Application for Variation of a Pipeline Licence - WA-28-PL

Administered by Department of Industry, Science and Resources

Legislation au C2018G00131 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR VARIATION OF A PIPELINE LICENCE

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority, hereby give notice pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

Woodside Energy Ltd.

(ABN 63 005 482 986)

 

Mitsui E&P Australia Pty Ltd

(ACN 108 437 529)

 

 for the variation of Pipeline Licence WA-28-PL in the offshore area of Western Australia, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTHWESTERN AUSTRALIA

OFFSHORE PETROLEUM JOINT AUTHORITY

 


APPLICATION FOR VARIATION OF

PIPELINE LICENCE WA-28-PL

 

ROUTE OF THE PIPELINE

 

The route of the system of pipes is described in the table hereunder and displayed in the attached map (Attachment 1), commencing at the tie-in flange to the Laverda high boost multiphase pump (MPP) station and ending at the tie-in flange to the Remote Emergency Shutdown Valve (RESDV) at the Ngujima Yin FPSO. Coordinates are based on Geodetic Datum of Australia (GDA94).

 

16” Rigid Production Pipeline

 

POINT DESCRIPTION

KP (km)

Easting (m) - MGA50

Northing (m) - MGA50

Bend Radius

1

Start Point: TIE IN FLANGE TO MPP/11" FLEXIBLE START

-

173 121

7617047

 

2

11" FLEXIBLE END

-

173 042

7 617 094

 

3

CENTRE OF LAVERDA FLET

-

173 040

7 617 095

 

4

START OF 16” RIGID PIPELINE

0.000

173 049

7 617 099

 

5

TANGENT POINT (TP) 1

2.910

175 772

7 618 124

 

3100

6

INTERSECTION POINT (IP) 1

-

176 891

7 618 545

7

TP 2

5.191

177 437

7 619 608

8

TP 3

9.346

179 337

7 623 303

 

3100

9

IP 2

-

179 931

7 624 460

10

TP 4

11.809

181 173

7 624 846

11

CENTRE OF CIMATTI ILTA

16.237

185 402

7 626 161

-

12

TP 5

16.689

185 833

7 626 295

 

3100

13

IP 3

-

186 442

7 626 485

14

TP 6

17.947

186 927

7 626 899

15

TP 7

20.051

188 527

7 628 266

 

2550

16

IP 4

-

189 222

7 628 860

17

TP 8

21.807

190 135

7 628 878

18

TP 9

26.356

194 684

7 628 963

 

2550

19

IP 5

-

195 393

7 628 977

20

TP 10

27.740

196 007

7 628 622

21

16” RIGID PIPELINE END POINT

28.555

196 713

7 628 215

-

22

CENTRE OF NGY FLET

-

196 723

7 628 209

-

23

14" FLEXIBLE FLOWLINE START POINT

-

196 721

7 628 209

-

24

14" FLEXIBLE FLOWLINE END POINT

-

196 265

7 627 473

-

25

10" FLEXIBLE
RISER START POINT

-

196 265

7 627 473

-

26

10" FLEXIBLE RISER END POINT

-

195 974

7 626 968

-

27

END POINT: TIE IN FLANGE TO RESDV AT NGY FPSO

-

195 974

7 626 968

-

 

Overview

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 was enacted to provide a regulatory framework for offshore petroleum exploration, production, and storage activities in Australia. The Act was introduced to address the need for comprehensive legislation governing offshore petroleum operations, ensuring environmental protection, safety, and efficient management of resources. The Act is administered by the Commonwealth of Australia, specifically the National Offshore Petroleum Titles Administrator, who is responsible for the regulation and oversight of offshore petroleum activities. The policy objective of the Act is to facilitate the development of offshore petroleum resources while ensuring the protection of the marine environment and the safety of operations. This legislation serves as the primary legal instrument for managing the offshore petroleum industry in Australia, addressing both the operational and environmental aspects of offshore activities. It provides for the licensing of activities, the management of environmental risks, and the resolution of disputes related to offshore petroleum operations. The Act establishes a clear framework for the regulation of offshore petroleum activities, ensuring that they are conducted in a manner that is safe, environmentally responsible, and economically viable.

Scope and Application

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 applies to entities and individuals involved in the offshore petroleum and greenhouse gas storage industries within Australia. Specifically, the Act governs the operations and licensing of entities such as Woodside Energy Ltd. and Mitsui E&P Australia Pty Ltd, who have applied for variations to their pipeline licence. The legislation's jurisdictional reach extends to the offshore area of Western Australia, where the proposed pipeline route is situated. This includes the submission process for variations as outlined in sections 226 and 708 of the Act, allowing interested parties to provide written submissions within a specified period. The Act also provides for the extension or restriction of its application through subordinate instruments, ensuring flexibility in the administration of offshore petroleum activities. The notice of application for the variation of Pipeline Licence WA-28-PL, which outlines the proposed changes to the pipeline route, is subject to the statutory requirements and public notification processes stipulated in the Act.

Key Provisions

The primary sections of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 relevant to this notice (sections 226 and 708) allow for the application process for the variation of a pipeline licence. Section 226(3) provides that a written submission can be made by any person regarding an application for a variation of a pipeline licence within 30 days from the date of the notice. This notice informs the public and relevant stakeholders about the application by Woodside Energy Ltd and Mitsui E&P Australia Pty Ltd for a variation to Pipeline Licence WA-28-PL. The application details the intended route of the pipeline, starting from the Laverda high boost multiphase pump station and ending at the Remote Emergency Shutdown Valve (RESDV) at the Ngujima Yin FPSO. The Act imposes several obligations on the applicants, Woodside Energy Ltd and Mitsui E&P Australia Pty Ltd. They must ensure that their application for the pipeline variation is detailed and accurate, providing all necessary technical information and maps as required. This includes the exact route and specifications of the pipeline, as well as any environmental and safety considerations. Additionally, the applicants must make their application available for public inspection and allow for any submissions within the stipulated 30-day period. The National Offshore Petroleum Titles Administrator is responsible for overseeing this process and ensuring compliance with the Act. Failure to comply with the provisions of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 can result in various penalties and consequences. The Act does not specify particular penalties for non-compliance with the application process outlined in sections 226 and 708; however, general provisions within the Act could lead to administrative sanctions, fines, or even the revocation of the pipeline licence. For more severe breaches of other sections of the Act, the penalties can include substantial fines and imprisonment terms. The maximum penalties vary depending on the specific provisions breached but can be significant given the environmental and safety implications of offshore petroleum activities.

Legal classification tags

Area of Law
Environmental Law
Energy & Resources Law
Instrument
Gazette Notice
Concepts
Definitions & Interpretation