Annex A
NATIONAL AIRSPACE or ROUTE CHANGE PROFORMA
NARC – Stage 1: Registration of proposal
NATIONAL AIRSPACE or ROUTE CHANGE | |||||||
NARC Number | 04-007 | ||||||
Subject | Amendment to R645A lateral boundary | ||||||
Stage 1 Registration of proposal : | |||||||
Registration Date: | 27 September 2004 | ||||||
Proposer Organisation | Department of Defence Army | ||||||
Proposer/Project Manager Contact Name | Paul Jones | ||||||
| WOFF | ||||||
| 07 55416366 | ||||||
Paul.Jones1@defence.gov.au | |||||||
Proposal drafted by (person responsible) | Ken Hickey | ||||||
| Airspace and Military Liaison | ||||||
| 07 38663284 | ||||||
ken.hickey@airservicesaustralia.com | |||||||
Change proposal classification (circle or highlight) | A | B | C | D | |||
Airspace Impact | Increase Controlled airspace (Yes/No) | Yes | Decrease controlled airspace (Yes/No) |
| |||
Concise Description | |||||||
Amend lateral boundary of R645A (Canungra) | |||||||
Reason/justification for change. | |||||||
Defence review of training areas revealed that existing airspace does not enclose firing ranges. | |||||||
Proposal references and amendment action required | DAH effective date | 9 Jun 05 | |||||
DAH section | PRD | ||||||
AIP Amendment | Yes 9 Jun 05 | ||||||
AIP Supplement | No | ||||||
NOTAM | Yes 11 Sep 04 | ||||||
AIS cut-off date | 7 Jan 05 | ||||||
ADMS Work-package number (if available) |
| ||||||
Proposers reference (if available) |
| ||||||
Other amendment action required | ERSA AIP MAP ERC L3, L4, VNC 4, BN VTC
| ||||||
Other Documents affected | N/A | ||||||
ADMS SCR number(s) | Diagram attached. | ||||||
Part 1 Airspace Change
NARC Number | 04-007 |
Subject | Amendment to R645A lateral boundary |
Airspace Amendment proposal details
Delete YBBB/R645A CANUNGRA Delete YBBB/R645B CANUNGRA
Insert YBBB/R634A FIRING LATERAL LIMITS: 28 00 00S 153 10 00E, 28 05 00S 153 10 00E, 28 05 00S 153 15 00E, 27 58 00S 153 15 00E 27 58 00S 153 11 09E, then along CANUNGRA-MT TAMBORINE RD to 28 00 00S 153 10 52E, 28 00 00S 153 10 00E VERTICAL LIMITS: SFC-3800 HOURS OF ACTIVITY: H24 or deactivated by NOTAM ADMINISTERING AUTHORITY: Dept of Defence – Army
YBBB/R634B CANUNGRA Remainder unchanged
| |
NARC – Stage 2: Assessment/Consultation Plan
NARC Number | 04-007 | ||
Subject | Amendment to R645A lateral boundary | ||
Stage 2. Assessment/Consultation Plan: (Required for category A, B, C proposals) (An outline of the assessment and consultation plan the proposer plans to undertake. Note: in some areas this may be assessed as “Not Required” N/R) | |||
Activity | Required (Yes or N/R) |
Explanation and or planned activity
| |
Safety | |||
Safety Impact Statement | Yes |
| |
Aeronautical Safety Assessment | N/R |
| |
Procedure or Avionic requirement | N/R |
| |
ICAO Obligations | |||
Differences from ICAO | N/R |
| |
International agencies | N/R |
| |
Efficient use of Airspace | |||
Airspace use study | N/R |
| |
Operator requirements | |||
Regional airspace users consultation | Yes | Consult with Sth QLD RAPAC | |
National airspace users consultation | N/R |
| |
Industry Cost or Benefit | N/R |
| |
Avionic requirements | N/R |
| |
Procedures requirements | N/R |
| |
Pilot training | N/R |
| |
Workload implications | N/R |
| |
Service provider interests | |||
ATS impact study | Yes | Consult with Airservices Australia | |
ATS training |
|
| |
ATS systems |
|
| |
Workload implications |
|
| |
Environmental assessment | |||
Environmental study | Yes |
| |
Integrated Operations (Mil/Civil) | |||
Integration plan: | N/R |
| |
Public Interest | |||
Impact on public | N/R |
| |
National Security | |||
Security study | N/R |
| |
NARC – Stage 3: Assessment/Consultation Results
NARC Number | 04-007 |
Subject | Amendment to R645A lateral boundary |
Stage 3. Assessment/Consultation Results: (Supply full reports plus an overall summary include support for change)
| |
Consultation 14 Sep04-Sth QLD RAPAC advised by email. 5 Oct 04-The Convenor confirmed that there has been no opposition to the proposal. ATS provider - Airservices Australia | Required Yes
Yes |
| Satisfactory Yes
Yes |
|
| ||||
Signature (or electronic mark) |
| |||
Name of authority | Ken Hickey | |||
Position (& Rank) | Airspace and Military Liaison | |||
Organisation | Airservices Australia | |||
Date | 8 Oct 04 | |||
NARC – Stage 4: Service Provider Endorsement
NARC Number | 04-007 | ||||||
Subject | Amendment to R645A lateral boundary | ||||||
Stage 4. Service Provider Endorsement
| |||||||
ATS service provider endorsement | Approved | Yes | Not Approved |
| |||
ATS impact study: ATS is not affected in Class G airspace. ATS training: No ATS training required. ATS systems: Amendment to radar map data. Workload implications: Nil. Aviation safety is not effected as the proposal ensures segregation between Army activities and flying operations. SCARD attached. Airservices Australia environmental assessment: ARMS entry 126074 Class D risk | |||||||
Organisation | Airservices Australia | RAAF | ARMY | NAVY | |||
Required Yes/No (As per stage 2 identification) |
|
|
|
| |||
Signature or Electronic Mark |
|
|
|
| |||
Name | Jason Harfield |
|
|
| |||
Position (& Rank) | HATC |
|
|
| |||
Date |
|
|
|
| |||
|
|
|
|
| |||
NARC – Stage 5: Delegates Endorsement
NARC Number |
| ||||
Subject | Amendment to R645A lateral boundary | ||||
Stage 5. Delegates Endorsement
| |||||
Delegation endorsement | Approved |
| Not Approved |
| |
Reason if not approved
| |||||
Change (airspace or air route) |
Airspace
| ||||
Signature or Electronic Mark |
| ||||
Name |
| ||||
Position (& Rank) |
| ||||
Date |
| ||||
NARC – Stage 6: Instrument developed and signed
NARC Number |
| |
Subject | Amendment to R645A lateral boundary | |
Stage 6. Instrument developed and signed
| ||
Instrument developed - Date |
| |
Developed by |
| |
Name |
| |
Position (& Rank) |
| |
| ||
Approved by |
| |
Date |
| |
Name |
| |
Position |
| |
Date |
| |
NARC – Stage 7: Publication
NARC Number |
| |||
Subject | Amendment to R645A lateral boundary | |||
Stage 7. Publication
| ||||
Copy of NARC and Instrument sent to | ||||
| Date | Forwarded by | ||
ADF DTAM |
|
| ||
AA AIS |
|
| ||
Work Package Actioned/Completed | ||||
|
| |||
|
| |||
|
| |||
|
| |||
| ||||
ADMS data entry |
| |||
|
| |||
|
| |||
|
| |||
Notification to ACC |
| |||
|
| |||
Notification to proposer |
| |||
|
| |||
NARC - Attachment A: Justification for Increase In CTA Or R Areas
A review of Army training areas revealed that existing airspace does not encompass the safety templates for current military operations.
Signature or Electronic Mark |
|
Name of Justification Officer |
|
Position (& rank) |
|
Organisation |
|
Date |
|
NARC - Attachment B - Pictorial Description of Any Airspace Change
Signature or Electronic Mark |
|
Name of Officer Providing Diagram(s) | Ken Hickey |
Rank & Position | Airspace and Military Liaison |
Organisation | Airservices Australia |
Date | 8 Oct 04 |