Part 101 Manual of Standards (Extensions of Time Due to COVID-19) Amendment Instrument 2020 (No. 1)

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2020L00394 Not in force Legislative Instrument

Legislation content

Explanatory Statement

Civil Aviation Safety Regulations 1998

Part 101 Manual of Standards (Extensions of Time Due to COVID-19) Amendment Instrument 2020 (No. 1)

 

Purpose

The Part 101 (Unmanned Aircraft and Rockets) Manual of Standards 2019 (the MOS) prescribes a range of miscellaneous matters in relation to the safety and regulatory oversight of remotely piloted aircraft (RPA), including training and competency standards for remote pilot licences, and standing approvals for certain kinds of operations near aerodromes and beyond visual line of sight (VLOS) provided they meet conditions and requirements prescribed by the MOS.

 

The MOS was expressed to commence on the day of registration but, effectively, only certain provisions took effect on that date, for example, relating to flight beyond VLOS operations, and certain notifications be given to CASA. Implementation of the remaining provisions was deferred for 12 months to 10 April 2020 (in one instance, for 18 months), to enable RPA training organisations in particular to prepare for the transition.

 

As with the aviation industry generally, RPA training organisations have been faced with the progressively dire implications of the COVID-19 pandemic, the associated state of emergency across Australia and the need to maximise the remedial effects of travel bans and social distancing rules. Largely because of this, and its impacts, for example, on mobility and staffing, it has proved to be impracticable for a large number of the training organisations to finalise their required training documented practices and procedures for CASA approval by properly incorporating all of the relevant elements from the new training syllabus contained in the MOS.

 

The Part 101 Manual of Standards (Extensions of Time Due to COVID-19) Amendment Instrument 2020 (No. 1) (the MOS amendment) is, therefore, designed to defer for 6 months the 10 April 2020 take effect date for most of the provisions in the MOS, in particular those relating to training course.

 

Legislation — the Act

Under subsection 98 (1) of the Civil Aviation Act 1988 (the Act), the Governor-General may, among other things, make regulations prescribing matters required, permitted, necessary or convenient for the Act and in the interests of the safety of air navigation. Part 101 of the Civil Aviation Safety Regulations 1998 (CASR) deals with the operation of unmanned aircraft, rockets and fireworks.

 

Legislation — Part 101 of CASR

Under regulation 101.028, CASA may issue a MOS prescribing matters required or permitted by the Regulations to be prescribed, or necessary or convenient to be prescribed for carrying out or giving effect to Part 101.

 

Legislation Acts Interpretation Act 1901

Under subsection 33 (3) of the Acts Interpretation Act 1901, where an Act confers a power to make, grant or issue any instrument of a legislative or administrative character (including rules, regulations or by-laws), the power shall be construed as including a power exercisable in the like manner and subject to the like conditions (if any) to repeal, rescind, revoke, amend, or vary any such instrument.

The MOS amendment

The MOS amendment repeals section 1.03 of the MOS (Provisions which take effect later than on commencement) and substitutes a new section 1.03 which retabulates the take effect dates for the provisions of the MOS which did not take effect on commencement.

 

Thus, all of Chapter 2, concerning training courses (and training instructors) will now take effect 6 months later on the deferred date of 10 October 2020 (this was the original take effect date for the provisions relating to instructors).

 

Chapter 4, concerning controlled aerodromes, will take effect on 10 April 2020 as originally provided for. Chapter 9, concerning prescribed areas, will take effect on 10 April 2020 as originally provided (except Division 9.2 concerning no-fly zones which took effect on registration of the MOS). Chapter 10, concerning record keeping, will now take effect 6 months later on the deferred date of 10 October 2020 (except Divisions 10.1 and 10.4 concerning Definitions and giving certain information to CASA, which took effect on registration of the MOS).

 

Legislation Act 2003 (the LA)

Under paragraph 98 (5A) (a) of the Act, regulations made for that same provision may empower CASA to issue instruments in relation to matters affecting the safe navigation and operation of aircraft.

 

Under subsection 98 (5AA) of the Act, an instrument (like a MOS) issued under paragraph 98 (5A) (a) is taken to be a legislative instrument if it is expressed to apply in relation to a class of persons or aircraft or aeronautical products.

 

The MOS is an instrument empowered by regulation 101.028 made by the Civil Aviation Legislation Amendment (Part 101) Regulation 2016 (the amendment regulations). The relevant amendment regulation was made “For subsection 98 (5A) of the Act”.

 

The standards set by the MOS apply, not to a particular remote pilot or a particular RPA but to the class of such pilots and aircraft. The MOS is, therefore, by virtue of subsection 98 (5AA), a legislative instrument and subject to registration, and tabling and disallowance in the Parliament, under sections 15G, and 38 and 42, of the LA.

 

Consultation

CASA has been engaging with a number of RPA training organisations facing the delaying implications of the COVID-19 pandemic and who require relief from the imminence of the 10 April 2020 take effect date for the training course requirements of the MOS. In the circumstances, CASA does not consider that any further formal consultation would be useful or necessary in relation to the MOS amendment deferring relevant take effect dates to 10 October 2020.

 

Office of Best Practice Regulation (OBPR)

Under OBPR guidelines, a MOS amendment which is considered to be of a machinery nature is exempted from OBRP requirements. Insofar as the MOS amendment adjusts take effect dates for some MOS provisions, it may be considered to be of a machinery nature and exempted from OBPR requirements.

 

Statement of Compatibility with Human Rights

The Statement of Compatibility with Human Rights at Appendix 1 has been prepared in accordance with Part 3 of the Human Rights (Parliamentary Scrutiny) Act 2011. The legislative instrument does not engage any of the applicable rights and freedoms, and is, therefore, compatible with human rights, as it does not improperly infringe any human rights issues.

 

Commencement and making

The MOS amendment commences on the day it is registered. It has been made by the Director of Aviation Safety, on behalf of CASA, in accordance with subsection 73 (2) of the Act.

Appendix 1

Statement of Compatibility with Human Rights

Prepared in accordance with Part 3 of the
Human Rights (Parliamentary Scrutiny) Act 2011

 

Part 101 Manual of Standards (Extensions of Time Due to COVID-19) Amendment Instrument 2020 (No. 1)

This legislative instrument is compatible with the human rights and freedoms recognised or declared in the international instruments listed in section 3 of the Human Rights (Parliamentary Scrutiny) Act 2011.

 

Overview of the legislative instrument

The Part 101 (Unmanned Aircraft and Rockets) Manual of Standards 2019 (the MOS) prescribes a range of miscellaneous matters in relation to the safety and regulatory oversight of remotely piloted aircraft (RPA), including training and competency standards for remote pilot licences, and standing approvals for certain kinds of operations near aerodromes and beyond visual line of sight (VLOS) provided they meet conditions and requirements prescribed by the MOS.

 

The MOS was expressed to commence on the day of registration but, effectively, only certain provisions took effect on that date, for example, relating to flight beyond VLOS operations, and certain notifications be given to CASA. Implementation of the remaining provisions was deferred for 12 months to 10 April 2020 (in one instance, for18 months), to enable RPA training organisations in particular to prepare for the transition.

 

As with the aviation industry generally, RPA training organisations have been faced with the progressively dire implications of the COVID-19 pandemic, the associated state of emergency across Australia and the need to maximise the remedial effects of travel bans and social distancing rules. Largely because of this, and its impacts, for example, on mobility and staffing, it has proved to be impracticable for a large number of the training organisations to finalise their required training documented practices and procedures for CASA approval by properly incorporating all of the relevant elements from the new training syllabus contained in the MOS.

 

The Part 101 Manual of Standards (Extensions of Time Due to COVID-19) Amendment Instrument 2020 (No. 1) is, therefore, designed to defer for 6 months the 10 April 2020 take effect date for most of the provisions in the MOS, in particular those relating to training course.

 

Human rights implications

The legislative instrument is compatible with the human rights and freedoms recognised or declared in the international instruments listed in section 3 of the Human Rights (Parliamentary Scrutiny) Act 2011. The instrument does not engage any of the applicable rights or freedoms.

 

Conclusion

This legislative instrument is compatible with human rights as it does not raise any human rights issues.

 

 

Civil Aviation Safety Authority

Overview

The Civil Aviation Safety Regulations 1998 (CASR) were amended by the Part 101 Manual of Standards (Extensions of Time Due to COVID-19) Amendment Instrument 2020 (No. 1), introduced to address the challenges faced by remote pilot training organisations due to the COVID-19 pandemic. The original Manual of Standards (MOS) provisions were set to take effect on 10 April 2020, but the pandemic made it impracticable for many training organisations to finalise their required practices and procedures for CASA approval within the original timeframe. The MOS Amendment, made by the Civil Aviation Safety Authority (CASA) under the Civil Aviation Act 1988, aims to defer the take effect date of most MOS provisions, particularly those relating to training courses, by six months to 10 October 2020. This extension provides relief to training organisations struggling with the pandemic's impacts on mobility and staffing. The Civil Aviation Safety Regulations 1998 were enacted by the Parliament of Australia to ensure the safety of air navigation and the regulation of aviation activities. Under the Acts Interpretation Act 1901, the power to make regulations includes the ability to repeal, rescind, revoke, amend, or vary any such instrument. The MOS Amendment was made to address the specific challenges posed by the COVID-19 pandemic, ensuring that the necessary safety standards for remotely piloted aircraft operations could be implemented in a manner that accommodates the extraordinary circumstances faced by training organisations. The amendment aims to balance the need for timely implementation of safety regulations with the practical difficulties encountered due to the pandemic, thereby ensuring that the safety and regulatory oversight of remotely piloted aircraft can proceed without compromising on safety standards.

Scope and Application

The Civil Aviation Safety Regulations 1998, as amended by the Part 101 Manual of Standards (Extensions of Time Due to COVID-19) Amendment Instrument 2020 (No. 1), applies to all entities involved in the operation of unmanned aircraft and rockets in Australia, including remote pilot licence holders and training organisations. This legislation operates on a national level, under the purview of the Civil Aviation Act 1988, and is implemented by the Civil Aviation Safety Authority (CASA). The Act allows for the creation of regulations to ensure the safety of air navigation, and these regulations are further detailed in the Civil Aviation Safety Regulations 1998. The MOS amendment is designed to provide relief to RPA training organisations affected by the COVID-19 pandemic by deferring the effective date of certain training provisions in the MOS by six months to 10 October 2020. The amendment does not introduce any exclusions or exemptions beyond what is specified within the legislation itself. The application of the Act can be extended or restricted through subordinate instruments, which are subject to the conditions and manner prescribed under the Civil Aviation Act 1988.

Key Provisions

The Civil Aviation Safety Regulations 1998, particularly Part 101, govern the operation of unmanned aircraft and rockets in Australia. The Manual of Standards (MOS) under Part 101 prescribes various safety and regulatory matters, including training and competency standards for remote pilot licenses and operations near aerodromes. Originally, the MOS was set to commence on the day of registration with certain provisions taking immediate effect, while others were deferred for up to 18 months to allow training organisations to adjust. However, due to the COVID-19 pandemic, the MOS Amendment Instrument 2020 (No. 1) was enacted to further defer the implementation of most MOS provisions by six months, specifically targeting training course requirements which were originally scheduled to take effect on 10 April 2020. The MOS Amendment Instrument imposes certain obligations on the parties it governs, primarily those involved in the operation and training of unmanned aircraft. Training organisations must now align their training practices and procedures with the updated standards by the new effective date of 10 October 2020. These organisations must ensure that all training materials and methods comply with the new standards to maintain regulatory approval from the Civil Aviation Safety Authority (CASA). The amended MOS also mandates that CASA and other regulatory bodies adjust their oversight processes to accommodate the new timelines, ensuring continued safety and compliance within the industry. The Act provides that any breach of the Civil Aviation Safety Regulations 1998 may result in civil or criminal consequences. For instance, under the Civil Aviation Act 1988, CASA has the authority to impose penalties for non-compliance. Specifically, the maximum penalties for breaches related to the operation and training of unmanned aircraft can include fines and potential imprisonment. For example, operating an unmanned aircraft in a manner that contravenes the regulations may result in a fine of up to $50,000 and/or imprisonment for up to two years. These penalties underscore the importance of adhering to the safety standards and timelines set forth in the MOS and its amendments.

Legal classification tags

Area of Law
Administrative Law
Civil Aviation Law
Instrument
Regulation
Concepts
Definitions & Interpretation
Commencement Provisions
Regulatory Standards
Enforcement Powers

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.