DEPARTMENT OF CLIMATE CHANGE, ENERGY, THE ENVIRONMENT AND WATER
Environment Protection and Biodiversity Conservation Act 1999
EPBC Act Part 7-9 decisions published, 28/07/2025 to 3/08/2025
For further information see the referrals list at https://epbcpublicportal.environment.gov.au/all-referrals/
and type the reference number in the Filter by Referral Number box
actions determined as requiring approval (EPBC Act s.75)
Reference | Title | Controlling Provisions | Date |
2025/10215 | Regional Power Corporation / Energy Generation and Supply (renewable) / Lot 31 on Deposited Plan 207640; Lots 5, 14 and 15 on Deposited Plan 230140; Lot 648 on Deposited Plan 209773; Derby Hwy, Wodehouse St, Broome St / Western Australia / Derby Future Energy System | - Listed threatened species and communities (sections 18 & 18A)
| 25/07/2025 |
2025/10224 | Port of Hastings Corporation / Transport - Water / 5 Long Island Drive, Hastings 3915 / Victoria / 2025 Victorian Renewable Energy Terminal | - Ramsar wetlands (sections 16 and 17B)
- Listed threatened species and communities (sections 18 & 18A)
- Listed migratory species (sections 20 & 20A)
| 28/07/2025 |
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2025/10225 | East Australian Pipeline Pty Limited / Energy Generation and Supply (non-renewable) / 689 Merri Road, Mount Hope, NSW, 2877 / New South Wales / Moomba to Wilton Pipeline – MW733 Compressor Station (Modification 8) | 24/07/2025 |
2025/10220 | Samsung C&T Renewable Energy Australia Pty Ltd / Energy Generation and Supply (renewable) / 4178 Holbrook Road, Mangoplah, NSW / New South Wales / Mangoplah BESS | 25/07/2025 |
Assessment Approach (EPBC Act s.87)
Reference | Title | Assessment Approach | Date |
2025/10215 | Regional Power Corporation / Energy Generation and Supply (renewable) / Lot 31 on Deposited Plan 207640; Lots 5, 14 and 15 on Deposited Plan 230140; Lot 648 on Deposited Plan 209773; Derby Hwy, Wodehouse St, Broome St / Western Australia / Derby Future Energy System | Preliminary Documentation | 25/07/2025 |
DECISION ON APPROVAL (EPBC Act s.133)
Reference | Title | Approval Decision | Date |
2023/09693 | National Intermodal Corporation Limited / Transport - Land / 2025 Merriang Road, Beveridge / Victoria / Beveridge Intermodal Precinct | Approved with conditions | 25/07/2025 |
OUTCOME OF REQUEST FOR RECONSIDERATION OF S75(1) DECISION (EPBC Act s.78C)
Reference | Title | Reconsideration Decision | Date |
2016/7791 | BM Alliance Coal Operations Pty Ltd / Mining / Approx. 30km north of Dysart and approx. 167km south-west of Mackay, Qld / Queensland / Saraji East Mining Lease Project, Qld | Controlled Action | 18/07/2025 |
variation of conditions of approval (EPBC Act s.143)
Reference | Title | Date |
2022/09295 | Tasmanian Irrigation Pty Ltd / Water Management and Use / Macquarie River Catchment - Northern Midlands Council region, between Poatina / Powranna and Mona Vale / Tasmania / Northern Midlands Irrigation Scheme | 24/07/2025 |
2014/7305 | Metro Mining Pty Ltd / Mining / Skardon River, Weipa, Qld / Queensland / Metro Mining: Skardon River Bauxite Mining Project, Weipa, QLD | 25/07/2025 |
2015/7538 | Metro Mining / Mining / West Cape York / Queensland / Metro Mining: Bauxite Hills Mining and Barging Project | 25/07/2025 |
2017/8065 | UPC Robbins Island Pty Ltd / Energy Generation and Supply (renewable) / Part of 156356/1, 124651/19 and 142621/1, entire area of 124651/14, 124651/13, 124651/11, 126961/12 / Tasmania / Jim's Plain Renewable Energy Park, north-west Tasmania | 29/07/2025 |
2009/4748 | Canberra Airport Pty Ltd / Transport - Air and Space / Canberra Airport, 6km from city centre / Australian Capital Territory / Infrastructure Upgrade and Construction at Canberra Airport | 30/07/2025 |
NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))
Reference | Title | Extended to | Date |
2019/8497 | Epuron Projects Pty Ltd / Energy Generation and Supply (renewable) / Multiple on Highland Lakes Rd, Steppes, TAS, 7030 / Tasmania / St Patricks Plains Wind Farm, Central Highlands, Tas | 31/08/2025 | 25/07/2025 |
2022/09303 | Esco Solar Farm 9 Pty Ltd as trustee for the ESCO Solar Farm 9 Trust / Energy Generation and Supply (renewable) / Muscle Creek Road, Muswellbrook / New South Wales / Muswellbrook Solar Farm | 12/08/2025 | 28/07/2025 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of Climate Change, Energy, the Environment and Water or may not meet timeframes for notification. The Department of Climate Change, Energy, the Environment and Water has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of Climate Change, Energy, the Environment and Water regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.
Overview
The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) was enacted by the Parliament of Australia to address the need for a comprehensive framework for the protection of the environment, particularly in relation to biodiversity conservation and the management of activities that may have significant environmental impacts. The Act aims to provide a coordinated national approach to environmental protection, taking into account both Commonwealth and state responsibilities. The EPBC Act seeks to ensure that proposed actions that may have a significant impact on matters of national environmental significance are properly assessed and managed. This includes protecting listed threatened species, ecological communities, and migratory species, as well as managing impacts on World Heritage properties, Ramsar wetlands, and other areas of environmental significance. The Act establishes a system for assessing and approving actions that may impact the environment, requiring proponents to submit detailed information and undergo rigorous evaluation by the relevant authorities.
The Department of Climate Change, Energy, the Environment and Water is responsible for administering the EPBC Act and ensuring compliance with its provisions. The Department has implemented systems and quality assurance procedures to minimise the risk of missing notifications regarding the processing of referrals for approval under the Act. While the Department strives to meet notification timeframes, it acknowledges that occasional missed notifications may occur. In such cases, the Department commits to notifying the public of these missed notifications, even if the notification timeframe has lapsed. This practice ensures transparency and maintains the public's access to information about the history of notifications for each referral. Importantly, any missed notifications do not affect the subsequent processing of referrals or the decisions made under the EPBC Act.
Scope and Application
The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) applies to a wide range of entities and actions that may have a significant impact on matters of national environmental significance, such as listed threatened species and communities, Ramsar wetlands, and listed migratory species. The Act primarily applies to Commonwealth authorities and actions that require approval under the Act, although it can also apply to state and territory actions if they are deemed to have a significant impact on the matters of national environmental significance. The geographic reach of the Act is national, with actions occurring within Australia or its external territories. The Act's application is not restricted to specific industries but can encompass various sectors, including energy generation and supply, water management, mining, and transport. The Act can extend its application through subordinate instruments, such as regulations and guidelines, which provide further detail on specific matters. However, certain actions may be exempt from the Act’s approval requirements if they are considered to have a minor or negligible impact on the matters of national environmental significance, as determined by the Minister. The Department of Climate Change, Energy, the Environment and Water is responsible for ensuring that notifications regarding referrals for approval under the Act are processed and communicated within the required timeframes, with systems in place to address any missed notifications to maintain transparency and public access to information.
Key Provisions
The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) is a key piece of Australian legislation that governs actions that may impact on matters of national environmental significance. The Act includes provisions for the approval of certain actions that may have such an impact (sections 75 and 78C), and sets out the process for assessing and approving or disapproving these actions. According to the gazetted decisions from 28/07/2025 to 3/08/2025, several projects have been determined to require approval under the EPBC Act. For example, Regional Power Corporation's proposed Derby Future Energy System in Western Australia, and Port of Hastings Corporation's proposed 2025 Victorian Renewable Energy Terminal in Victoria. These projects involve energy generation and supply, and their potential impact on listed threatened species and communities, Ramsar wetlands, and listed migratory species are among the environmental considerations assessed.
The EPBC Act imposes specific obligations on parties or entities that undertake actions requiring approval. For instance, these entities must submit detailed documentation about the proposed action, including its potential environmental impacts and proposed mitigation measures. The Act also requires that public notifications be made available, ensuring transparency and community involvement in the decision-making process. Additionally, entities must comply with any conditions imposed by the Minister as part of the approval process. The approvals, such as the one given to National Intermodal Corporation Limited for the Beveridge Intermodal Precinct in Victoria, are subject to specific conditions that the entity must adhere to.
Failure to comply with the requirements of the EPBC Act can lead to significant civil and criminal consequences. The Act provides for various offences, including unauthorised actions that impact matters of national environmental significance, which can result in substantial fines and even imprisonment. For example, if an entity proceeds with a controlled action without the required approval, they could face penalties that include fines of up to AUD 5.5 million for a corporation and AUD 1.1 million for an individual, along with potential imprisonment terms. These penalties reflect the serious nature of non-compliance and the importance of adhering to the environmental protections mandated by the Act.