COMMONWEALTH OF AUSTRALIA
Section 708
Offshore Petroleum and Greenhouse Gas Storage Act 2006
APPLICATION FOR VARIATION OF A PIPELINE LICENCE
I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority hereby give notice pursuant to section 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from
Esso Australia Resources Pty Ltd
(ABN 62 091 829 819)
BHP Billiton Petroleum (Bass Strait) Pty. Ltd.
(ABN 29 004 228 004)
for a variation of Pipeline Licence VIC/PL10 in the offshore area of Victoria, as set out below.
Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.
This notice takes effect on the day on which it appears in the Australian Government Gazette.
Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia.
GRAEME ALBERT WATERS
TITLES ADMINISTRATOR
ON BEHALF OF THE COMMONWEALTH–VICTORIA
OFFSHORE PETROLEUM JOINT AUTHORITY
APPLICATION FOR VARIATION OF
PIPELINE LICENCE VIC/PL10
The application seeks to effect the following administrative amendments to the licence:
Pipeline Duration, Interpretation and Conditions
- Vary the duration of the licence from a fixed term to an indefinite term to reflect legislative amendment.
- Where possible, remove references in the licence to the former Designated Authorities or the ‘said Director’.
Route of the Pipeline
3. Add the As-Constructed Pipeline Co-ordinates.
4. Add the Route Map.
Specifications and Further Conditions
5. Update the pipeline design details and parameters, including reference to relevant Australian Standards, to reflect the as-constructed Tuna to Marlin 200m Oil Pipeline.
6. Delete conditions relating to pipeline specifications, performance, reporting and approval requirements that are no longer required or have been superseded under the current regulatory regime (and are regulated by the National Offshore Petroleum Safety and Environmental Management Authority).
As-Constructed Pipeline Co-ordinates
The route of the Tuna to Marlin 200mm Oil Pipeline is described in the table below, commencing at the pig launcher on the Tuna A platform, proceeding in a straight line with some minor deflections and terminating at the pig receiver on the Marlin A platform. Coordinates are based on Geodetic Datum of Australia (GDA94).
ID | DESCRIPTION | EASTING | NORTHING |
0 | Launcher at Tuna A Platform (Start Point) | 624333 | 5774382 |
1 | Riser at Tuna A Platform | 624334 | 5774390 |
C1 | Crossing at VIC/PL28 (WTN250) | 624324 | 5774390 |
C2 | Crossing at VIC/PL40 (WTN450) | 616351 | 5771450 |
2 | Deflection point | 610492 | 5769354 |
3 | Deflection point | 609847 | 5769009 |
C3 | Crossing at VIC/PL45 (HLA600) | 607743 | 5768275 |
4 | Deflection point | 606962 | 5767944 |
5 | Deflection point | 606899 | 5767910 |
6 | Deflection point | 606882 | 5767903 |
7 | Riser at Marlin A Platform | 606873 | 5767905 |
8 | Receiver at Marlin A Platform (End Point) | 606862 | 5767902 |
Coordinate set above is based on GDA94 / MGA Zone 55, survey of pipeline centreline.