I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby give notice pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

Woodside Energy Ltd.

(ACN 005 482 986)

 

BHP Petroleum (North West Shelf) Pty Ltd

(ACN 004 514 489)

 

BP Developments Australia Pty. Ltd.

(ACN 081 102 856)

 

Japan Australia LNG (MIMI) Pty. Ltd.

(ACN 006 303 180)

 

Shell Australia Pty Ltd

(ACN 009 663 576)

 

Chevron Australia Pty Ltd

(ACN 086 197 757)

 

 for the variation of Pipeline Licence WA-13-PL in the offshore area of Western Australia, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the
Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–WESTERN AUSTRALIA

OFFSHORE PETROLEUM JOINT AUTHORITY

APPLICATION FOR VARIATION OF

PIPELINE LICENCE WA-13-PL

 

The application seeks to effect the following amendments to the licence:

  1. The ROUTE OF PIPELINE is varied by:

 

a)        deleting the words:

“The route of the pipeline shall be from the Pipeline End Manifold (PLEM) at or about latitude 19⁰ 31’ 27.67”(S), longitude 116⁰ 05’ 52.926”(E) westward to the Goodwyn A Platform at or about latitude 19⁰ 39’ 07.937”(S), longitude 115⁰ 55’ 47.028”(E) within the 500m wide corridor, shown in the licensee’s Drawing Drims# 2020280-v2, dated 18 August 2005, titled ‘Perseus over Goodwyn Project (PoG), Pipeline Route’, attached as annexure ‘A’ (All coordinates referenced to GDA94).”

b)     and replacing with:

 

“The route of the pipeline is from the Pipeline End Manifold (PLEM) to the Goodwyn A Platform within the 100 m wide corridor, as shown in licensee’s Drawing CRN# A1960DU001.0001, last updated 17 April 2020, titled ‘Perseus over Goodwyn Subsea Field Layout’, attached as Attachment 1.

 

Feature

KP

Easting (m)

Northing (m)

Pipeline End Manifold

0

405 366

7 840 904

Production Pipeline (16”) Tie-in Flange

0

405 346

7 840 848

POGP 10” In-Line Tee

6.55

400 565

7 836 812

POGP 16” In-Line Tee

10.039

399 554

7 833 471

Production Riser Base at Goodwyn Platform

24.16

387 795

7 826 652

Coordinates are based on the GDA94 Geodetic datum, MGA Zone 50.

 

2.    The proposed variation to the licence creates a system of pipes which includes the flowlines and spools linking the PER01 and PER03 wells to the Perseus over Goodwyn pipeline.

PER01 Flowline Arrangement

Feature Name

Easting (mE)

Northing (mN)

PER01 Wellhead Centre

398 778

7 837 338

POGP 10” In-Line Tee

400 565

7 836 812

PER01 Flowline Tie-in Flange

398 806

7 837 311

 

PER03 Flowline Arrangement

Feature Name

Easting (mE)

Northing (mN)

PER03 Wellhead Centre

399 588

7 833 444

POGP 16” In-Line Tee

399 554

7 833 471

 

 

 


SCHEDULE – SPECIFICATIONS

 

3.        The Schedule under Specifications, the Basis of Design table is varied by updating the items in bold and italics:

 

Item

Item Description

Details

1

From

Perseus PLEM

2

To

Goodwyn A Platform

3

Outside diameter of pipe and riser

406.4mm

4

Wall thickness of pipe inclusive of riser (only for carbon steel)

21mm + 3mm internal CRA

5

Length

24.20 km

6

Internal Corrosion Allowance

Nil (CRA lined/clad or solid duplex)

7

External Corrosion Allowance

3mm on riser above splash zone

8

Pipeline and Riser Steel Grade

Pipeline – DNV CS450 with CRA liner

Riser and Spools – DNV CS450 with CRA Clad

Bends and Flanges – Duplex Stainless Steel

9

Pipeline Specification

AS2885.4 / DNV-OS-F101

10

Minimum yield strength of pipe steel

450 MPa at 20⁰C

11

Pipeline Design Pressure

8.9 MPag at seabed elevation at 128m (to LAT)

12

Max Allowable Operating Pressure

8.9 MPag at seabed elevation at 128m (to LAT)

13

Normal Operating Pressure

3.9 –8.9 MPag at seabed elevation at 128m (to LAT)

14

Proposed minimum field test pressure

33.0 MPag Max

15

Normal Maximum Inlet Pressure

8.9 MPag at seabed elevation at 128m (to LAT)

16

Normal Minimum Outlet Pressure

3.9 MPag at seabed elevation at 128m (to LAT)

17

Minimum and Maximum Pipeline Design Temperature

Max 95⁰C, min -30⁰C

18

Maximum Riser and Spool Design Temperature

67⁰C

19

Design capacity

Depends on well performance, nominally 540-650 MMscf/d

20

Stabilisation

By increased steel wall thickness

21

External coating specification

FBE adhesive/PP foam installation/PP shield (4 LPP)

22

Field weld joint coating

Compatible with 4LPP

23

Weight coating design and specification

Only for localised stability at pipeline ends. 120m at the PLEM end and 96m at the GWA end. 50mm thick.

24

Characteristics of substance to be conveyed

Hydrocarbons, gas/condensate fluid. Minimum formation water.

25

General plans and descriptions of pump stations, tank stations or valve stations and their equipment

Terminal station declaration proposed at Pipeline End Module (PLEM)

26

General plans and description of pigging facilities

Provision for temporary launching and receiving commissioning pigs will be located at the PLEM and downstream GWA RESDV

27

Design life

33 years

28

The provisions for cathodic protection of the proposed pipeline

Pipeline bracelet anodes

29

Crossings

Nil

30

Marine Growth Allowance

Up to 145mm soft, 12mm hard

31

Location of offtake tees for future use

Upstream of Subsea Isolation Valve

 

4.    The WA-13-PL Pipeline Route Map at Annexure A is deleted and replaced with the map at Attachment 1.

Attachment 1

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.