Kingston and Arthur’s Vale Historic Area Heritage Management Plan 2016

Administered by Department of Climate Change, Energy, the Environment and Water

Legislation au F2016L01891 In force Legislative Instrument

Legislation content

EXPLANATORY STATEMENT

 

Issued by the and Department of Infrastructure and Regional Development

 

Environment Protection and Biodiversity Conservation Act 1999

 

Kingston and Arthur’s Vale Historic Area Heritage Management Plan (2016)

 

Subsection 341S (1) of the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) requires a Commonwealth Agency – in this case the Department of Infrastructure and Regional Development (DIRD) to make a written plan to protect and manage the Commonwealth Heritage values of a Commonwealth Heritage place it owns or controls.

The Kingston and Arthur’s Vale Historic Area Heritage Management Plan (2016) (the Plan) provides for the future management of Kingston and Arthur’s Vale Historic Area (KAVHA). It establishes strategic principles for conservation and protection of the outstanding universal value and other heritage values of KAVHA. The plan seeks to improve connections with the local community to demonstrate how heritage can benefit local people, including private landholders, to improve visitor experiences and to address resourcing and management issues.

Background

Norfolk Island is a plateau, 90 to 120 metres above sea level, in the Pacific Ocean approximately 1400 kilometres east of mainland Australia (latitude 29° South and Longitude 168° East). The southern side of the island contains a coastal lowland and bay with a fringing reef. The KAVHA site comprises this lowland, the surrounding steep hills and two major valleys: Arthur’s Vale and Stockyard Valley. The site covers an area of approximately 250 hectares, of which 78 hectares are within public reserves.

Kingston, set on a coastal plain surrounded by hills, contains a substantial set of Georgian buildings as well as extensive ruins and standing structures, archaeological features, and landform and landscape elements. Many of the buildings have been modified and some have been in continual use since the arrival of Pitcairn settlers in 1856. Arthur’s Vale (also known as Watermill Valley) is a largely undeveloped cultural landscape which retains late eighteenth and early nineteenth century characteristics.

European discovery of Norfolk Island was by Captain Cook on 10 October 1774. There is some evidence of Polynesian settlement between c1150 and c1450 AD. First (Colonial)Settlement was from 1788 to 1814. All buildings erected during this period were destroyed to prevent use when the island was abandoned in February 1814. A second (Penal) settlement existed between 1825 and 1855. A third settlement was established in 1856 when Pitcairn Islanders were relocated to Norfolk Island due to the unsustainability of Pitcairn Island. Norfolk Island has been continuously settled since 1856.

Sites and buildings remaining from these settlements include Government House, rebuilt in 1825; the 1830s formal layout of Kingston; the old military barracks, constructed in 1832, comprise a compound wall with corner observation towers enclosing the central barracks; the new military barracks were constructed between 1835 and 1837; and, the Cemetery, that has been in use since c1798.

The KAVHA site was included in the Norfolk Island Heritage Register in 2003, the Commonwealth Heritage List in 2004, Australia’s National Heritage List in 2007 and added to the World Heritage list, as one of eleven places that comprise the Australian Convict Sites, in 2010.

Structure and content of the Plan

The Plan has been prepared in a manner which is consistent with the Commonwealth Heritage management principles in Schedule 7B of the Environment Protection and Biodiversity Conservation Regulations 2000 (EPBC Regulations) and meets the requirements for management plans for Commonwealth Heritage places in Schedule 7A of the EPBC Regulations. The Plan follows a sequence from description to analysis of operational requirements to recommendations for implementation:

  • Introduction
  • Vision and key objectives
  • The place
  • Heritage Values
  • Management context
  • Challenging issues
  • Strategic principles
  • Conservation and management policies
  • Priority programs
  • Recommendations

Consultation

Development of the Plan started in January 2014 as an update of the previous conservation management plans. A Project Team was engaged, comprising experts in community consultation and engagement and heritage management as well as an architect who was a KAVHA expert.

A Project Review Group of six was established consisting of one nominee each from the Commonwealth and former Norfolk Island Governments and one from each of the following four categories: legislation and planning expertise (Commonwealth and Norfolk Island); heritage and/or environment expertise; a KAVHA staff representative – current or former; and, a KAVHA landowner representative. Applications were called for by 13 February 2014 by way of weekly advertisements placed in the Norfolk Islander newspaper over a number of weeks and a Project Update was posted on line. The members were announced on 23 April 2014.

The Project Team conducted an online survey from 23 February to 23 March 2014, to allow anyone else with an interest to share their vision for KAVHA, express concerns and identify opportunities. This attracted 165 responses. They visited the island from 24 February to 3 March 2014 and held drop in sessions, one on one talks and had a stall at the Sunday Market. They visited again in 2014, from 28 April to 2 May, and held some focussed discussion groups and an Open Community Report Back session.

A draft Heritage Management Plan was prepared and was put on exhibition on island from 2 February to 15 March 2015. An eight-page synopsis and the draft plan were available to download and copies available at the KAVHA Office, Norfolk Island Post Office, Public Library and Tourism Visitors Information Centre.

Consultation and workshops were undertaken on Norfolk Island in February 2015:

  • Public presentation – Wednesday 11 February
  • Tourism representatives workshop – Wednesday 11 February
  • KAVHA staff workshop – Thursday 12 February
  • Landholders workshop – Thursday 12 February

An on-line feedback survey was open from 2 February to 15 March 2015. Written submissions were also invited to be made during that period.

Members of the Project Team were re-engaged in late 2015 to make further amendments to the Draft Plan. The changes requested were to reflect recent changes to the legislative and governance arrangements in place for Norfolk Island, and consider additional comments provided on minor issues identified in the previous draft plan. 

On 23 April 2016 the Environment Minister (the Minister) was asked to endorse the Draft Plan in accordance with paragraph 341S (6) (a) of the EPBC Act. On 13 October 2016 the Minister's delegate confirmed, based on advice received from the Australian Heritage Council, that the Plan complied with the requirements of the EPBC Act and the Commonwealth Heritage management principles.

The Plan is a legislative instrument for the purposes of the Legislation Act 2003.

The Plan will commence on the day after it is registered on the Federal Register of Legislative Instruments.

Statement of Compatibility with Human Rights

Prepared in accordance with Part 3 of the Human Rights (Parliamentary Scrutiny) Act 2011.

The Plan is compatible with the human rights and freedoms recognised or declared in the international instruments listed in section 3 of the Human Rights (Parliamentary Scrutiny) Act 2011.

The Plan does not engage any of the applicable rights or freedoms.

The Plan is compatible with human rights as it does not raise any human rights issues.

Overview

The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) was enacted by the Australian Parliament to provide for the protection of the environment, particularly matters of national environmental significance, under a single national system. This legislation fills the gap by establishing a comprehensive framework for environmental protection and biodiversity conservation across Australia, addressing issues such as habitat destruction, pollution, and the decline of native species. The Act requires Commonwealth Agencies, including the Department of Infrastructure and Regional Development (DIRD), to develop management plans for Commonwealth Heritage places to ensure their conservation and protection. The Kingston and Arthur’s Vale Historic Area Heritage Management Plan (2016) is one such plan, developed under subsection 341S (1) of the EPBC Act, to protect and manage the heritage values of the Kingston and Arthur’s Vale Historic Area on Norfolk Island. The policy objective of the Plan is to establish strategic principles for the conservation and protection of the site's outstanding universal value and other heritage values, improve connections with the local community, and address resourcing and management issues.

Scope and Application

The Kingston and Arthur’s Vale Historic Area Heritage Management Plan (2016) applies to the Kingston and Arthur’s Vale Historic Area (KAVHA) on Norfolk Island, which is a Commonwealth Heritage place under the ownership or control of the Department of Infrastructure and Regional Development (DIRD). The Plan was developed in accordance with subsection 341S (1) of the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) to provide for the management of KAVHA, ensuring the protection and conservation of its outstanding universal value and other heritage values. This management plan is intended to enhance connections with the local community, benefiting private landholders and improving visitor experiences while addressing resourcing and management challenges. The Plan is applicable to all activities within the KAVHA site, which covers approximately 250 hectares, including the management of public reserves and private lands. It outlines strategic principles, conservation policies, and priority programs for the area, aiming to integrate heritage management with community engagement and sustainable tourism practices. The jurisdictional reach of the Heritage Management Plan is confined to Norfolk Island, a territory under the Commonwealth's purview, approximately 1400 kilometres east of mainland Australia. The Plan does not extend to other regions or territories and is specific to the management of KAVHA as a Commonwealth Heritage place. While the plan is comprehensive in its approach to heritage management, it does not explicitly state exclusions, exemptions, or thresholds within its provisions. The EPBC Act and its regulations may, however, provide additional context for the application of the Plan through subordinate instruments. The compatibility of the Plan with human rights is affirmed, as it does not engage any of the applicable rights or freedoms outlined in the international instruments listed in the Human Rights (Parliamentary Scrutiny) Act 2011.

Key Provisions

The Kingston and Arthur’s Vale Historic Area Heritage Management Plan (2016) (the Plan) is established under subsection 341S(1) of the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) (section 341S(1)). The purpose of the Plan is to provide for the future management of the Kingston and Arthur’s Vale Historic Area (KAVHA), a site of significant heritage value. The Plan outlines strategic principles for the conservation and protection of KAVHA’s outstanding universal value and other heritage values, aiming to improve connections with the local community, benefit private landholders, enhance visitor experiences, and address management and resourcing issues. The Plan is structured to describe the place, analyse heritage values, consider management context, identify challenging issues, establish strategic principles, propose conservation and management policies, prioritise programs, and make recommendations for implementation. The Plan imposes several obligations on the parties involved in the management of KAVHA. These include conducting thorough community consultation and engagement, as evidenced by the extensive process undertaken during the development of the Plan, which involved a Project Team and a Project Review Group. The community consultation process included online surveys, drop-in sessions, one-on-one talks, stalls at local markets, and workshops with various stakeholders such as tourism representatives, KAVHA staff, and landholders. Additionally, the Plan must comply with the Commonwealth Heritage management principles outlined in Schedule 7B of the Environment Protection and Biodiversity Conservation Regulations 2000 (EPBC Regulations) and meet the requirements for management plans for Commonwealth Heritage places in Schedule 7A of the EPBC Regulations. Under the EPBC Act, breaches of the requirements set out in the Heritage Management Plan can lead to both civil and criminal consequences. While the specific offences and penalties are not detailed within the explanatory statement, the overarching legislative framework of the EPBC Act provides for potential enforcement actions against entities that fail to comply with the provisions of the Plan. Penalties for breaches of the Act can include substantial fines and, in more serious cases, imprisonment. The exact penalties would depend on the nature and severity of the breach, as well as any relevant guidelines or regulations that may be applicable. The Plan itself does not specify particular offences or penalties, but it operates within the broader legal context that allows for enforcement actions to ensure compliance with heritage management requirements.

Legal classification tags

Area of Law
Environmental Law
Instrument
Regulation
Concepts
Definitions & Interpretation
Reporting & Disclosure Obligations
Consultation Requirements
Regulatory Standards

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.