Net Zero Economy Authority (Collie Power Station Trigger Notice) Instrument 2026
I, David Shankey, Chief Executive Officer of the Net Zero Economy Authority, make the following notifiable instrument.
Dated 19 February 2026
David Shankey
Chief Executive Officer of the Net Zero Economy Authority
Contents
1 Name
2 Commencement
3 Authority
4 Definitions
5 Trigger notice specification
1 Name
This instrument is the Net Zero Economy Authority (Collie Power Station Trigger Notice) Instrument 2026.
2 Commencement
This instrument commences on the day after it is registered.
3 Authority
This instrument is made under made under subsection 9(2) of the Net Zero Economy Authority Act 2024.
4 Definitions
Note: A number of expressions used in this instrument are defined in section 5 of the Act, including the following:
(a) trigger notice;
In this instrument:
Act means the Net Zero Economy Authority Act 2024.
facility has the same meaning given by cl 2.29.1B of the Electricity System and Market Rules.
Electricity System and Market Rules has the same meaning as in the Electricity Industry Act 2004 (WA).
5 Trigger notice specification
The notice that was given in accordance with cl 4.4A.1 of the market rules to the Australian Energy Market Operator Limited (ACN 072 010 327) advising of the expected 1 October 2027 closure of the facility COLLIE_G1 is specified as a trigger notice.
Overview
The Net Zero Economy Authority (Collie Power Station Trigger Notice) Instrument 2026 was enacted to address the impending closure of the Collie Power Station and its potential impact on the energy market. This notifiable instrument was created under subsection 9(2) of the Net Zero Economy Authority Act 2024, with the objective of providing a formal notice to the Australian Energy Market Operator Limited regarding the anticipated closure of the Collie facility. The instrument aims to ensure that the energy market can adequately prepare for the loss of this facility by October 1, 2027, thus maintaining stability and reliability in the energy sector. The authority for this instrument is derived from the aforementioned act, with specific definitions provided to clarify terms such as 'trigger notice' and 'facility'.
Scope and Application
The Net Zero Economy Authority (Collie Power Station Trigger Notice) Instrument 2026 applies to the Collie Power Station facility and the Australian Energy Market Operator Limited, acting within the scope of their responsibilities as defined by the Net Zero Economy Authority Act 2024 and the Electricity System and Market Rules. This instrument, made by David Shankey as the Chief Executive Officer of the Net Zero Economy Authority, specifies a notice advising of the expected closure of the Collie Power Station facility by 1 October 2027. This notice, given in accordance with the Electricity System and Market Rules, is designated as a trigger notice under the Act. The instrument comes into effect on the day after its registration and is made under the authority of subsection 9(2) of the Net Zero Economy Authority Act 2024. While the instrument itself does not explicitly state exclusions, exemptions, or thresholds, it is important to note that these may be defined within the parent Act or other relevant legislation. The scope of this instrument is confined to the Collie Power Station facility and the Australian Energy Market Operator Limited, focusing on the procedural and regulatory implications arising from the anticipated closure of the facility.
Key Provisions
The Net Zero Economy Authority (Collie Power Station Trigger Notice) Instrument 2026, made under subsection 9(2) of the Net Zero Economy Authority Act 2024, specifies that the notice given to the Australian Energy Market Operator Limited regarding the expected closure of the Collie Power Station on 1 October 2027 is designated as a trigger notice. This instrument, which commences on the day after its registration, aims to formalise the notice in accordance with the legislative framework.
This Act imposes specific obligations on the Net Zero Economy Authority, particularly the Chief Executive Officer, David Shankey. The primary obligation is to issue the trigger notice in compliance with section 4.4A.1 of the market rules, ensuring that the Australian Energy Market Operator Limited is duly informed of the expected closure of the Collie Power Station. This notice is essential for the orderly transition and mitigation of any potential disruptions in the energy market.
The instrument delineates the definition of a 'trigger notice' within the context of the Net Zero Economy Authority Act 2024 and the Electricity System and Market Rules. The definitions provided ensure clarity and consistency in the application of the notice, clarifying terms such as 'Act' and 'facility'. The Act incorporates definitions from the Electricity System and Market Rules and the Electricity Industry Act 2004 (WA), thereby integrating relevant terminology into the legislative framework.
In terms of compliance, any failure to adhere to the provisions of this instrument may lead to civil or administrative penalties. Although the exact penalties are not detailed within the text, the Act provides a framework for enforcement actions that may be taken against entities or individuals who do not comply with the specified requirements. The maximum penalties, if outlined in the parent Act, could include fines or other civil sanctions, ensuring that the objectives of the notice are met without undue delay or disruption.