Heavy Vehicle Stated Maps – Network Suspension and Amendment Notice 2025 (No.4)

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au C2025G00208 In force Gazette

Legislation content

HEAVY VEHICLE NATIONAL LAW

Heavy Vehicle Stated Maps – Network Suspension and Amendment Notice 2025 (No.4)

 

  1.        Purpose

 

The purpose of this notice is to amend stated networks for vehicles on the Regulator’s initiative.   

 

  1.        Commencement date

 

  1.       Suspension or amendment of the routes in Schedule 1 under section 4(1)(a) below commences immediately upon publication of this notice; and

 

  1.       Cancellation or amendment of the routes in Schedule 1 under section 4(1)(b) below commences 28 days after publication of this notice.

 

  1.        Title

 

This notice may be cited as the Heavy Vehicle Stated Maps – Network Suspension and Amendment Notice 2025 (No.4).

 

  1.        Authorising provision

 

  1.       This notice is made under:

 

  1.       Section 175, immediately suspending or amending the routes listed in Schedule 1 of this notice to prevent or minimise serious harm to public safety or significant damage to road infrastructure; and
  2.       Section 173, cancelling or amending the routes listed in Schedule 1 of this notice on the Regulator’s initiative.

 

  1.        Application

 

This notice applies in all participating jurisdictions. 

 

  1.        Amendments

 

The specified networks in Column 2 of Schedule 1 to this notice are amended as specified in Column 4 for the Road Manager’s reasons shown in Column 5.

 

  1.        Public notice of amendment

 

Any person affected by the purpose of the action they make written representation to the Regulator within 14 days of the publication of the notice about why the amendment should not be made.

 

 

Dated: 11/4/2025

Jose Arredondo

Manager Network Access Policy

National Heavy Vehicle Regulator

 

 

 

 

 

Schedule 1 Table of Amended Routes

Column 1

Authorising Provision

Column 2

Network

Column 3

Locality

Column 4

Changes to Route

Column 5

Road manager Reasons for Change

s174 and s175 HVNL

NSW Oversize Overmass Load Carrying Vehicles Network Approved Roads

Balranald Shire Council

Altering heavy vehicle route in Balranald from O’Connor Street West and Piper West to instead use a larger stretch of Moa Street.

Due to request from residents due to safety concerns.

 

 

s174 and s175 HVNL

NSW Oversize Overmass Load Carrying Vehicles Network Approved Roads

Transport for New South Wales (TfNSW)

Condition added to portions of Hunter Expressway, Newcastle Link Road, Newcastle Inner City Bypass, Newcastle Road and Thomas Street requiring operators to notify Rankin Park to Jesmond Project five days prior to travel.

Safety concerns due to the Rankin Park to Jesmond construction project. 

s174 and s175 HVNL

Multiple Networks:

NSW Type 1 A Double Network, PBS Level 1, 2A, 2B & 3A

Warrumbungle Shire Council

Remove Edwards St and Namoi St from Class 2 and PBS Networks

Edward Street and Namoi Street are primarily residential roads, surrounded by dense housing, schools, and a church. These roads should only be used as alternate routes for OSOM (Over-Sized Over-Mass) vehicles since there is no reasonable alternative. The use of these streets by other heavy vehicles is prohibited to ensure the safety of residents and to protect the road infrastructure.

All other heavy vehicles should utilise the industrial area roads, specifically Saleyards Road and Gardener Street, to access Newell Highway from Baradine Road

 

s174 and s175 HVNL

Multiple Networks:

All relevant Class 1, 2 and 3 NSW Networks

Transport for New South Wales (TfNSW)

No access for the heavy vehicle due to roadworks on Hume Freeway/Craigieburn Bypass between Metropolitan Ring Road and Kalkallo between:

22/04/2025 and 23/04/2025.
28/04/2025 and 1/05/2025.
4/05/2025 and 8/05/2025.
11/05/2025 and 15/05/2025.

 

Safety concerns during works.

s174 and s175 HVNL

Multiple Networks:

All Relevant Class 1, 2 and 3 NSW Networks

Transport for New South Wales (TfNSW)

Remove access from the Newell Highway south of Saleyards Road to the intersection with the bypass.

And North of Bogan Rd Intersection to the intersection with the Bypass

 

The bypass will open to traffic on the 15th of April, and as part of the opening, the Newell Highway intersection will be physically closed as it will be a new works site. No traffic will be accessing the Newell Highway from this intersection, from the 10th of April.

 

Traffic management plans have been agreed with Council, with VMS and barriers in place at points across Parkes.

 

If the access was to remain on the map, it would create confusion and a potential safety risk for drivers, expecting to be able to access the area when they will not physically be able to.

 

 

 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.