Grant of Petroleum Pipeline Licence WA-27-PL

Administered by Department of Industry, Science and Resources

Legislation au C2016G01335 In force Gazette

Legislation content

 

 

COMMONWEALTH OF AUSTRALIA
 

Section 708

OFFSHORE PETROLEUM AND GREENHOUSE GAS STORAGE ACT 2006

GRANT OF PIPELINE LICENCE WA-27-PL

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority, hereby give notice pursuant to section 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that Pipeline Licence WA-27-PL for petroleum has been granted to Woodside Energy Ltd.
(ABN 63 005 482 986), BHP Billiton Petroleum (North West Shelf) Pty. Ltd., (ABN 41 004 514 489), BP Developments Australia Pty. Ltd. (ABN 54 081 102 856), Chevron Australia Pty Ltd (ABN 29 086 197 757), Japan Australia LNG (MIMI) Pty Ltd (ABN 18 006 303 180), Shell Australia Pty Ltd (ABN 14 009 663 576), in relation to the Greater Western Flank Phase-2 system of pipes, from and including 6 October 2016.

 

Graeme Albert Waters

Titles Administrator

 

 

DESCRIPTION OF GREATER WESTERN FLANK PHASE-2 PIPELINE

 

The pipeline route is described in the table hereunder and displayed in the map at Attachment 1, commencing at the Lady Nora/Pemberton (LPA) PLET to the Goodwyn Alpha (GWA) PLET, including the tie-in flowlines and spools connecting to the GWA Subsurface Isolation Valves. Coordinates are based on Geodetic Datum of Australia (GDA94).

 

Main Pipeline

 

Feature Name

KP*

Easting (mE)

Northing (mN)

Bend Radius (m)

1

LPA PLET

0.0

359 484.54

7 806 936.47

 

2

TP1A

1.2

360 530.34

7 807 524.95

 

3

IP1

1.299

360 616.66

7 807 573.53

1200

4

TP1B

1.398

360 693.86

7 807 635.60

 

5

TP2A

2.530

361 576.26

7 808 345.19

 

6

IP2

2.609

361 637.56

7 808 394.48

1200

7

TP2B

2.687

361 704.76

7 808 435.35

 

8

TP3A

3.720

362 587.08

7 808 971.91

 

9

IP3

3.796

362 652.03

7 809 011.41

1200

10

TP3B

3.872

362 721.46

7 809 042.39

 

11

TP4A

4.672

363 451.98

7 809 368.48

 

12

IP4

4.766

363 538.22

7 809 406.97

1200

13

TP4B

4.860

363 617.38

7 809 458.49

 

14

IP ZRB 1

6.138

364 688.75

7 810 155.69

 

15

IP ZRB 2

7.418

365 873.07

7 810 641.53

 

16

SRA Tie-in Hub Face (ILTA)

7.918

366 295.68

7 810 908.74

 

17

IP ZRB 3

8.818

367 056.38

7 811 389.72

 

18

IP ZRB 4

9.918

368 074.08

7 811 807.21

 

19

IP ZRB 5

10.968

368 951.62

7 812 383.77

 

20

IP ZRB 6

12.018

369 919.53

7 812 790.75

 

21

IP ZRB 7

13.420

371 084.28

7 813 570.65

 

22

IP ZRB 8

14.907

372 148.59

7 814 609.47

 

23

KDA Tie-in Hub Face (ILTA)

15.557

372 697.98

7 814 956.84

 

24

IP ZRB 9

16.207

373 247.37

7 815 304.22

 

25

IP ZRB 10

17.207

373 976.29

7 815 988.82

 

26

IP ZRB 11

18.307

374 635.14

7 816 869.68

 

27

IP ZRB 12

19.419

375 136.36

7 817 862.13

 

28

IP ZRB 13

20.653

375 492.71

7 819 043.31

 

29

DOA In-Line Tee Centre (ILTA)

21.153

375 733.50

7 819 481.52

 

30

IP ZRB 14

21.653

375 974.28

7 819 919.72

 

31

IP ZRB 15

22.653

376 614.23

7 820 688.14

 

32

IP ZRB 16

23.853

377 544.00

7 821 446.77

 

33

IP ZRB 17

25.842

379 287.08

7 822 405.52

 

34

IP ZRB 18

27.838

381 177.17

7 823 045.72

 

35

IP ZRB 19

29.838

382 922.81

7 824 021.81

 

36

IP ZRB 20

31.838

384 466.90

7 825 292.95

 

37

IP ZRB 21

33.838

386 208.26

7 826 276.64

 

38

GWA PLET

35.338

387 625.69

7 826 767.47

 

Table 1. Route of the main pipeline (*KP=Kilometre Point). 

 

Tie-in Flowlines and Spools

Feature Name

Easting (mE)

Northing (mN)

LPA Manifold*

359 467.98

7 806 837.94

SRA Manifold

366 349.04

7 810 815.00

KDA Manifold

372 751.34

7 814 863.10

DOA Tie-In Skid

375 825.52

7 819 425.25

GWF-2 Z-Spool (GWA PLET 16” Inboard Hub Face)

387 625.69

7 826 767.47

GWF-2 Z-Spool (MCS 16” Inboard Hub Face)

387 663.64

7 826 737.88

GWF-2 U-Spool (MCS 16” Inboard Hub Face)

387 664.95

7 826 734.10

GWF-2 U-Spool (GWF-1/GWF-2 SSIV 16” Inboard Hub Face)

387 675.21

7 826 701.18

Table 2. Coordinates of the 10” tie-in flowline points and spools (*Italics = not GWF-2 system of pipes)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.