Radiocommunications (Digital Radio Channels — South Australia) Plan Variation 2008 (No. 1) and the Radiocommunications (Digital Radio Channels — South Australia) Plan Variation 2015 (No. 1). These variations adjust the frequency allocations and technical specifications as required, ensuring the plan remains current and compliant with legislative changes.

Key Provisions

The Radiocommunications (Digital Radio Channels — South Australia) Plan 2007 (the Plan) outlines the regulatory framework for the allocation and use of digital radio channels in South Australia. It specifies the frequency blocks to be used, the types of digital radio multiplex transmitter licences to be issued, and the technical specifications for these transmitters (section 4). The Plan also sets maximum ERP limits for digital radio multiplex transmitters to ensure that the emissions do not exceed specified levels in any sector or bearing (section 5). Furthermore, it defines the technical specifications for co-channel transmitters based on the technical planning guidelines (section 6). The Plan imposes several obligations on the parties it governs. Licence holders must ensure that their transmitters comply with the specified ERP limits in any part of a sector or bearing (section 5(1)). If requested by the Australian Communications and Media Authority (ACMA), licence holders must demonstrate that their transmitters comply with these ERP limits (section 5(3)). Additionally, the technical specifications for co-channel transmitters are governed by the technical planning guidelines (section 6). Failure to comply with the provisions of the Plan can result in significant consequences. While the Plan does not explicitly list penalties, breaches of the Radiocommunications Act 1992, under which this Plan is made, can lead to enforcement actions by ACMA. Possible outcomes include fines, orders to cease transmission, or the revocation of licences. The exact penalties for breaches depend on the nature and severity of the offence, as stipulated in the overarching Radiocommunications Act 1992. The maximum penalties under this Act can include substantial fines and imprisonment for serious offences, as determined by the courts.

Legal classification tags

Area of Law
Telecommunications Law
Instrument
Legislative Instrument
Concepts
Definitions & Interpretation
Reporting & Disclosure Obligations
Regulatory Standards

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.