DEPARTMENT OF CLIMATE CHANGE, ENERGY, THE ENVIRONMENT AND WATER
Environment Protection and Biodiversity Conservation Act 1999
EPBC Act Part 7-9 decisions published, 8/09/2025 to 14/09/2025
For further information see the referrals list at https://epbcpublicportal.environment.gov.au/all-referrals/
and type the reference number in the Filter by Referral Number box
actions determined as requiring approval (EPBC Act s.75)
Reference | Title | Controlling Provisions | Date |
2025/10249 | CP Land Pty Ltd / Residential Development / Portion of Lot 9014 Mandurah Road, City of Mandurah Western Australia / Western Australia / Ocean Hill Residential Development | - Listed threatened species and communities (sections 18 & 18A)
| 9/09/2025 |
2025/10240 | Northern Territory Iron Ore Pty Ltd / Mining / Roper Highway Roper Valley NT 0852 Australia / Northern Territory / Roper Valley Iron Ore Project | - Listed threatened species and communities (sections 18 & 18A)
- Listed migratory species (sections 20 & 20A)
| 10/09/2025 |
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2025/10246 | Queensland Electricity Transmission Corporation Limited / Energy Generation and Supply (non-renewable) / Lot 591 on SP302249 and adjoining Knuckledown Road Reserve - Mount Fox QLD 4850 / Queensland / Gawara Baya Wind Farm Connection Project | 8/09/2025 |
2025/10248 | ACEN Australia Pty Ltd / Energy Generation and Supply (renewable) / Lot 2 on RP616712 within the Central Highlands Regional Council Local Government Area. / Queensland / Lilyvale Battery Energy Storage System | 8/09/2025 |
2025/10245 | Storenergy 3 Pty Ltd / Energy Generation and Supply (renewable) / 1 Deight Street and 19 Back Saleyards Road, Molong NSW 2866 / New South Wales / Molong Battery Energy Storage System | 8/09/2025 |
2025/10209 | Forbes Solar Farm Pty Ltd / Energy Generation and Supply (renewable) / 207 Hoopers Road, Forbes, NSW, 2870 / New South Wales / Forbes Solar Farm | 9/09/2025 |
2025/10242 | Greenland Development Pty Ltd / Residential Development / Marana Street, Bilambil Heights NSW 2486 / New South Wales / “Elysian” Residential Development Project | 10/09/2025 |
Assessment Approach (EPBC Act s.87)
Reference | Title | Assessment Approach | Date |
2025/10249 | CP Land Pty Ltd / Residential Development / Portion of Lot 9014 Mandurah Road, City of Mandurah Western Australia / Western Australia / Ocean Hill Residential Development | Preliminary Documentation | 9/09/2025 |
2025/10240 | Northern Territory Iron Ore Pty Ltd / Mining / Roper Highway Roper Valley NT 0852 Australia / Northern Territory / Roper Valley Iron Ore Project | Preliminary Documentation | 10/09/2025 |
DECISION ON APPROVAL (EPBC Act s.133)
Reference | Title | Approval Decision | Date |
2023/09576 | Sorby Management Pty Ltd / Mining / Moonamang Rd, 50km NE of Kununurra / Western Australia / Sorby Hills Silver-Lead-Zinc Project | Approved with conditions | 29/08/2025 |
2018/8376 | Pacific International Development Corporation Pty Ltd / Residential Development / Lot 24 on SP142997 & Lot 1 on RP49296 / Queensland / Bushman Drive Residential Development, Jimboomba, Qld | Approved with conditions | 4/09/2025 |
2023/09450 | Gold Estates Holdings Pty Ltd / Residential Development / Lot 16 Barfield Road, Hammond Park, Western Australia, 6164 / Western Australia / Lot 16 Barfield Road: Residential Development | Approved with conditions | 5/09/2025 |
2025/10185 | A.L Davies & M.M Davies & M.W Davies / Agriculture and Forestry / 5925 Pooncarie Road Pooncarie 2648 / New South Wales / Burtundy Station Dryland Cropping Expansion | Approved with conditions | 8/09/2025 |
2021/8923 | Robe River Mining Co. Pty. Ltd / Mining / Great Northern Highway, Newman / Western Australia / Iron ore mine expansion, West Angelas Revised Project | Approved with conditions | 10/09/2025 |
2018/8335 | Woodside Energy Ltd. / Mining / De Wit Location: Lot 199, 197, 379, 380, 655, 195, 151, 204 / Western Australia / North West Shelf Project Extension, Carnarvon Basin, WA | Approved with conditions | 12/09/2025 |
variation of conditions of approval (EPBC Act s.143)
Reference | Title | Date |
2017/8112 | NW Interconnected Power Pty Ltd / Energy Generation and Supply (renewable) / UCL, Section 91 License LIC 00811/2015_A5683256 / Western Australia / Asian Renewable Energy Hub, 220 km east of Port Hedland, Western Australia | 4/09/2025 |
NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))
Reference | Title | Extended to | Date |
2023/09694 | Rossiter Road Investments Pty Ltd / Commercial Development / 145 Rossiter Road, Koo Wee Rup, Victoria 3981 / Victoria / Rossiter Park | 21/10/2025 | 3/09/2025 |
2023/09639 | Waddi Wind Farm Pty Ltd / Energy Generation and Supply (renewable) / 914 Mullering Rd, Cataby / Western Australia / Waddi Wind Farm | 29/10/2025 | 8/09/2025 |
2021/9089 | Simcoa Operations Pty Ltd / Mining / Kiaka Road and Midlands Road, Moora / Western Australia / North Kiaka Project Quartzite Mine Expansion | 5/12/2025 | 10/09/2025 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of Climate Change, Energy, the Environment and Water or may not meet timeframes for notification. The Department of Climate Change, Energy, the Environment and Water has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of Climate Change, Energy, the Environment and Water regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.
Overview
The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) was enacted to provide for the protection of the environment, particularly with respect to matters of national environmental significance. The EPBC Act was introduced to address the need for a comprehensive legal framework that ensures the protection of Australia’s biodiversity, natural and cultural heritage, and the mitigation of environmental impacts from development projects. This Act is administered by the Australian Parliament and aims to strike a balance between environmental protection and economic development. The Act outlines procedures for the assessment and approval of activities that may significantly impact the environment, ensuring that decision-making processes consider both ecological and socio-economic factors.
The Department of Climate Change, Energy, the Environment and Water is responsible for enforcing the EPBC Act, ensuring compliance with its provisions, and facilitating the assessment and approval of development projects that may affect the environment. The Act's policy objectives include the protection of threatened species and ecological communities, minimising the impact of activities on migratory species, and managing the cumulative impacts of activities to safeguard the environment. Through the EPBC Act, the Australian government aims to promote sustainable development practices that protect the nation's environmental assets for future generations.
Scope and Application
The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) applies to actions that may significantly impact matters of national environmental significance, including listed threatened species and communities, listed migratory species, world heritage properties, wetlands of international importance, and the nuclear actions prohibition and radioactive waste management. The Act applies to all persons and entities, including both private and public sector entities, within Australia and its external territories. The geographic reach of the Act is national, with jurisdiction exercised by the Commonwealth Government. The Act includes specific exclusions, such as activities related to defence, or certain activities related to water resources that are managed under state jurisdiction, among others. Subordinate instruments, such as regulations and codes of practice, extend and clarify the application of the Act, providing further detail on matters such as the approval process for actions, environmental impact assessments, and the management of threatened species and communities. These instruments ensure that the Act's objectives are effectively implemented and enforced across various industries and activities.
Key Provisions
The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) encompasses various sections that govern environmental assessments and approvals for specified actions. Sections 75 and 133 of the EPBC Act pertain to the determination of actions that require approval and the approval decisions themselves, respectively. For instance, Section 75 mandates that certain actions, such as mining and residential developments, require approval if they may significantly impact matters of national environmental significance, such as listed threatened species and communities (sections 18 & 18A) or listed migratory species (sections 20 & 20A). Section 133 outlines the process for approving such actions, often subject to specific conditions designed to mitigate environmental harm. Conversely, Section 75 also stipulates actions not requiring approval, as evidenced by projects like the Gawara Baya Wind Farm Connection Project and the Lilyvale Battery Energy Storage System.
The EPBC Act imposes several obligations on parties or entities seeking approval for actions that may impact the environment. These obligations include providing preliminary documentation (sections 87 and 133), which involves submitting detailed proposals and assessments to demonstrate compliance with environmental standards. For example, CP Land Pty Ltd and Northern Territory Iron Ore Pty Ltd have submitted preliminary documentation for their residential development and mining projects, respectively. Furthermore, entities must adhere to any conditions imposed as part of the approval process. These conditions may include environmental management plans, mitigation measures, and monitoring requirements designed to minimise the impact of the proposed action on the environment.
Failure to comply with the EPBC Act or its associated conditions can result in significant consequences. Section 133 outlines that non-compliance can lead to civil penalties, including fines up to the maximum statutory limits. For instance, under Section 133, any entity found in breach of the conditions of their approval may face financial penalties. Additionally, repeated or egregious violations may lead to more severe sanctions, such as criminal charges, which can result in substantial fines and imprisonment. The Act ensures that any breaches are addressed promptly to uphold environmental protection standards and maintain public trust in the regulatory process.
The EPBC Act also includes provisions for the variation of conditions of approval (section 143) and extensions of time for assessment and approval (section 130(4)). For example, NW Interconnected Power Pty Ltd has had its conditions of approval varied, allowing for adjustments to their project to better align with environmental protection goals. Similarly, entities like Rossiter Road Investments Pty Ltd and Waddi Wind Farm Pty Ltd have had their timelines for assessment extended to ensure comprehensive evaluations and to accommodate additional consultation or information gathering. These provisions reflect the Act's flexibility in managing environmental approvals while ensuring thorough and informed decision-making processes.