Application for Variation of a Pipeline Licence WA-30-PL (Spartan to John Brookes Pipeline)

Administered by Department of Industry, Science and Resources

Legislation au C2023G00072 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR VARIATION OF A PIPELINE LICENCE WA-30-PL

(SPARTAN TO JOHN BROOKES PIPELINE)

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby give notice pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

Santos WA Southwest Pty Limited

(ACN 050 611 688)

 

Santos (BOL) Pty Ltd

(ACN 000 670  575)

 

 for the variation of Pipeline Licence WA-30-PL in the offshore area of Western Australia, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the
Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–WESTERN AUSTRALIA

OFFSHORE PETROLEUM JOINT AUTHORITY

 

 


APPLICATION FOR VARIATION OF

PIPELINE LICENCE WA-30-PL

 

The application seeks to effect the following amendments to the licence:

  1. The ROUTE OF THE PIPELINE is varied by deleting all the current text and replacing with the following:

“The pipeline route is described in the table hereunder and displayed in the attached map (Attachment A), commencing at the diverless connector on the gooseneck assembly downstream of the Spartan XT hub to the upstream flange on end of flexible at interface to topside shut down flange on the John Brookes Platform.

Feature ID

Feature Name

KP

Easting

(mE)

Northing

(mN)

Bend

Radius

1

Diverless connector on the gooseneck assembly downstream of the Spartan XT hub

 

317 286.15

7 728 372.41

 

2

TP1A

0.120

317 166.15

7 728 372.41

 

3

IP1

 

317 135.72

7 728 372.41

150

4

TP1B

0.180

317 107.69

7 728 360.55

 

5

IP2

 

316 648.23

7 728 166.13

150

6

TP1C

0.564

316 924.29

7 728 581.69

 

7

IP3

 

316 991.83

7 728 683.36

150

8

TP1D

0.769

316 906.01

7 728 770.16

 

9

TP2A

1.010

316 736.55

7 728 941.55

 

10

IP4

 

316 680.18

7 728 998.56

150

11

TP2B

1.157

316 601.47

7 728 983.39

 

12

IP5

 

316 303.18

7 728 925.88

203

13

TB2C

1.555

316 364.18

7 729 223.48

 

14

IP6

 

316 380.27

7 729 302.01

150

15

TP2D

1.703

316 323.92

7 729 359.04

 

16

TP3A

4.418

314 605.87

7 731 093.11

 

17

IP7

 

314 525.90

7 731 173.83

1000

18

TP3B

4.374

314 430.15

7 731 234.44

 

19

TP4A

14.137

306 186.38

7 736 453.01

 

20

IP8

 

306 010.15

7 736 564.57

1130

21

TP4B

14.550

305 885.36

7 736 731.68

 

22

TP5A

15.241

305 472.80

7 737 284.16

 

23

IP9

 

305 186.66

7 737 667.36

1200

24

TP5B

16.152

304 715.38

7 737 748.69

 

25

Upstream flange on end of flexible at interface to topside shut down flange on the John Brookes Platform

17.0

303 895.34

7 737 890.25

 

Coordinates are based on the GDA94 Geodetic datum, MGA Zone 50

SPECIFICATIONS

 

2.      The Schedule under Specifications, the Basis of Design table is varied by updating the items in bold and italics:

 

Basis of Design

 

The pipeline design is based on the following parameters:

 

Item

Item Description

Details

1

Outside diameter of pipe and riser

 

XT Connector (Gooseneck Pipe): 7.38” (187.5 mm)

HOT Section: 263.92 mm

MID/COLD Sections: 264.51 mm

2

Wall thickness of pipe inclusive of riser (only for carbon steel)

XT Connector: Gooseneck Pipe 1” (25.4 mm)

Internal Cladding Inconel 625, 0.125” (3.2 mm) min thickness

HOT Section: 30.36 mm

MID/COLD Sections: 30.66 mm

3

Length

16.7 km (approximate)

4

Design life

20 years (approximate)

5

Pipeline Material

Flexible steel

6

Pipeline and Riser Steel Grade

XT Connector – Gooseneck Pipe: Steel API 5L X70

HOT/MID/COLD Section Carcass Material: Duplex Stainless Steel

7

Pipeline Specification

 

XT Connector – Gooseneck Pipe: API 5L X70

HOT/MID/COLD Sections: Duplex Stainless Steel carcass

8

Minimum yield strength of pipe steel

XT Connector – Gooseneck Pipe: 70 ksi

HOT/MID/COLD Section: N/A

9

Maximum Allowable Operating Pressure

22.5 MPa

10

Design Capacity

118 MMscf/d

11

Minimum/ Maximum Design Temperature

 

XT Connector

(Gooseneck & Connector)

HOT Section

MID Section

COLD Section

Min: -18 °C

Min: -18 °C

Min: -30 °C

Min: -30 °C

Max: 121 °C

Max: 120 °C

Max: 90 °C

Max: 60 °C

 

 

12

Operating Temperature

Maximum: 115 °C

Minimum: 0 °C

13

Characteristics of substance proposed to be conveyed

The production fluid is a combination of gas, condensate and water.

13

General plans and descriptions of pump stations, tank stations or valve stations and their equipment

N/A

14

General plans and description of pigging facilities

N/A

15

Cathodic protection

Cathodic protection at XT Connector provided by XT. Bracelet anodes at each midline connection and end connections.

16

Stabilisation

Concrete stabilisation mattresses

3.        The WA-30-PL Pipeline Route Map at Annexure A is deleted and replaced with the map at Attachment 1.

Attachment 1

Overview

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 was enacted to provide a framework for the regulation of offshore petroleum and greenhouse gas storage activities in Australia. This legislation addresses the need for effective management and oversight of offshore petroleum operations to ensure environmental protection, safety, and efficient resource use. The Act was introduced by the Parliament of Australia and aims to balance the interests of industry, environmental protection, and the public. The Act includes provisions for licensing, environmental assessment, and compliance to ensure that offshore activities are conducted in a manner that minimises adverse environmental impacts and promotes sustainable development. This notice of an application for variation of a pipeline licence under the Act demonstrates the ongoing regulatory oversight necessary to adapt to changes in operational requirements and technological advancements. Interested parties have the opportunity to submit written submissions to the Titles Administrator within 30 days of the notice, allowing for public participation in the regulatory process.

Scope and Application

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 applies to the proposed variation of the Pipeline Licence WA-30-PL, which is administered by the National Offshore Petroleum Titles Administrator on behalf of the Commonwealth-Western Australia Offshore Petroleum Joint Authority. The application for variation pertains specifically to the pipeline licence held by Santos WA Southwest Pty Limited and Santos (BOL) Pty Ltd, seeking to amend the pipeline route from the Spartan XT hub to the John Brookes Platform in the offshore area of Western Australia. The scope of this Act extends to the regulation of offshore petroleum activities, including the licensing of pipelines for the transport of petroleum products in the offshore area. The application must adhere to the Act's provisions, including environmental and safety standards, and may be subject to review and approval by the Titles Administrator. The Act's jurisdictional reach is confined to the offshore area of Western Australia, where the pipeline is located. Any exclusions, exemptions, or thresholds are not explicitly detailed in this notice, but the application process under the Act may involve additional scrutiny and requirements as stipulated in the Act and any subordinate legislation.

Key Provisions

The application under sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 seeks a variation to Pipeline Licence WA-30-PL, which pertains to the offshore area of Western Australia. Specifically, the application proposes changes to the pipeline route and the basis of design, including details such as the outside diameter of the pipe and riser, wall thickness, length, design life, and the material specifications. The pipeline in question is intended to convey a mixture of gas, condensate, and water. The new pipeline route will start at the diverless connector on the gooseneck assembly downstream of the Spartan XT hub and terminate at the upstream flange on the end of the flexible at the interface to the topside shut down flange on the John Brookes Platform. The updated specifications detail the dimensions, materials, and operational parameters for the pipeline, such as the minimum and maximum design temperatures and the maximum allowable operating pressure. The parties or entities governed by the Act must adhere to the detailed requirements specified in the application. This includes providing accurate and comprehensive information about the proposed changes to the pipeline route and design specifications. The applicants must also ensure that the proposed pipeline design complies with all relevant safety, environmental, and operational standards set forth in the Act. Additionally, any changes to the pipeline route or design must be approved by the Titles Administrator to ensure they do not conflict with existing infrastructure or other offshore activities. Failure to comply with the requirements of the Act or the terms of the pipeline licence can result in various penalties and consequences. While the specific penalties for breach are not detailed in the text, the Act generally provides for both civil and criminal penalties for non-compliance. Civil penalties can include fines, and in severe cases, criminal penalties may apply, which could result in imprisonment. The maximum penalties would depend on the severity and nature of the breach, but they could be significant given the critical nature of offshore petroleum activities. Additionally, any variation to the pipeline licence must be approved by the Titles Administrator, and any unauthorised changes could lead to enforcement actions.

Legal classification tags

Area of Law
Environmental Law
Commercial Law
Instrument
Gazette Notice
Concepts
Definitions & Interpretation
Reporting & Disclosure Obligations
Compliance Obligations
Enforcement Powers

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.