COMMONWEALTH OF AUSTRALIA
Section 708
Offshore Petroleum and Greenhouse Gas Storage Act 2006
APPLICATION FOR VARIATION OF A PIPELINE LICENCE
I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority, hereby give notice pursuant to section 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 (the Act) that an application has been received from
Woodside Energy Julimar Pty Ltd
(ABN 56 130 391 365)
Kufpec Australia (Julimar) Pty Ltd
(ABN 38 139 500 502)
for the variation of a Petroleum Pipeline Licence WA-26-PL in the offshore area of Western Australia, as set out below.
Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.
This notice takes effect on the day on which it appears in the Australian Government Gazette.
Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia.
GRAEME ALBERT WATERS
TITLES ADMINISTRATOR
ON BEHALF OF THE COMMONWEALTH-WESTERN AUSTRALIA
OFFSHORE PETROLEUM JOINT AUTHORITY
APPLICATION FOR A VARIATION OF
PETROLEUM PIPELINE LICENCE WA-26-PL
Julimar-Brunello Pipeline
Pipeline Route Map
Pipeline Co-ordinates
BRUA Manifold |
| |||
Feature ID | Feature Description | Easting | Northing | Current Status |
1.0 | BRUA Manifold – Centre | 311 922.35 | 7 784 154.66 | Design |
BRUA Crossover Manifold |
| |||
Feature ID | Feature Description | Easting | Northing | Current Status |
2.0 | BRUA Crossover Manifold - Centre | 311 986.91 | 7 784 092.84 | Design |
Brunello Production Pipeline |
| |||
Feature ID | Feature Description (Note 1) | Easting | Northing | Current Status |
3.0 | Production FLET | 312 054.23 | 7 784 093.32 | As built |
3.1 | Displacement Initiator CRB B01 | 312 743.96 | 7 784 490.57 | As built |
3.2 | Displacement Initiator CRB B02 | 313 415.79 | 7 784 925.59 | As built |
3.3 | Displacement Initiator CRB B03 | 314 223.88 | 7 785 514.17 | As built |
3.4 | Displacement Initiator CRB B04 | 315 072.65 | 7 786 044.29 | As built |
3.5 | Displacement Initiator CRB B05 | 315 869.37 | 7 786 657.01 | As built |
3.6 | Displacement Initiator CRB B06 | 316 705.58 | 7 787 213.49 | As built |
3.7 | Displacement Initiator CRB B07 | 317 526.58 | 7 787 871.41 | As built |
3.8 | Displacement Initiator CRB B08 | 318 281.73 | 7 788 605.79 | As built |
3.9 | Displacement Initiator CRB B09 | 319 057.18 | 7 789 237.27 | As built |
3.10 | Displacement Initiator CRB B10 | 319 772.35 | 7 789 930.98 | As built |
3.11 | Displacement Initiator CRB B11 | 320 406.43 | 7 790 638.49 | As built |
3.12 | Displacement Initiator CRB B12 | 321 195.69 | 7 791 250.77 | As built |
3.13 | Displacement Initiator CRB B13 | 321 996.87 | 7 791 662.99 | As built |
3.14 | Displacement Initiator CRB B14 | 322 835.04 | 7 791 990.54 | As built |
3.15 | Displacement Initiator CRB B15 | 323810.60 | 7 792 256.11 | As built |
3.16 | Displacement Initiator CRB B16 | 324 896.68 | 7 792 432.76 | As built |
3.17 | Displacement Initiator CRB B17 | 325 963.04 | 7 792 630.54 | As built |
3.18 | Displacement Initiator CRB B18 | 326 815.06 | 7 792 927.64 | As built |
3.19 | Displacement Initiator CRB B19 | 327 862.16 | 7 793 205.29 | As built |
3.20 | Displacement Initiator CRB B20 | 328 822.21 | 7 793 749.46 | As built |
3.21 | Displacement Initiator CRB B21 | 329 387.94 | 7 794 389.74 | As built |
3.22 | Displacement Initiator CRB B22 | 329 948.20 | 7 794 969.56 | As built |
3.23 | Flowline Tie-in Flange | 330 692.49 | 7 795 596.57 | As built |
3.24 | Wheatstone Platform JDP SSIV (centre) | 330 760.87 | 7 795 574.98 | As built |
Julimar Production Pipeline |
| |||
Feature ID | Feature Description (Note 1) | Easting | Northing | Current Status |
4.0 | Production FLET | 312 052.92 | 7 784 073.31 | As built |
4.1 | Displacement Initiator CRB J01 | 312 741.76 | 7 784 452.14 | As built |
4.2 | Displacement Initiator CRB J02 | 313 422.51 | 7 784 874.40 | As built |
4.3 | Displacement Initiator CRB J03 | 314 230.70 | 7 785 463.80 | As built |
4.4 | Displacement Initiator CRB J04 | 315 079.08 | 7 785 992.31 | As built |
4.5 | Displacement Initiator CRB J05 | 315 874.78 | 7 786 605.64 | As built |
4.6 | Displacement Initiator CRB J06 | 316 712.06 | 7 787 161.41 | As built |
4.7 | Displacement Initiator CRB J07 | 317 535.21 | 7 787 819.61 | As built |
4.8 | Displacement Initiator CRB J08 | 318 292.87 | 7 788 552.00 | As built |
4.9 | Displacement Initiator CRB J09 | 319 104.13 | 7 789 218.09 | As built |
4.10 | Displacement Initiator CRB J10 | 319 816.99 | 7 789 912.07 | As built |
4.11 | Displacement Initiator CRB J11 | 320 424.03 | 7 790 587.95 | As built |
4.12 | Displacement Initiator CRB J12 | 321 200.01 | 7 791 188.77 | As built |
4.13 | Displacement Initiator CRB J13 | 322 043.95 | 7 791 625.08 | As built |
4.14 | Displacement Initiator CRB J14 | 322 811.57 | 7 791 925.33 | As built |
4.15 | Displacement Initiator CRB J15 | 323 833.33 | 7 792 206.02 | As built |
4.16 | Displacement Initiator CRB J16 | 324 921.34 | 7 792 385.50 | As built |
4.17 | Displacement Initiator CRB J17 | 325 958.14 | 7 792 569.44 | As built |
4.18 | Displacement Initiator CRB J18 | 326 852.13 | 7 792 890.68 | As built |
4.19 | Displacement Initiator CRB J19 | 327 892.60 | 7 793 182.78 | As built |
4.20 | Displacement Initiator CRB J20 | 328 829.17 | 7 793 707.76 | As built |
4.21 | Displacement Initiator CRB J21 | 329 430.72 | 7 794 387.47 | As built |
4.22 | Displacement Initiator CRB J22 | 329 985.69 | 7 794 965.38 | As built |
4.23 | Flowline Tie-in Flange | 330 695.05 | 7 795 583.35 | As built |
4.24 | Wheatstone Platform JDP SSIV (centre) | 330 760.87 | 7 795 574.98 | As built |
Wheatstone Platform | ||||
Feature ID | Feature Description | Easting | Northing | Current Status |
5.1 | Wheatstone Platform Centre | 330 862.0 | 7 795 521.3 | As built |
Notes: 1) Between the FLET and the tie-in flange, the flowline has been installed around the displacement initiator structures; which provides fixed points of reference along the route.
| ||||
Pipeline Design Temperatures
- Maximum design temperature: 133°C
- Minimum design temperature: -20°C