DEPARTMENT OF CLIMATE CHANGE, ENERGY, THE ENVIRONMENT AND WATER
Environment Protection and Biodiversity Conservation Act 1999
EPBC Act Part 7-9 decisions published, 02/12/2024 to 08/12/2024
For further information see the referrals list at https://epbcpublicportal.environment.gov.au/all-referrals/
and type the reference number in the Filter by Referral Number box
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2024/09914 | STRIKE WEST PTY. LTD. / Exploration (mineral, oil and gas - non-marine) / Tomkins Rd and Robb Rd, Shire of Three Springs / Western Australia / Southwest Erregulla-1 (SWE-1), Drilling Exploration Well | 29/11/2024 |
2024/09942* | Ronald Karunamoorthy / Residential Development / David Low Way, Pacific Paradise / Queensland / Twin Waters West Masterplanned Community | 29/11/2024 |
2024/09946* | BLUE ECONOMY CRC-CO LTD / Aquaculture / Bass Strait Blue Economy Zone, approximately 12km north of Emu Bay, Burnie / Commonwealth Marine / Bass Strait Blue Economy Zone, Marine Aquaculture Trial in Commonwealth Waters | 29/11/2024 |
2024/09953 | Tessa Cox / Commonwealth / Barton Highway, Blocks 1426, 1427, 1545, 1609 and 1630 District of Belconnen / Australian Capital Territory / CSIRO Divestment of Rural Blocks | 5/12/2024 |
* Actions which are not controlled actions provided they are undertaken in a particular manner. Further information on provision and manner specified is available from https://epbcpublicportal.environment.gov.au/all-referrals/
DECISION ON APPROVAL (EPBC Act s.133)
Reference | Title | Approval Decision | Date |
2023/09446 | SHIRE OF YORK / Transport - Land / York-Tammin Rd, Malebelling, Badgin, Greenhills, and Narraloggan / Western Australia / Road Verge Clearing for Road Reconstruction and Widening | Approved without conditions | 2/12/2024 |
OUTCOME OF REQUEST FOR RECONSIDERATION OF S75(1) DECISION (EPBC Act s.78C)
Reference | Title | Reconsideration Decision | Date |
2019/8485 | BOWEN BASIN COAL PTY. LTD. / Mining / Lot 10 on Plan CNS93. / Queensland / Lake Vermont Meadowbrook Coal Mine Project, Qld | Controlled Action | 3/12/2024 |
2021/8875 | Boggabri Coal Pty Limited / Mining / Leards Forest Road, 15 km north east Boggabri, Boggabri / New South Wales / Boggabri Coal Mine SSD 09_0182 Modification 8 | Controlled Action | 3/12/2024 |
2021/9031 | BM Alliance Coal Operations Pty Limited / Mining / Caval Ridge Mine, Moranbah / Queensland / Caval Ridge Mine Horse Pit Extension, Bowen Basin | Controlled Action | 3/12/2024 |
variation of conditions of approval (EPBC Act s.143)
Reference | Title | Date |
2014/7217 | Alexander Seal / Residential Development / Lot 7369 Myall Rd Cardiff & Lots 10 & 100 Myall Rd, Garden Suburb / New South Wales / Residential development, Hillsborough, NSW | 2/12/2024 |
2015/7530 | Pioneer Fortune Pty Ltd / Residential Development / Wyatt Road, Undullah, 50 km south of Brisbane / Queensland / Greater Flagstone master planned residential development, Undullah, Qld | 2/12/2024 |
2019/8468 | ELECTRANET PTY LIMITED / Energy Generation and Supply (renewable) / Multiple lots / South Australia / SA-NSW Energy Interconnector, Robertstown to NSW Border, SA | 2/12/2024 |
NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))
Reference | Title | Extended to | Date |
2021/9124 | Department of Infrastructure, Transport, Regional Development and Communications / Commonwealth / Kingston Pier, Kingston and the Old Cascade Quarry, Cascade. / Norfolk Island / Kingston Pier Channel Construction Project | 31/01/2025 | 2/12/2024 |
2019/8587 | Lendlease Communities (Figtree Hill No. 3) Pty Limited / Residential Development / west of Appin Road, near Campbelltown / New South Wales / Mt Gilead Stage 2 Residential Development | 6/02/2025 | 4/12/2024 |
2017/8096 | UPC ROBBINS ISLAND PTY LTD / Energy Generation and Supply (renewable) / Lot 110402/1 (Robbins Island) and some areas of Crown land. The locati / Tasmania / Robbins Island Renewable Energy Park, Robbins Island, Tasmania | 7/03/2025 | 5/12/2024 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of Climate Change, Energy, the Environment and Water or may not meet timeframes for notification. The Department of Climate Change, Energy, the Environment and Water has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of Climate Change, Energy, the Environment and Water regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.
Overview
The Environment Protection and Biodiversity Conservation Act 1999 (Cth), enacted by the Australian Parliament, addresses the need for a comprehensive framework to protect and conserve the environment, particularly by regulating activities that may have significant impacts on the environment, including biodiversity and world heritage properties. This legislation aims to provide for the protection of the environment and the conservation of biodiversity, including flora, fauna, and ecological communities. The policy objective is to ensure that environmental considerations are integrated into decision-making processes, thereby promoting sustainable development and protecting the environment for future generations. The Department of Climate Change, Energy, the Environment and Water, as the administering body, oversees the implementation of the Act, including the assessment and approval of activities that may affect the environment.
Scope and Application
The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) applies to a wide range of entities and activities across Australia, including individuals, corporations, government bodies, and industries, with a focus on actions that may have a significant impact on matters of national environmental significance. The Act covers various types of actions such as land clearing, mining, oil and gas exploration, residential and commercial developments, and renewable energy projects. It also extends to Commonwealth waters and external territories, ensuring a comprehensive approach to environmental protection. Notably, certain actions may be exempt from the Act if they meet specific criteria, such as being minor in nature or already adequately regulated under other laws. The Act can be further extended or modified through subordinate legislation, allowing for adjustments to the regulatory framework as necessary. The EPBC Act is administered by the Department of Climate Change, Energy, the Environment and Water, which is responsible for ensuring that the provisions of the Act are implemented effectively across the nation.
Key Provisions
The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) encompasses various provisions that govern different activities, requiring or permitting certain actions under specific sections. Section 75 of the EPBC Act outlines the actions that do not require approval if undertaken in a particular manner. For instance, the exploration for minerals, oil, and gas, as seen in the case of STRIKE WEST PTY. LTD. (2024/09914), can proceed without approval if it adheres to the specified conditions. Similarly, residential developments, like the one by Ronald Karunamoorthy (2024/09942), can also be exempt from approval under certain conditions. Marine aquaculture trials, such as the one by BLUE ECONOMY CRC-CO LTD (2024/09946), and divestments of rural blocks by the Commonwealth, like the one by Tessa Cox (2024/09953), are also subject to similar provisions.
The Act imposes various obligations and requirements on parties or entities it governs. For example, Section 133 of the EPBC Act allows for the approval of controlled actions subject to certain conditions. The Shire of York's road verge clearing project (2023/09446) was approved without conditions, indicating compliance with all necessary environmental assessments and public consultations. The Act also mandates reconsiderations for certain decisions, as per Section 78C, which can be seen in the cases of BOWEN BASIN COAL PTY. LTD. (2019/8485), Boggabri Coal Pty Limited (2021/8875), and BM Alliance Coal Operations Pty Limited (2021/9031). These reconsiderations ensure that the initial decisions were made fairly and in accordance with the Act.
The EPBC Act outlines specific offences, penalties, and consequences for breaches, with penalties varying depending on the severity of the offence. For instance, unauthorized actions that significantly harm the environment can lead to substantial fines and even imprisonment. Section 143 of the Act allows for the variation of conditions of approval, seen in cases like Alexander Seal's residential development (2014/7217) and Pioneer Fortune Pty Ltd's master planned residential development (2015/7530). Additionally, Section 130(4) provides for the extension of time for certain projects, as observed in the Kingston Pier Channel Construction Project (2021/9124) and Robbins Island Renewable Energy Park (2017/8096). Failure to comply with these provisions can result in legal consequences, including fines and the suspension of project approvals.
In summary, the EPBC Act provides a comprehensive framework for managing environmental impacts through various sections that define what actions require approval, impose obligations on entities, and outline penalties for non-compliance. The Act ensures that activities such as mineral exploration, residential developments, and energy projects are conducted in a manner that minimizes environmental harm, thereby protecting Australia's biodiversity and ecosystems.