Environment Protection (Sea Dumping) Amendment Regulations 2009 (No. 1)

Administered by Department of the Environment and Energy

Legislation au F2009L01220 Regulations Not in force Legislative Instrument

Legislation content

EXPLANATORY STATEMENT

 

Select Legislative Instrument 2009 No. 57

 

 

Environment Protection (Sea Dumping) Act 1981

 

Environment Protection (Sea Dumping) Amendment Regulations 2009 (No. 1)

 

The Environment Protection (Sea Dumping) Act 1981 (the Act) provides for the protection of the environment by regulating dumping into the sea, incineration at sea,  artificial reef placements and related matters.  The Act prohibits certain actions from being undertaken without a permit.

 

Section 41 of the Act provides, in part, that the GovernorGeneral may make regulations, not inconsistent with the Act, prescribing all matters required or permitted by the Act to be prescribed, or necessary or convenient to be prescribed for carrying out or giving effect to the Act.

 

Section 40 of the Act provides, in part, that the regulations may prescribe fees to be paid in respect of an application for a permit or any other application under the Act.

 

The Environment Protection (Sea Dumping) Regulations 1983 (the Principal Regulations) prescribed fees payable for permits to dump dredged or excavated material into the sea (regulation 5) and for certain other applications made under the Act (regulation 5A).

 

These Regulations amend the Principal Regulations to:

  • adjust the fees payable by persons applying for a permit or applying for a variation to a permit under the Act; and
  • simplify the fee structure in relation to dredged or excavated material by:
    • removing the distinction between contaminated and non-contaminated materials;
    • removing the distinction between environmentally sensitive and non-environmentally sensitive areas;
    • removing a category of fees based on the time period for which the permit is sought; and
    • amending the category of fees relating to the quantity of material proposed to be dumped, by removing reference to material of

500 000 m3 or more. 

 

The amended fees give effect to the Australian Government Cost Recovery Policy, which requires agencies to set charges to recover the full cost of regulation, where it is efficient to do so.  The previous fee structure achieved only partial cost recovery.  The amendments were therefore necessary to achieve compliance with current Government policy.  The Regulations do not substantially alter existing administrative arrangements. 

 

The previous distinction between contaminated and non contaminated materials in regulation 5 created an unnecessary level of complexity in the permit fee structure.  The National Ocean Disposal Guidelines for Dredged Material establishes a comprehensive framework for the assessment of the environmental impacts caused by the disposal at sea of dredged material.  The contamination level of material and the environmental sensitivity of proposed dumping areas are currently considered in the permit assessment process under the Act in accordance with these guidelines. 

 

The Regulations combine regulations 5 and 5A, specifying fees for:

  • permits for the dumping of two categories of dredged or excavated material into the sea:
    • large scale (greater than 100 000 m3); and
    • small scale (100 000 m3 or less);
  • a permit to dump a vessel into the sea;
  • a permit to dump a platform into the sea;
  • an artificial reef permit;
  • a permit to bury a person at sea; and
  • the variation of a permit granted under the Act.

 

Consultation was undertaken with industry groups that will be affected by these amendments, through Ports Australia, formerly the Association of Australian Ports and Marine Authorities (AAPMA).  Consultation involved Departmental officers attending by invitation the AAPMA’s annual Environment and Sustainability Working Group meeting in 2007.  At this meeting industry representatives were briefed on the amendments and the reason for them and were able to provide direct feedback. 

 

Details of the Regulations are set out in the Attachment.

 

These Regulations are a legislative instrument for the purposes of the Legislative Instruments Act 2003.

 

The Regulations commenced on the day after they were registered on the Federal Register of Legislative Instruments.

 

 

 

 

 

 

 

 

 


ATTACHMENT

 

Details of the Environment Protection (Sea Dumping) Amendment Regulations 2009 (No. 1)

 

Regulation 1 – Name of Regulations

 

This regulation provides that the title of the Regulations is the Environment Protection (Sea Dumping) Amendment Regulations 2009 (No. 1).

 

Regulation 2 – Commencement

 

This regulation provides that the Regulations commenced on the day after they were registered.

 

Regulation 3 – Amendment of Environment Protection (Sea Dumping) Regulations 1983

 

This regulation provides that the Environment Protection (Sea Dumping) Regulations 1983 (the Principal Regulations) are amended as set out in Schedule 1.

 

Regulation 4 – Transitional

 

This regulation provides that regulations 5 and 5A of the Principal Regulations, which were repealed by these Regulations, continue to apply to permit applications made before the commencement of these Regulations.

 

Schedule 1 – Amendments

 

Item [1] – Regulations 5 and 5A

 

Regulation 5 of the Principal Regulations prescribed the permit fees applicable for a permit to dump contaminated and non-contaminated dredged or excavated material into the sea.  This regulation also set different fees for the length of the permit applied for and distinguished between three classes of material based on quantity.   Regulation 5A of the Principal Regulations prescribed the fees applicable for other applications made under the Act. 

 

Item 1 substituted regulations 5 and 5A of the Principal Regulations with new regulation 5.  It simplified the permit fee structure by removing the distinctions between contaminated material, environmentally sensitive areas and length of time for which the permit is sought.  Furthermore, the fee category for dredged or excavated material of 500 000 m3 or more was removed.  A permit for material of this volume is now captured under the category of large-scale dredged or excavated material over 100 000 m3. 

 

 

 

 

 

 

Item 1 also amended the fee amount payable for a permit application in accordance with the following table:

 

Application Type

Previous Permit Application Fee ($)

Current Permit Application Fee ($)

Dumping of large-scale dredged or excavated material (over 100 000 m3)

11,000 - 16,500

23,500

Dumping of small-scale dredged or excavated material  (100 000 m3 or less)

5,500 – 16,500

10,000

Dump a vessel into any part of the sea

5,000

12,700

Dump a platform into any part of the sea

10,000

12,700

Create an artificial reef

5,000

10,000

Bury a person at sea

1,000

1,675

Dumping of other material controlled by the Act

5,000

5,000

Vary a permit granted under the Act

500

860

 

Item [2] – Regulation 5B

 

Regulation 5B of the Principal Regulations provided for the time for payment of the fee for an application mentioned in regulation 5 or 5A.  Item 2 is of a minor and technical nature and removed reference to regulation 5A as a consequence of the amendments in item 1. 

 

Item [3] – Schedule 2

 

Schedule 2 to the Principal Regulations specified screening levels for various substances including metals, metalloids and organics, in order to determine if the substance was classified as ‘contaminated’.  This item omits Schedule 2 as a consequence of the amendments in item 1, which removed the distinction between contaminated and non-contaminated material.

 

Overview

The Environment Protection (Sea Dumping) Act 1981, enacted by the Parliament of Australia, was established to safeguard the marine environment by regulating activities such as sea dumping, incineration at sea, and artificial reef placements. The Act aims to ensure these activities are conducted in a manner that minimises environmental harm and requires permits for certain actions. The Act was introduced to fill the legislative gap concerning the need for comprehensive regulation over activities that could potentially harm marine ecosystems. In line with the Australian Government Cost Recovery Policy, the Environment Protection (Sea Dumping) Amendment Regulations 2009 (No. 1) were introduced to revise the fee structure for permits and applications under the Act, aiming to achieve full cost recovery for the regulatory activities. These amendments were necessary to streamline the fee structure and ensure compliance with current government policy while maintaining the environmental safeguards provided by the Act. The amendments to the Environment Protection (Sea Dumping) Regulations 1983, as enacted by these Regulations, sought to simplify the fee structure by removing distinctions between contaminated and non-contaminated materials, environmentally sensitive and non-environmentally sensitive areas, and varying permit durations. Additionally, the fee category for material volumes exceeding 500,000 m3 was adjusted to fit within the new large-scale category of over 100,000 m3. This reform aimed to reduce complexity and align the fee structure with the full cost recovery policy. The changes were made following consultations with industry stakeholders, ensuring that the amendments met practical needs while upholding the Act’s environmental objectives.

Scope and Application

The Environment Protection (Sea Dumping) Act 1981 applies to individuals and entities that intend to engage in activities such as dumping into the sea, incineration at sea, and artificial reef placements. The Act regulates these activities to protect the marine environment, prohibiting such actions without the appropriate permit. The scope of the Act is national, as it is a Commonwealth Act, and its provisions extend to the entire Australian jurisdiction, including territorial waters. The Act allows for the creation of subordinate regulations to further specify the application of its provisions, including fees and permit conditions. The Environment Protection (Sea Dumping) Amendment Regulations 2009 (No. 1) provide for adjustments to the fees associated with permit applications and variations, aiming to achieve full cost recovery in accordance with the Australian Government Cost Recovery Policy. These Regulations simplify the fee structure by removing distinctions based on material contamination and environmental sensitivity, as well as other categories previously used. Notably, the Regulations maintain transitional provisions to ensure that previously established fees continue to apply to permit applications made before the commencement of the amendments.

Key Provisions

The Environment Protection (Sea Dumping) Amendment Regulations 2009 (No. 1) (the Regulations) amend the Environment Protection (Sea Dumping) Regulations 1983 (the Principal Regulations) to adjust the fees payable for permit applications and to simplify the fee structure for permits related to the dumping of dredged or excavated material into the sea (Regulation 3). The fees are now based on the scale of the operation rather than the specific details of the material and the location of the dumping (Regulation 5). The Regulations also remove distinctions between contaminated and non-contaminated materials, environmentally sensitive and non-environmentally sensitive areas, and fees based on the time period for which the permit is sought (Schedule 1, Item 1). Furthermore, they amend the fee for large-scale operations by removing the reference to material of 500 000 m3 or more (Schedule 1, Item 1). The Regulations impose obligations on applicants for permits under the Environment Protection (Sea Dumping) Act 1981 (the Act) to pay the fees as specified in the Regulations (Regulation 5). Permit applicants must now pay the updated fees as per the amended fee structure, which includes fees for large-scale and small-scale operations, dumping of vessels and platforms, artificial reef creation, burial at sea, and variations to existing permits (Regulation 5). The Regulations also require that the fees be paid within the time frames specified in the Act and the Regulations (Regulation 5B). Breach of the fee payment requirements under the Regulations may result in administrative or legal consequences. The Act provides for various offences and penalties for non-compliance with its provisions, although specific penalties for fee non-payment are not detailed in the Regulations. Generally, under the Act, unauthorised sea dumping can lead to fines and imprisonment, with penalties varying depending on the severity of the breach. The maximum penalty for individuals can be significant, reflecting the seriousness of environmental harm caused by non-compliance with sea dumping regulations (Section 28, Act).

Legal classification tags

Area of Law
Environmental Law
Instrument
Regulation
Concepts
Definitions & Interpretation
Regulatory Standards
Fees & Charges

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.