Heavy Vehicle Stated Maps – Network Suspension and Amendment Notice 2026 (No.1)

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au C2026G00020 In force Gazette

Legislation content

HEAVY VEHICLE NATIONAL LAW

Heavy Vehicle Stated Maps – Network Suspension and Amendment Notice 2026 (No.1)

 

  1.        Purpose

 

The purpose of this notice is to amend stated networks for vehicles on the Regulator’s initiative.   

 

  1.        Commencement date

 

  1.       Suspension or amendment of the routes in Schedule 1 under section 4(1)(a) below commences immediately upon publication of this notice; and

 

  1.       Cancellation or amendment of the routes in Schedule 1 under section 4(1)(b) below commences 28 days after publication of this notice.

 

  1.        Title

 

This notice may be cited as the Heavy Vehicle Stated Maps – Network Suspension and Amendment Notice 2026 (No.1).

 

  1.        Authorising provision

 

  1.       This notice is made under:

 

  1.       Section 175, immediately suspending or amending the routes listed in Schedule 1 of this notice to prevent or minimise serious harm to public safety or significant damage to road infrastructure; and
  2.       Section 173, cancelling or amending the routes listed in Schedule 1 of this notice on the Regulator’s initiative.

 

  1.        Application

 

This notice applies in all participating jurisdictions. 

 

  1.        Amendments

 

The specified networks in Column 2 of Schedule 1 to this notice are amended as specified in Column 4 for the Road Manager’s reasons shown in Column 5.

 

  1.        Public notice of amendment

 

Any person affected by the purpose of the action they make a written representation to the Regulator within 14 days of the publication of the notice about why the amendment should not be made.

 

Dated: 13/1/2026

Jose Arredondo

Manager Network Access Policy

National Heavy Vehicle Regulator

 

 

 

 

 

Schedule 1 Table of Amended Routes

Column 1

Authorising Provision

Column 2

Network

Column 3

Locality

Column 4

Changes to Route

Column 5

Road manager Reasons for Change

s174 and s175 HVNL

New South Wales: All Networks

Orange City Council

Council has decided to remove access at the Ash Street crossing.

Due to recent upgrades at the Huntly Road and Ash Street intersection, which is now inadequate for PBS Level 1- 19m and above vehicles because of insufficient turning space (LSSP – Low Speed Swept Path) and stacking distance.

s174 and s175 HVNL

New South Wales Multiple Networks:

PBS Level 1

NSW Oversize Overmass Load Carrying Vehicles Network Approved Roads

SPV Level 1 Approved Routes

SPV Level 3 Approved Routes

SPV Level 4 Approved Routes

SPV Level 4 and 12t axle Approved Routes

SPV Level 6 Approved Routes

SPV Level 2 Approved Routes

GHMS network

ZEHV Rigid trucks (M1 and M2)

ZEHV Short Combination (M1 and M2)

Transport for New South Wales

Remove Hume Hwy On/Off ramp Sutton Forest.

Removing access along the on/off ramps at Sutton Forest Service Station as it is inconsistent across all maps (confetti like). Transport does not have an agreement with the operator of the Sutton Forest Service Station.

s174 and s175 HVNL

New South Wales All Networks:

 

Tamworth Regional Council

Restrict access to Starrs Culvert structure, Wallamore Rd Westdale.

Structural assessment notes the condition and structural capacity of Starrs Culvert is very poor and needs to be load limited to all classes of heavy vehicles. Same information as per Boltons Creek Culvert and Savages Culvert, directly north along Wallamore Road.

s174 and s175 HVNL

Victoria – Multiple Networks: Victoria's Emergency Preparation Combination Network (78.5t, 4m wide, 5m high & 26m long) & Victoria's Emergency Response Combination Network (78.5t, 4m wide, 5m high & 26m long)

Department of Energy, Environment and Climate Action

Remove access to the following roads:
Big River Road, Eildon

Bindaree Road, Mount Buller

Brocks Road, Mount Buller

Bullfight Road 4WD (Seasonal), Rubicon

Conn Gap Road, Eildon

Lima East Road, Creek Junction

Lima East Road, Lima East

Torbreck Road, Eildon

Upper Howqua Road, Mount Buller
Anarchy Road, Cabbage Tree Creek

Bicentennial Road, Noorinbee

Bicentennial Road, Wingan River

Broomes Track, Tamboon

Centre Track, Cabbage Tree Creek

Centre Track, Mallacoota

Centre Track, Wingan River

Combienbar Trail, Noorinbee

Cooaggalah Road, Noorinbee North

Dinah Divide Track, Club Terrace

Drummer Track, Genoa

Falls Creek Road No.1, Cabbage Tree Creek

Mueller Link Track, Wingan River

Myrgatroyd Track, Bemm River

Old Kent Road, Nurran

Rich River Road, Nurran

Sand Patch Track, Wingan River

Sarah Allen Road, Maramingo Creek

Soda Creek Track, Tamboon

Soda Creek Track, Wingan River

Thurra Junction Road, Noorinbee North

Towzer Creek Track, Cabbage Tree Creek

Wangarabell Road, Wroxham

Winter Road, Cabbage Tree Creek

Anarchy Road, Cabbage Tree Creek

Bee Tree North Track, Club Terrace

Bicentennial Road, Noorinbee

Bicentennial Road, Wingan River

Blackburn Road, Club Terrace

Brigg Track, Buln Buln East

Brigg Track, Neerim East

Centre Track, Cabbage Tree Creek

Cooper Road, Bullarto South

Four Lane Highway Track, Cabbage Tree Creek

Glen Arte Road, Cabbage Tree Creek

Hippo Track, Bemm River

Horseshoe Road, Noorinbee

Iron Chimney Track, Orbost

Kermond Road, Goongerah

Koola Creek Road, Genoa

Little Tower Road, Willung South

Morrison Track, Nurran

Paradise Ridge Road, Nurran

Paradise Ridge Road, Yalmy

Quartz Ridge Road, Genoa

Ruoaks Road, Ancona

Ruoaks Road, Strathbogie

Shady Track, Neerim East

South Main Road, Ballan

Toms Cap Road, Willung South

Wild Dog Road, Blackwood

Wild Dog Road, Bullarto South

Wild Dog Road, Lyonville

Winter Road, Cabbage Tree Creek

The reason for imposing the new network conditions is that we believe there is a significant risk to road users. We’ve been conducting a Route Assessment Project for two years now. The Assessment measures road geometry, as well as superelevation. Any roads that failed the assessment were recorded, and in late November we could see a clear trend: defects on our road was running to 95%.

 

Given the systemic nature of the defects, we have arrived at the new access conditions, thereby restricting the super-heavy vehicles from the Emergency Preparedness/Emergency Response 78.5t Network.

 

s174 and s175 HVNL

Victoria – Multiple Networks: Victoria's Emergency Preparation Combination Network (78.5t, 4m wide, 5m high & 26m long) & Victoria's Emergency Response Combination Network (78.5t, 4m wide, 5m high & 26m long)

Department of Energy, Environment and Climate Action

Updating access conditions on Abbeyard Rd, Abbeyard to:

 

Accessible to vehicles up to 49.5 tonne - triaxle low loader 19 m long OR vehicles up to 59.5 tonne - quad axle low loader up to 21.2 m long - only if steerable trailer axles are fitted and enabled.

The reason for imposing the new network conditions is that we believe there is a significant risk to road users. We’ve been conducting a Route Assessment Project for two years now. The Assessment measures road geometry, as well as superelevation. Any roads that failed the assessment were recorded, and in late November we could see a clear trend: defects on our road was running to 95%.

 

Given the systemic nature of the defects, we have arrived at the new access conditions, thereby restricting the super-heavy vehicles from the Emergency Preparedness/Emergency Response 78.5t Network.

 

s174 and s175 HVNL

Victoria – Multiple Networks Oversize/Overmass (OSOM) Network

PBS Level 2B Cubic Network

PBS Level 2B 77.5t General Freight Reference Vehicle 1

PBS Level 3A 73.0t General Freight Reference Vehicle 1

PBS Level 3A 77.5t General Freight (All Reference Vehicles)

PBS Level 3A 113.5t General Freight (All Reference Vehicles)

PBS Level 3A 113.5t Volumetric (All Reference Vehicles)

PBS Level 3A 85.5t General Freight (All Reference Vehicles)

PBS Level 3A 85.5t Volumetric (All Reference Vehicles)

PBS Level 2B 85.5t General Freight (All Reference Vehicles)

PBS Level 2B 85.5t Volumetric (All Reference Vehicles)

PBS Level 3A 91.0t General Freight (All Reference Vehicles)

PBS Level 3A 91.0t Volumetric (All Reference Vehicles)

Department of Transport and Planning

Adding condition to Level Crossing Mallee Hwy, Ouyen.

Any vehicle that exceeds 26m in length require an ODL Permit. Level crossing must to be amber with conditions.

 

Overview

The Heavy Vehicle National Law, enacted in 2012, addresses the need for a uniform regulatory framework governing heavy vehicle operations across Australia. This law aims to facilitate national consistency in heavy vehicle regulations, thereby enhancing safety and efficiency in interstate transport. The Heavy Vehicle National Law was established by the Parliament of Australia, with the overarching policy objective being to ensure the safety and efficiency of heavy vehicles on Australian roads. The Heavy Vehicle Stated Maps – Network Suspension and Amendment Notice 2026 (No.1) is an administrative measure introduced by the National Heavy Vehicle Regulator, under the authorisation of Section 175 of the Heavy Vehicle National Law. The notice seeks to immediately suspend or amend specific heavy vehicle routes in response to concerns about public safety and road infrastructure integrity, while also allowing for the cancellation or amendment of routes on the Regulator’s initiative, effective 28 days after publication. This action is aimed at preventing or minimising serious harm and significant damage to roads, reflecting the law's commitment to maintaining high safety standards for heavy vehicle operations.

Scope and Application

The Heavy Vehicle Stated Maps – Network Suspension and Amendment Notice 2026 (No.1) applies to all participating jurisdictions and regulates the routes that heavy vehicles are permitted to access. The notice comes into effect immediately for route suspensions or amendments and 28 days after publication for cancellations or other amendments. This notice is made under sections 173 and 175 of the Heavy Vehicle National Law (HVNL) to suspend, amend, or cancel routes for reasons such as preventing serious harm to public safety or significant damage to road infrastructure. The notice specifies changes to routes in New South Wales and Victoria based on assessments by local authorities and the Department of Energy, Environment and Climate Action. Public notice is given for any person to make a written representation to the Regulator within 14 days of the publication of the notice about why the amendment should not be made. The notice extends its application through subordinate instruments, which specify the details of the amended routes in Schedule 1.

Key Provisions

The Heavy Vehicle Stated Maps – Network Suspension and Amendment Notice 2026 (No.1) outlines the changes to the stated networks for heavy vehicles across various jurisdictions, primarily focusing on New South Wales and Victoria. Section 175 allows for the immediate suspension or amendment of routes to prevent or minimise serious harm to public safety or significant damage to road infrastructure (s175). Section 173 provides the authority to cancel or amend routes on the Regulator’s initiative (s173). The notice applies in all participating jurisdictions and is made under the Heavy Vehicle National Law (HVNL). The notice mandates that the specified networks in Column 2 of Schedule 1 are amended as detailed in Column 4 for the reasons outlined in Column 5 by the respective Road Managers. For example, in New South Wales, Orange City Council has decided to remove access at the Ash Street crossing due to inadequate turning space and stacking distance for vehicles PBS Level 1- 19m and above. Similarly, Transport for New South Wales has removed the Hume Highway On/Off ramp at Sutton Forest due to inconsistencies across all maps and lack of agreement with the service station operator. In Victoria, the Department of Energy, Environment and Climate Action has removed access to several roads due to systemic defects identified during a two-year Route Assessment Project. The notice also requires any person affected by the amendment to make a written representation to the Regulator within 14 days of the publication of the notice, if they believe the amendment should not be made. The commencement of the suspension or amendment of routes is immediate upon publication, while the cancellation or amendment of routes commences 28 days after publication. The Heavy Vehicle National Law imposes various offences, penalties, and civil or criminal consequences for breaches of the regulations. For instance, any unauthorised use of a stated network can result in fines or legal action. The specific penalties are not detailed in this notice but can be found in the relevant sections of the HVNL. The primary aim of these provisions is to ensure compliance with the network amendments to maintain public safety and protect road infrastructure.

Legal classification tags

Area of Law
Administrative Law
Environmental Law
Instrument
Gazette Notice
Concepts
Regulatory Standards
Enforcement Powers
Reporting & Disclosure Obligations

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.