THE COMMONWEALTH OF AUSTRALIA.
APPROPRIATION (WORKS AND BUILDINGS).
No. 6 of 1907.
An Act to grant and apply a sum out of the Consolidated Revenue Fund to the service of the year ending the thirtieth day of June One thousand nine hundred and eight for the purposes of Additions, New Works, Buildings, &c.
[Assented to 8th October, 1907.]
Preamble.
BE it enacted by the King’s Most Excellent Majesty, the Senate and the House of Representatives of the Commonwealth of Australia, for the purpose of appropriating the grant originated in the House of Representatives, as follows:—
Short title.
1. This Act may be cited as the Appropriation (Works and Buildings) Act 1907-8.
Issue and application of £686,824.
2. The Treasurer may issue out of the Consolidated Revenue Fund, and apply towards making good the supply hereby granted to His Majesty for the service of the year ending the thirtieth day of June One thousand nine hundred and eight the sum of Six hundred and eighty-six thousand eight hundred and twenty-four pounds.
Appropriation of supply.
3. The said sum granted by this Act is hereby appropriated for the purposes and services expressed in the Schedule.
F. 12892.
SCHEDULE.
Expenditure for Additions, New Works, Buildings, &c., 1907–8.
ABSTRACT.
— | “Other.” | Total. | |
Revote. | New Service. | ||
UNDER CONTROL OF DEPARTMENT OF HOME AFFAIRS— | £ | £ | £ |
Home Affairs.......................... | 4,000 | 2,000 | 6,000 |
Trade and Customs....................... | 8,984 | 13,716 | 22,700 |
Defence.............................. | 20,314 | 45,732 | 66,046 |
Post and Telegraph....................... | 27,549 | 119,529 | 147,078 |
Total..................... | 60,847 | 180,977 | 241,824 |
| 241,824 |
| |
Less amount which it is anticipated may not be expended during year | 20,000 | 20,000 | |
| 221,824 | 221,824 | |
UNDER CONTROL OF POSTMASTER-GENERAL’S DEPARTMENT— |
|
| |
Telegraphs and Telephones................. | 300,000 | 300,000 | |
UNDER CONTROL OF DEPARTMENT OF THE TREASURY— |
|
| |
Machinery and Plant, for Printing Office......... | 2,000 | 2,000 | |
UNDER CONTROL OF DEPARTMENT OF DEFENCE— |
|
| |
Special Defence Material................... | 80,000 | 80.000 | |
New Special Defence Provision............... | 82,000 | 82,000 | |
UNDER CONTROL OF DEPARTMENT OF EXTERNAL AFFAIRS— |
|
| |
Commonwealth Offices, London.............. | 1,000 | 1,000 | |
Total..................... | 686,824 | 686,824 | |
UNDER CONTROL OF DEPARTMENT OF HOME AFFAIRS. | “Other.” | ||
Revote. | New Service. | Total. | |
Division No. 1. | £ | £ | £ |
HOME AFFAIRS. |
|
|
|
Subdivision No. 1. |
|
|
|
NEW SOUTH WALES. |
|
|
|
No. 1. Towards the cost of erection of Store at Darling Island, Sydney, for the purposes of Departments of the Commonwealth | 4,000 | 2,000 | 6,000* |
Total Division No. 1.................... | 4,000 | 2,000 | 6,000 |
Division No. 2. |
|
|
|
TRADE AND CUSTOMS. |
|
|
|
Subdivision No. 1. |
|
|
|
NEW SOUTH WALES. |
|
|
|
New Works— |
|
|
|
No. 1. Custom House, Broken Hill.............. | … | 600 | 600 |
2. Launch............................ | … | 1,000 | 1,000 |
| … | 1,600 | 1,600 |
Subdivision No. 2. VICTORIA. |
|
|
|
New Works— |
|
|
|
No. 1. Laboratory.......................... | … | 1,000 | 1,000 |
Subdivision No. 3. |
|
|
|
QUEENSLAND. |
|
|
|
Additions— |
|
|
|
No. 1. Minor Alterations and Additions........... | … | 100 | 100 |
Subdivision No. 4. |
|
|
|
WESTERN AUSTRALIA. |
|
|
|
Additions — |
|
|
|
No. 1. Custom House, Broome................. | … | 400 | 400 |
New Works— |
|
|
|
No. 2. Towards the cost of erection of Customs House, Fremantle..... | 1,000 | 6,500 | 7,500† |
| 1,000 | 6,900 | 7,900 |
Subdivision No. 5. TASMANIA. |
|
|
|
Additions— |
|
|
|
No. 1. Sewerage Connexions with Metropolitan Board’s scheme...... | … | 100 | 100 |
Subdivision No. 6. |
|
|
|
TRAWLER AND EQUIPMENTS............. | 7,984 | 4,016 | 12,000 |
Total Division No. 2..................... | 8,984 | 13,716 | 22,700 |
* Total cost, £30,000. † Total cost, £10,000.
F.12892. B
Under Control of Department of Home Affairs— continued. | “Other.” | ||
Revote. | New Service. | Total. | |
Division No. 3. | £ | £ | £ |
DEFENCE. |
|
|
|
Subdivision No. 1. |
|
|
|
NEW SOUTH WALES. |
|
|
|
Additions— |
|
|
|
No. 1. Fortifications............................ | 44 | 273 | 317 |
2. Barracks............................... | 275 | 952 | 1,227 |
3. Rifle Ranges............................. | 1,703 | 3,269 | 4,972 |
4. Drill Halls.............................. | 132 | 98 | 230 |
5. Adamstown—Rifle Range.................... | 317 | … | 317 |
6. Cootamundra — Extension of Rifle Range......... | … | 330 | 330 |
7. Lismore — Extension of Rifle Range............ | … | 394 | 394 |
8. Extension Boat Shed, Naval Forces.............. | 250 | … | 250 |
New Works— |
|
|
|
No. 9. Fortifications............................ | … | 100 | 100 |
10. Barracks.............................. | 100 | 200 | 300 |
11. Rifle Ranges............................ | 450 | 403 | 853 |
12. Drill Halls............................. | 303 | 110 | 413 |
13. Armidale—Site and Drill Hall and Offices........ | 596 | 249 | 845 |
14. Bega—Drill Hall......................... | … | 650 | 650 |
15. Casino—Drill Hall........................ | 325 | 400 | 725 |
16. Lismore—Drill Hall and Offices............... | … | 420 | 420 |
17. Newcastle—Towards cost of Site and Drill Hall.... | 1,000 | … | 1,000* |
18. Newcastle—Site and Boat and Drill Shed and three (3) Boats, Naval Forces | … | 780 | 780 |
19. Victoria Barracks, Sydney —Drill Hall and Offices for Australian Army Service Corps | … | 900 | 900 |
20. Victoria Barracks, Sydney —Accommodation for Australian Field Artillery | … | 1,350 | 1,350 |
Carried forward..................... | 5,495 | 10,878 | 16,373 |
* Total cost £2,000.
Under Control of Department of Home Affairs— continued. | “Other.” | ||
Revote. | New Service. | Total. | |
| £ | £ | £ |
Division No. 3. |
|
|
|
DEFENCE. |
|
|
|
Subdivision No. 1. |
|
|
|
NEW SOUTH WALES. |
|
|
|
Brought forward................................ | 5,495 | 10,878 | 16,373 |
New Works— |
|
|
|
No. 21. West Maitland—Drill Hall and Site................... | … | 700 | 700 |
22. Long Bay—Towards cost of Rifle Range............... | … | 1,000 | 1,000* |
23. Singleton—Land and Construction of Rifle Range......... | 636 | 714 | 1,350 |
24. Telegraph Point—Site for Rifle Range................. | … | 27 | 27 |
25. Miniature Rifle Ranges for Cadets.................... | … | 750 | 750 |
26. Grants to Rifle Clubs for Ranges..................... | … | 1,000 | 1,000 |
27. Belle Vue Hill and Gore Hill—Sites for Signalling Stations... | … | 380 | 380 |
28. South Head—Erection two (2) Warrant Officers’ Quarters.... | … | 900 | 900 |
29. Transfer of Electric Company’s Depot Buildings from Dawes Point to old Paddington Rifle Range | 291 | 167 | 458 |
30. Minor Works, Naval Forces........................ | … | 100 | 100 |
Total New South Wales...................... | 6,422 | 16,616 | 23,038 |
Subdivision No. 2. |
|
|
|
VICTORIA. |
|
|
|
Additions— |
|
|
|
No. 1. Fortifications................................... | 275 | 100 | 375 |
2. Barracks..................................... | 215 | 1,047 | 1,262 |
3. Rifle Ranges................................... | 650 | 1,485 | 2,135 |
4. Drill Halls.................................... | 75 | 659 | 734 |
5. Williamstown Rifle Range.......................... | … | 529 | 529 |
6. St. Kilda Orderly Room........................... | … | 475 | 475 |
7. Alterations and Additions to existing works and buildings, Naval Forces | 17 | … | 17 |
Carried forward......................... | 1,232 | 4,295 | 5,527 |
6,422 | 16,616 | 23,038 | |
* Total cost £2,100.
B 2
Under Control of Department of Home Affairs —continued. | “Other.” | ||
Revote. | New Service. | Total. | |
Division No. 3. |
|
|
|
DEFENCE. | £ | £ | £ |
Brought forward................... | 6,422 | 16,616 | 23,038 |
Subdivision No. 2. |
|
|
|
VICTORIA. |
|
|
|
Brought forward.................... | 1,232 | 4,295 | 5,527 |
New Works— |
|
|
|
No. 8. Fortifications................................... | 47 | 150 | 197 |
9. Barracks............................. | … | 710 | 710 |
10. Bendigo—Rifle Range Extension........... | … | 450 | 450 |
11. Canadian (Ballarat)— Quarters at Rifle Range... | 446 | 30 | 476 |
12. Castlemaine—Rifle Range................ | … | 600 | 600 |
13. Williamstown Rifle Range —Towards cost of completion of “A” Trench | … | 500 | 500* |
14. Grafts to Rifle Clubs for Rifle Ranges........ | … | 1,000 | 1,000 |
15. Victoria Barracks—Towards completion Australian Army Medical Corps Depôt | … | 200 | 200 |
16. Victoria Barracks — Shed for vehicles and accessories, Ordnance Stores | 70 | … | 70 |
17. Williamstown Naval Depôt— Reconstruction of Slipways and Cradles | … | 900 | 900 |
18. Swan Island—Towards cost of Dredging Boat Harbor | … | 500 | 500† |
19. Site for Rifle Range, Kyneton.............. | 1,424 | … | 1,424 |
20. Miniature Rifle Ranges for Cadets........... | … | 750 | 750 |
Total Victoria................... | 3,219 | 10,085 | 13,304 |
Subdivision No. 3 |
|
|
|
QUEENSLAND. |
|
|
|
Additions— |
|
|
|
No. 1. Fortifications......................... | 200 | 130 | 330 |
2. Barracks............................. | … | 120 | 120 |
3. Rifle Ranges.......................... | … | 380 | 380 |
4. Drill Halls........................... | … | 966 | 966 |
5. Alterations and Additions, Victoria Barracks, Brisbane | … | 404 | 404 |
6. Lytton Fort (Oil engine and Dynamo)......... | … | 550 | 550 |
Carried forward............ | 200 | 2,550 | 2,750 |
9,641 | 26,701 | 36,342 | |
* Total cost, £1,000. † Total cost, £1,000.
Under Control of Department of Home Affairs— continued. | “Other.” | ||
Revote. | New Service. | Total. | |
£ | £ | £ | |
Division No. 3. |
|
|
|
DEFENCE. |
|
|
|
Brought forward...................... | 9,641 | 26,701 | 36,342 |
Subdivision No. 3. |
|
|
|
QUEENSLAND. |
|
|
|
Brought forward....................... | 200 | 2,550 | 2,750 |
New Works— |
|
|
|
No. 7. Brisbane Rifle Range for Metropolitan Troops— Towards cost of construction and site | 1,000 | … | 1,000* |
8. Bundaberg—Site for Drill Hall....................... | … | 175 | 175 |
9. Maryborough — Towards cost of site and construction of Rifle Range | … | 1,000 | 1,000† |
10. Miniature Rifle Ranges at Drill Halls.................. | 295 | 300 | 595 |
11. Grants to Rifle Clubs for Ranges..................... | … | 300 | 300 |
12. Minor New Works, Naval Forces.................... | … | 140 | 140 |
13. Miniature Rifle Ranges for Cadets.................... | … | 450 | 450 |
Total Queensland................... | 1,495 | 4.915 | 6,410 |
Subdivision No. 4. |
|
|
|
SOUTH AUSTRALIA. |
|
|
|
Additions — |
|
|
|
No. 1. Barracks...................................... | … | 285 | 285 |
2. Rifle Ranges................................... | 135 | 365 | 500 |
3. Additions to Caretaker’s Quarters, Naval Forces........... | … | 70 | 70 |
4. Alterations H.M.A.S. Protector...................... | … | 475 | 475 |
Carried forward.......................... | 135 | 1,195 | 1,330 |
11,136 | 31,616 1 | 42,752 | |
* Total cost, £5,000. † Total cost, £1,156 construction, site £750.
Under Control of Department of Home Affairs —continued. | “Other.” | ||
Revote. | New Service. | Total. | |
Division No. 3. | £ | £ | £ |
DEFENCE. |
|
|
|
Brought forward............................ | 11,136 | 31,616 | 42,752 |
Subdivision No. 4. |
|
|
|
SOUTH AUSTRALIA. |
|
|
|
Brought forward............................ | 135 | 1,195 | 1,330 |
New Works— |
|
|
|
No. 5. Naracoorte—Drill Hall and Orderly Room................ | 225 | … | 225 |
6. Orroroo—Land and Building for Drill Hall and Orderly Room.. | 254 | 76 | 330 |
7. Rifle Ranges................................... | … | 180 | 180 |
8. Grants to Rifle Clubs for Ranges...................... | … | 300 | 300 |
9. Erection Shed for Ordnance Branch.................... | … | 310 | 310 |
10. Minor New Works............................... | 109 | … | 109 |
11. Miniature Rifle Ranges for Cadets.................... | … | 450 | 450 |
Total South Australia........... | 723 | 2,511 | 3,234 |
Subdivision No. 5. |
|
|
|
WESTERN AUSTRALIA. |
|
|
|
Additions— |
|
|
|
No. 1. Fortifications................................... | … | 173 | 173 |
2. Barracks..................................... | … | 530 | 530 |
3. Rifle Ranges................................... | … | 50 | 50 |
4. Drill Halls.................................... | 103 | … | 103 |
5. Perth—Additions to Armourer’s Workshop.............. | … | 700 | 700 |
New Works— |
|
|
|
No. 6. Barracks................................. | … | 350 | 350 |
7. Karrakatta — Additional Target Accommodation at Rifle Range. | 90 | … | 90 |
8. Karrakatta—New Road at Rifle Range.................. | 59 | … | 59 |
9. Kalgoorlie—Construction of Rifle Range................ | 155 | 1,200 | 1,355 |
10. North Fremantle — Towards the Construction of Fort and Acquisition of Site | 5,750 | … | 5,750 |
11. Miniature Rifle Ranges for Cadets.................... | … | 300 | 300 |
Total Western Australia............. | 6,157 | 3,303 | 9,460 |
Carried forward............... | 18,016 | 37,430 | 55,446 |
Under Control of Department of Home Affairs— continued. | “Other.” | ||
| Revote. | New Service | Total. |
| £ | £ | £ |
Division No. 3. |
|
|
|
DEFENCE. |
|
|
|
Brought forward...................... | 18,016 | 37,430 | 55,446 |
Subdivision No. 6. |
|
|
|
TASMANIA. |
|
|
|
Additions— |
|
|
|
No. 1. Barracks............................ | … | 80 | 80 |
2. Rifle Ranges......................... | … | 225 | 225 |
3. Drill Halls.......................... | 252 | … | 252 |
4. Sandy Bay — Fencing, Rifle Range........... | … | 500 | 500 |
New Works— |
|
|
|
No. 5. Hobart— Site, and constructing Gun Emplacement and Accessories | 722 | 1,292 | 2,014 |
6. Launceston—Magazine................... | 600 | 300 | 900 |
7. Ross—Drill Hall....................... | … | 550 | 550 |
8. Alexandra Battery—Erection of Cottage for District Gunner | 250 | … | 250 |
9. Sandy Bay — Land for Rifle Range and Extension. | … | 4,495 | 4,495 |
10. Miniature Rifle Ranges.................. | 96 | 60 | 156 |
11. Grants to Rifle Clubs for Ranges............ | … | 300 | 300 |
12. Minor New Works..................... | 133 | 200 | 333 |
13. Construction of Rifle Ranges.............. | 245 | … | 245 |
14. Miniature Rifle Ranges for Cadets........... | … | 300 | 300 |
Total Tasmania............ | 2,298 | 8,302 | 10,600 |
Total Division No. 3......... | 20,314 | 45,732 | 66,046 |
Under Control of Department of Home Affairs— continued. | “Other.” | ||
Revote. | New Service. | Total. | |
Division No. 4. | |||
POST AND TELEGRAPH. |
|
|
|
Subdivision No. 1. | £ | £ | £ |
NEW SOUTH WALES. |
|
|
|
Additions— |
|
|
|
No. 1. Sundry Offices.................................. | 1,041 | 3,694 | 4,735 |
2. Towards cost alterations of General Post Office, Sydney | … | 7,000 | 7,000a |
New Works— |
|
|
|
No. 3. Alstonville Post Office............................. | 700 | 250 | 950 |
4. Bangalow Post Office............................. | 619 | 80 | 699 |
5. Bellingen Post Office— towards cost................... |
| 400 | 400b |
6. Bondi Post Office............................... | … | 1,300 | 1,300 |
7. Canbelego Post Office— towards cost.................. | … | 400 | 400c |
8. Canterbury Post Office— towards cost.................. | … | 600 | 600d |
9. Cessnock Post Office— towards cost................... | … | 300 | 300e |
10. Coff’s Harbor Post Office —towards cost............... | … | 300 | 300f |
11. Culeairn Post Office............................. | … | 700 | 700 |
12. Curlewis Post Office— towards cost.................. | … | 400 | 400g |
13. Katoomba Post Office— towards cost................. | … | 700 | 700h |
14. Kyogle Post Office.............................. | … | 750 | 750 |
15. Lithgow Post Office— towards cost................... | … | 1,000 | 1,000i |
16. Tingha Post Office—towards cost.................... | … | 400 | 400j |
17. Wahroonga Post Office........................... | … | 1,400 | 1,400 |
18. Ashfield Telephone Exchange—towards cost............ | … | 600 | 600k |
19. North Sydney Telephone Exchange................... | … | 1,800 | 1,800 |
20. Redfern Telephone Exchange — towards construction...... | … | 1,500 | 1,500l |
21. Purchase of Sites............................... | … | 3,000 | 3,000 |
22. Towards the erection of Telephone Exchanges at Mosman, Burwood, Petersham, Glebe, Chatswood, Balmain, Newtown, Randwick, Kogarah, Parramatta, Paddington, Waverley, Edgecliff. William-street | … | 4,000 | 4,000 |
23. Kurri Kurri Post Office........................... | 420 | 50 | 470 |
24. Ryde Post Office............................... | 93 | … | 93 |
25. Mullumbimby Post Office......................... | 749 | … | 749 |
Total New South Wales (carried forward)....... | 3,622 | 30,624 | 34,246 |
a Total cost, £40,000.—b Total cost. £900—c Total cost, £800.—d Total cost, £1,200.—e Total cost, £900, —f Total cost, £900.—g Total cost, £800.—h Total cost, £1,000.—i Total cost, £2,000.—j Total cost, £800.—k Total cost, £1,100.—l Total cost, £2,500.
Under Control of Department of Home Affairs— continued. | “Other.” | ||
Revote. | New Service. | Total. | |
Division No. 4. | £ | £ | £ |
POST AND TELEGRAPH. |
|
|
|
Brought forward........................ | 3,622 | 30,624 | 34,246 |
Subdivision No. 2. |
|
|
|
VICTORIA. |
|
|
|
Additions— |
|
|
|
No. 1. Sundry Offices.................................. | 685 | 1,915 | 2,600 |
2. Sewerage, Sundry Offices | 325 | 443 | 768 |
3. Extension General Post Office, Melbourne............... | 12,426 | 6,574 | 19,000 |
4. Brunswick Post Office............................ | … | 600 | 600 |
5. Koroit Post Office............................... | … | 360 | 360 |
6. Northcote Post Office............................. New Works— | … | 500 | 500 |
7. Beulah Post Office—towards cost..................... | … | 400 | 400* |
8. Canterbury Post Office— towards cost.................. | … | 1,000 | 1,000† |
9. Essendon Post Office, towards construction.............. | … | 1,000 | 1,000‡ |
10. Hawthorn Post Office—towards cost................... | … | 2,000 | 2,000§ |
11. Preston Post Office.............................. | 467 | 233 | 700 |
12. Warracknabeal Post Office......................... | 533 | 24 | 557 |
13. Towards cost Telephone Exchange, Melbourne............ | … | 8,000 | 8,000|| |
14. Windsor Telephone Exchange....................... | … | 6,000 | 6,000 |
15. Construction underground tunnels for Telegraph and Telephone Wires, Melbourne | … | 12,000 | 12,000 |
16. Store, Sturt-street yard, South Melbourne................ | … | 800 | 800 |
17. Purchase of sites................................ | … | 2,000 | 2,000 |
18. Leongatha Post Office............................ | 15 | … | 15 |
Total Victoria............. | 14,451 | 43,849 | 58,300 |
Subdivision No. 3. |
|
|
|
QUEENSLAND. |
|
|
|
Additions— |
|
|
|
No. 1. Sundry Offices.................................. | 418 | 1,215 | 1,633 |
2. Towards extension General Post Office, Brisbane | 5,258 | 11,742 | 17,000¶ |
Carried forward............ | 5,676 | 12,957 | 18,633 |
| 18,073 | 74,473 | 92,546 |
* Total cost, £800. † Total cost, £2,500. ‡ Total cost, £1,500. § Total cost, £4,000.
|| Total cost £19,000. ¶ Total cost, £27,000.
Under Control of Department of Home Affairs — continued,. | “Other.” | ||
Revote. | New Service. | Total. | |
£ | £ | £ | |
Division No. 4. |
|
|
|
POST AND TELEGRAPH. |
|
|
|
Brought forward.................. | 18,073 | 74,473 | 92,546 |
Subdivision No. 3. |
|
|
|
QUEENSLAND. |
|
|
|
Brought forward.................. | 5,676 | 12,957 | 18,633 |
Additions—continued. |
|
|
|
No. 3. Dalby Post Office..................... | … | 365 | 365 |
4. Toowoomba Post Office................ | … | 1,500 | 1,500 |
New Works— |
|
|
|
No. 5. Atherton Post Office................... | 825 | … | 825 |
6. Cairns Post Office.................... | 556 | 10 | 566 |
7. Chillagoe Post Office.................. | … | 900 | 900 |
8. Cloncurry Post Office.................. | … | 1,565 | 1,565 |
9. G-atton Post Office................... | … | 985 | 985 |
10. Irvinebank Post Office................. | 48 | 169 | 217 |
11. Kingaroy Post Office.................. | … | 470 | 470 |
12. Roma Post Office—Towards cost.......... | … | 1,500 | 1,500a |
13. Rockhampton Telephone Exchange........ | … | 900 | 900 |
14. Purchase of Sites..................... | … | 910 | 910 |
15. Mossman Post Office.................. | … | 750 | 750 |
Total Queensland.................. | 7,105 | 22,981 | 30,086 |
Subdivision No. 4. |
|
|
|
SOUTH AUSTRALIA. |
|
|
|
Additions— |
|
|
|
No. 1. Sundry Offices....................... | 312 | 1,300 | 1,612 |
2. Port Pirie Post Office.................. | … | 1,520 | 1,520 |
New Works— |
|
|
|
No. 3. Jamestown Post Office.................. | … | 1,400 | 1,400 |
4. Tumby Bay Post Office................. | … | 945 | 945 |
5. Wallaroo Post Office—Towards cost........ | … | 1,000 | 1,000b |
6. Adelaide Telephone Exchange............. | … | 8,000 | 8,000 |
7. Purchase of sites...................... | … | 500 | 500 |
Total South Australia............... | 312 | 14,665 | 14,977 |
Carried forward................... | 25,490 | 112,119 | 137,609 |
a Total cost, £3,000. b Total cost, £1,700.
Under Control of Department of Home Affairs— continued. | “Other.” | ||
Revote. | New Service. | Total. | |
|
|
| |
| £ | £ | £ |
Division No. 4. |
|
|
|
POST AND TELEGRAPH. |
|
|
|
Brought forward....................... | 25,490 | 112,119 | 137,609 |
Subdivision No. 5. |
|
|
|
WESTERN AUSTRALIA. |
|
|
|
Additions— |
|
|
|
No. 1. Sundry Offices.................................. | 654 | 1,005 | 1,659 |
2. Eucla Post Office......................... | … | 500 | 500 |
3. Store, General Post Office................... | … | 250 | 250 |
New Works— |
|
|
|
No. 4. Beverley Post Office— Towards cost................... | … | 700 | 700a |
5. Collie Post Office........................ | … | 668 | 668 |
6. Derby Post Office............................... | 575 | … | 575 |
7. East Perth Post Office............................. | 500 | 60 | 560 |
8. Fremantle Post Office............................. | … | 427 | 427 |
9. Northam Post Office—Towards cost................... | … | 2,000 | 2,000b |
10. Purchase of sites................................ | … | 900 | 900 |
11. Fitzroy Post Office............................... | 255 | … | 255 |
Total Western Australia....... | 1,984 | 6,510 | 8,494 |
Subdivision No. 6. |
|
|
|
TASMANIA. |
|
|
|
Additions— |
|
|
|
No. 1. Sundry Offices.................................. | 75 | 900 | 975 |
Total Tasmania................................... | 75 | 900 | 975 |
Total Division No. 4............................... | 27,549 | 119,529 | 147,078 |
Total Divisions Nos. 1 to 4........................... | 60,847 | 180.977 | 241,824 |
Less amount which it is anticipated may not be expended during year.. | 241,824 |
| |
20,000 | 20,000 | ||
Total under control of Department of Home Affairs........... | 221,824 | 221,824 | |
a Total cost, £1,200. b Total cost, £2,000.
UNDER CONTROL OF THE POSTMASTER-GENERAL’S DEPARTMENT. | “Other.” |
| |
Division No. 5. |
|
| £ |
TELEGRAPHS AND TELEPHONES. |
|
Subdivision No. 1. |
|
NEW SOUTH WALES. |
|
No. 1. Construction and extension of telegraph lines, instruments, and material. | 20,000 |
2. Construction and extension of telephone lines, instruments, and material, including construction of conduits and placing wires underground | 50,000 |
3. Towards establishment of metallic circuits in connexion with the telephone system | 5,500 |
4. Switch-boards and additional equipment for Central Exchange....... | 16,000 |
5. Towards purchase of telephone lines and instruments held by subscribers under the “Purchase” system | 500 |
6. Towards the establishment of Pneumatic Tube Services............ | 3,000 |
7. New South Wales portion of trunk telephone line between Sydney and Melbourne | 665 |
Subdivision No. 2. | 95,665 |
|
|
VICTORIA. |
|
No. 1. Construction and extension of telegraph lines, instruments, and material. | 20,000 |
2. Construction and extension of telephone lines, instruments, and material, including construction of conduits and placing wires underground | 80,000 |
| 100,000 |
Subdivision No. 3. |
|
QUEENSLAND. |
|
No. 1. Construction and extension of telegraph lines, instruments, and material. | 20,000 |
2. Construction and extension of telephone lines, instruments, and material, including construction of conduits and placing wires underground | 29,000 |
| 49,000 |
Carried forward........................ | 244,665 |
| “Other.” |
Under Control of the Postmaster-General’s Department—continued. | £ |
Division No. 5. |
|
TELEGRAPHS AND TELEPHONES. |
|
Brought forward...................... | 244,665 |
Subdivision No. 4. |
|
SOUTH AUSTRALIA. |
|
No. 1. Construction and extension of telegraph lines, instruments, and material | 9,000 |
2. Construction and extension of telephone lines, instruments, and material, including construction of conduits and placing wires underground | 25,000 |
3. Additional plant required for printing postage stamps, postal notes, and money order forms (re-vote) | 1,302 |
| 35,302 |
Subdivision No. 5. |
|
WESTERN AUSTRALIA. |
|
No. 1. Construction and extension of telegraph lines, instruments, and material | 8,000 |
2. Construction and extension of telephone lines, instruments, and material, including construction of conduits and placing wires underground | 24,000 |
| 32,000 |
Carried forward...................... | 311,967 |
| “Other.” |
| £ |
Under Control of the Postmaster-General’s Department—continued. |
|
Division No. 5. |
|
TELEGRAPHS AND TELEPHONES. |
|
Brought forward.................................. | 311,967 |
Subdivision No. 6. |
|
TASMANIA. |
|
No. 1. Construction and extension of telegraph lines, instruments, and material. | 500 |
2. Construction and extension of telephone lines, instruments, and material, including construction of conduits, and placing wires underground | 23,000 |
3. Metallic Switchboard, Launceston........................... | 2,000 |
| 25,500 |
Subdivision No. 7. |
|
WIRELESS TELEGRAPHY.................................. | 10,000 |
Subdivision No. 8. |
|
SURVEY OF CABLE ROUTE. |
|
No. 1. Survey of route of proposed telegraph cable between Tasmania and the Mainland | 1,000 |
Total Division No. 5...................... | 348,467 |
Less amount which it is anticipated may not be expended during year... | 48,467 |
Total under control of Postmaster-General’s Department........... | 300,000 |
| “Other.” |
UNDER CONTROL OF THE DEPARTMENT OF THE TREASURY. | £ |
Division No. 6. |
|
No. 1. Machinery and plant for Government Printing Office, and works in connexion therewith | 2,000 |
UNDER CONTROL OF DEPARTMENT OF DEFENCE. |
|
Division No. 7. |
|
SPECIAL DEFENCE MATERIAL. |
|
Subdivision No. 1. |
|
Military— |
|
No. 1. Accoutrements and Equipment................................. | 7,000 |
2. Field Artillery—ammunition, waggons, harness and spare parts, and accessories for field guns | 29,000 |
3. Camp equipment.......................................... | 8,000 |
4. Miscellaneous—tools and other materials.......................... | 1,000 |
5. Engineers’ equipment....................................... | 1,000 |
6. Cadet rifles and spare parts.................................... | 10,000 |
7. 25,000 Sword bayonets and scabbards for short M.L.E rifles.............. | 18,750 |
8. Chargers and charger cases for short M.L.E. rifles..................... | 6,250 |
9. M.L.E. rifles, cases, chargers, and spare parts........................ | 20,000 |
10. Medical equipment......................................... | 2,000 |
Naval— |
|
11. Accoutrements for M.L.E. rifles................................ | 500 |
12. Heliographs, sights, aiming tubes, deflection teachers, rifle barrels, &c........ | 160 |
13. Ten Practice torpedoes with gyroscopes, complete.................... | 390 |
| 104,050 |
Less amount which it is anticipated may not be expended during year...... | 24,050 |
Total Division No. 7........................... | 80,000 |
Under Control of Department of Defence—continued. | “Other.” |
£ | |
Division No. 8. |
|
NEW SPECIAL DEFENCE PROVISION: |
|
No. 1. Small arms factory....................................... | 32,000* |
2. Guns, lights, and emplacements for fixed Defences................. | 50,000 |
Total Division No. 8........................ | 82,000 |
UNDER CONTROL OF DEPARTMENT OF EXTERNAL AFFAIRS. |
|
Division No. 9. |
|
No. 1. Towards construction of a building in the Strand, London, for Commonwealth Offices | 1,000 |
Total Additions, New Works, Buildings, &c.................. | 686,824 |
* Total Cost, £65,000.
Printed and Published for the Government of the Commonwealth of Australia by J. Kemp, Acting Government Printer for the State of Victoria.