Application for Variation of a Pipeline Licence - WA-5-PL

Administered by Department of Industry, Science and Resources

Legislation au C2017G00828 In force Gazette

Legislation content

 

 

COMMONWEALTH OF AUSTRALIA

 

Section 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR VARIATION OF A PIPELINE LICENCE

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby give notice pursuant to section 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

 

 

Quadrant Oil Australia Pty Limited

(ABN 63 050 611 688)

 

Quadrant East Spar Pty Limited

(ABN 82 008 674 413)

 

Quadrant Kersail Pty Ltd

(ABN 28 087 029 169)

 

Santos (BOL) Pty Ltd

(ABN 35 000 670 575)

 

 

 

for a variation of Pipeline Licence WA-5-PL in the offshore area of Western Australia, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the Australian Government Gazette.

 

 

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTHWESTERN AUSTRALIA

OFFSHORE PETROLEUM JOINT AUTHORITY


APPLICATION FOR VARIATION OF

PIPELINE LICENCE WA-5-PL

 

Pipeline Co-ordinates

The pipeline commences at the pipeline licence boundary of WA21PL and runs through the East Spar Manifold, a ZSpool, and a 14” Production Pipeline to the pipeline licence boundary of TPL12. Coordinates are based on Geodetic Datum of Australia (GDA94).

 

 

Feature ID

Feature Name

UTM Zone

Easting (mE)

Northing (mN)

1

Boundary of WA21PL and WA5PL

Zone 50

290,101.15

7,707,290.78

2

East Spar Manifold Tiein Flange (Connection to ZSpool Flange)

Zone 50

290,117.00

7,707,292.00

3

14” East Spar Pipeline Flange (Connection to ZSpool Flange)

Zone 50

290,128.92

7,707,316.25

4

Intersection Point (IP) 1

Zone 50

312,897.64

7,710,670.05

5

IP 2

Zone 50

315,961.70

7,711,378.97

6

IP 3

Zone 50

320,430.55

7,712,179.87

7

Boundary of WA5PL and TPL12

Zone 50

330,042.88

7,714,306.54

 

 


Pipeline Design Parameters

 

The pipeline is based on the following parameters:

 

Item

Item Description

Details

 

a)

Outside diameter of pipeline (mm) Nominal wall thickness (mm)

 

Length of pipeline (in WA5PL) (km)

355.6 (14” NB)

15.9 (offshore) / 17.5 (onshore note not applicable in this licence)

40.8 (KP0 KP40.8)

b)

Pipe steel grade

API 5L X65

c)

Pipe specification

ERW (offshore) / seamless (onshore)

d)

Joint type

Butt welded

e)

Minimum yield strength (MPa)

448.32

f)

Design pressure (MPa)

20

g)

Maximum Allowable Operating Pressure (MPa)

20

h)

Field test pressure (MPa)

25

i)

Fittings and valves specification

ANSI Class 1500

j)

Water depth range (m)

25 95 LAT

k)

Corrosion coating

External Field joints

4.5 mm thick (nominal) asphalt enamel Bituminous tape wrap

 

l)

 

Weight coating

KP0KP23 KP23KP30 KP30KP63

30 mm thick reinforced concrete, 2400 S 90 mm thick reinforced concrete, 3040 S 30 mm thick reinforced concrete, 3040 S

m)

Cathodic Protection

Sacrificial Aluminium Anodes

n)

Maximum inlet temperature (˚C)

69

o)

Minimum operating temperature (˚C)

16

 

 

p)

Substance to be conveyed: Maximum CO2 content (%Vol) Maximum     Water content (mg/m3) Maximum hydrogen sulphide (mg/m3) Maximum sulphur (mg/m3)

Corrosion inhibited 3phase wellstream

2.0 Mole % 7,000

2

2

 

q)

 

Pipeline specific gravity

KP0KP23 KP23KP30 KP30KP63

1.6

2.3

1.8

r)

Maximum allowable free span (m)

21.0m (Kp 1621) to 30.3m (Kp 2123)

s)

Design Capacity (Sm3/day at 15.6˚C & 1 atm)

6.63×106

t)

Erosional velocity (m/s)

14.6 (Actual 4.2 m/s at 2.83x106)

 

u)

Design Environmental criteria. Marine growth allowance.

50 yearreturn cyclonic condition.    30mm hard growth, soft growth assumed removed in storm conditions.

v)

Stabilisation

Refer attached ES14DX00020

w)

Thermal Offsets

25m adjacent to the manifold

x)

Corrosion allowance (mm)

4.9 (internal) Nil (external)

 

 

y)

General plans and descriptions of pump stations, tank stations or valve stations and their equipment

Subsea:

Pipeline licence includes East Spar Manifold. All manifold piping and valves manufactured from corrosion resistant alloy (duplex) suitable for the produced fluids.

 

 

Manifold piping sized to match the pipeline and designed in accordance with API 6A. Piping and valves are interconnected by means of flanges or hubs/clamps.

Support structure designed in accordance with API RP 2A. Free standing and supported by mudmats.

 

LastOff Valve Replacement Spool (Replacing Valve LOV2010)

14” Linepipe (355.6 mm OD, 1276mm Length, 15.9 mm WT)

Material:  API5LX65 Test Pressure 38MPa

 

Onshore:

Pipeline provided with pipeline isolation valve and emergency shutdown valves.

 

 

z)

East Spar Manifold / Pipeline Tiein Spool

14” Line pipe (355.6 mm OD, 37.2m Length, 15.9 mm WT)

Material:  API5LX65 Test Pressure: 25MPa

 

aa)

Generals plans and description of pigging facilities

No permanent facilities installed.

 

Temporary subsea pig launch and onshore receipt facilities fabricated as required.

 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.