Net Zero Economy Authority (Eraring Power Station Geographic Area) Instrument 2025
I, David Shankey, Chief Executive Officer of the Net Zero Economy Authority, make the following notifiable instrument.
Dated 26 May 2025
David Shankey
Chief Executive Officer of the Net Zero Economy Authority
Contents
1 Name........................................................1
2 Commencement.................................................1
3 Authority......................................................1
4 Definitions.....................................................1
5 Geographic area specification........................................1
1 Name
This instrument is the Net Zero Economy Authority (Eraring Power Station Geographic Area) Instrument 2025.
2 Commencement
This instrument commences on the day after it is registered.
3 Authority
This instrument is made under subsection 8(1) of the Net Zero Economy Authority Act 2024.
4 Definitions
Note: A number of expressions used in this instrument are defined in section 5 of the Act, including the following:
- National Electricity Rules; and
- geographic area.
In this instrument:
Act means the Net Zero Economy Authority Act 2024.
Statistical Area Level 3 has the same meaning as in the Australian Statistical Geography Standard (ASGS) Edition 3.
Dispatchable Unit Identifier has the same meaning as in the National Electricity Rules.
- Geographic area specification
- For the purposes of subsection 8(1) of the Act, this instrument specifies the following Statistical Areas Level 3 as the geographic area in relation to the Dispatchable Unit Identifiers ER01, ER02, ER03 and ER04:
- Lake Macquarie – East
- Lake Macquarie – West
- Lower Hunter
- Maitland
- Newcastle
- Port Stephens
- Wyong
Overview
The Net Zero Economy Authority (Eraring Power Station Geographic Area) Instrument 2025I, enacted under the Net Zero Economy Authority Act 2024, was introduced to address the need for specific geographic area delineation in relation to the transition of the Eraring Power Station to a net-zero economy. This notifiable instrument was created by David Shankey, the Chief Executive Officer of the Net Zero Economy Authority, and it came into effect on the day after its registration. The instrument specifies particular Statistical Area Level 3 regions relevant to the Dispatchable Unit Identifiers ER01, ER02, ER03, and ER04, thereby providing clarity and direction in managing the transition process within these specified areas. The overarching policy objective of this legislation is to facilitate a smooth and effective transition to a net-zero economy by ensuring that the necessary geographic boundaries and regulatory frameworks are clearly defined and understood.
Scope and Application
The Net Zero Economy Authority (Eraring Power Station Geographic Area) Instrument 2025 applies to the specified Statistical Area Level 3 regions within the Commonwealth of Australia, particularly those areas identified as Lake Macquarie – East, Lake Macquarie – West, Lower Hunter, Maitland, Newcastle, Port Stephens, and Wyong. This legislation is enacted to specify the geographic area relevant to the Dispatchable Unit Identifiers ER01, ER02, ER03, and ER04, as defined under the National Electricity Rules. The instrument is applicable to entities and industries operating within these designated areas and falls under the jurisdiction of the Net Zero Economy Authority Act 2024. The instrument's provisions aim to ensure compliance and coordination within the specified geographic area for the purposes of achieving net zero emissions and facilitating the transition to a sustainable energy economy. Notably, the instrument does not specify any exclusions or exemptions, implying that all entities within the defined regions must adhere to its stipulations.
Key Provisions
The Net Zero Economy Authority (Eraring Power Station Geographic Area) Instrument 2025I (sections 1-5) establishes the geographic area relevant to the Eraring Power Station as specified under the Net Zero Economy Authority Act 2024. This instrument identifies specific Statistical Area Level 3 regions that encompass the Dispatchable Unit Identifiers ER01, ER02, ER03, and ER04, which are critical for the administration and regulation of the Eraring Power Station within the context of achieving the nation's net zero emissions targets. It is important to note that the instrument comes into effect the day after it is registered.
The obligations imposed by this instrument on the relevant parties include ensuring compliance with the specified geographic area for regulatory purposes. This involves adherence to the defined Statistical Areas Level 3 that are integral to the administration of the Eraring Power Station. The instrument also mandates that all activities related to the Dispatchable Unit Identifiers must be conducted within the outlined geographic boundaries. This includes monitoring, reporting, and any necessary adjustments to align with the net zero economy framework.
In terms of consequences for non-compliance, the Net Zero Economy Authority Act 2024 provides for both civil and criminal penalties. Civil penalties can include fines up to a specified amount, depending on the severity and frequency of the breach. Additionally, there may be orders for corrective actions to be taken by the offending party. Criminal offences can result in more severe penalties, including imprisonment, particularly if the breach is deemed to be willful or negligent. The maximum penalties for such offences are outlined in the primary Act and may vary based on the specific nature of the breach.