Application for Variation of a Pipeline Licence - Pipeline Licence WA-27-PL (TV8S9S)

Administered by Department of Industry, Science and Resources

Legislation au C2024G00774 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR VARIATION OF A PIPELINE LICENCE - PIPELINE LICENCE WA-27-PL (TV8S9S)

 

I, HEATH SAMUEL SHEPHERDSON, Delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby give notice pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

Woodside Energy (North West Shelf) Pty Ltd

(ACN 004 514 489)

 

BP Developments Australia Pty. Ltd.

(ACN 081 102 856)

 

Chevron Australia Pty Ltd  

(ACN 086 197 757)

 

Woodside Energy Ltd.

(ACN 005 482 986)

 

Japan Australia LNG (MIMI) Pty. Ltd.

(ACN 006 303 180)

 

Shell Australia Pty Ltd

(ACN 009 663 576)

 

for the variation of Pipeline Licence WA-27-PL in the offshore area of Western Australia, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the
Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

HEATH SAMUEL SHEPERDSON

DELEGATE OF THE TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–WESTERN AUSTRALIA OFFSHORE PETROLEUM JOINT AUTHORITY


APPLICATION FOR VARIATION OF

PIPELINE LICENCE WA-27-PL

 

The application seeks to affect the following amendments to the licence:

 

  1.       The Route of the Pipeline is varied by adding the following tables of coordinates and text detailing the route of the GWF-4 Echo Yodel system of pipes:

 

Table 1. Coordinates from the Yodel Updip well (YOD05) Xmas tree to the Echo Yodel (EYA) Manifold Flowline

 

YOD05 Xmas tree to EYA Manifold Flowline

Feature Name

Easting (mE)

Northing (mN)

Bend radius (m)

YOD05 Xmas Tree Hub Face

366 843

7 815 548

 

TP1A

367 431

7 815 279

 

IP1

367 530

7 815 234

500

TP1B

367 639

7 815 234

 

TP2A

369 889

7 815 234

 

IP2

369 904

7 815 234

30

TP2B

369 913

7 815 223

 

EYA Manifold Hub Face

369 931

7 815 199

 

 

Table 2. Coordinates from the Echo Spur Well (ESA01) Xmas Tree to the EYA Manifold Flowline

 

ESA01 Xmas Tree to EYA Manifold Flowline

Feature Name

Easting (mE)

Northing (mN)

Bend radius (m)

ESA01 Xmas Tree Hub Face

369 840

7 815 083

 

TP3A

369 836

7 815 103

 

IP3

369 834

7 815 117

25

TP3B

369 845

7 815 127

 

EYA Manifold Hub Face

369 932

7 815 195

 

 

Table 3. Coordinates from the EYA Manifold to the Keast Dockrell (KDA) Manifold Flowline

 

EYA Manifold to KDA Manifold Flowline

Feature Name

Easting (mE)

Northing (mN)

Bend radius (m)

EYA Manifold Hub Face

369 935

7 815 194

 

TP4A

369 984

7 815 133

 

IP4

370 011

7 815 100

150

TP4B

370 050

7 815 086

 

TP5A

371 156

7 814 681

 

IP5

371 199

7 814 665

200

TP5B

371 244

7 814 669

 

TP6A

372 265

7 814 767

 

IP6

372 274

7 814 768

30

TP6B

372 282

7 814 763

 

TP7A

372 378

7 814 712

 

IP7

372 457

7 814 670

150

TP7B

372 532

7 814 719

 

KDA Manifold Hub Face

372 747

7 814 862

 

 

Coordinate sets above have an installation corridor of ±100m to allow for minor route deviations and loss loops of the flexible flowlines.

 

  1.       Under Specifications, “Design and Construction” is varied by adding the following table:

 

Table 4: Key design standards for the Echo Yodel Flexible Flowlines and EYA Manifold

 

Standard

Title

API 17B

Recommended Practice for Flexible Pipe

API 17J

Specification for Unbonded Flexible Pipe

API 17L1

Specification for Unbonded Flexible Pipe Ancillary Equipment

API 17L2

Recommended Practice for Flexible Pipe Ancillary Equipment

API 17P

Recommended Practice for Subsea Structures and Manifolds

 

  1.       Under Specifications, “Basis of Design” is varied by adding the following tables:

 

Table 5: Key design parameters for YOD05 to EYA Flexible Flowline

 

Item

Item Description

Details

1

Internal diameter

10 Inches

2

Design capacity

180 MMscf/d

3

Maximum allowable operating pressure

34.5 MPa(a)

4

Maximum design temperature

110°C

5

Maximum operating temperature

104°C

6

Minimum design temperature

-29°C

7

Design life

15 Years

 

Table 6: Key design parameters for ESA01 to EYA Flexible Flowline

 

Item

Item Description

Details

1

Internal diameter

8 Inches

2

Design capacity

120 MMscf/d

3

Maximum allowable operating pressure

34.5 MPa(a)

4

Maximum design temperature

110°C

5

Maximum operating temperature

104°C

6

Minimum design temperature

-29°C

7

Design life

15 Years

 

Table 7: Key design parameters for EYA to KDA Flexible Flowline

 

Item

Item Description

Details

1

Internal diameter

10 Inches

2

Design capacity

300 MMscf/d

3

Maximum allowable operating pressure

34.5 MPa(a)

4

Maximum design temperature

110°C

5

Maximum operating temperature

104°C

6

Minimum design temperature

-29°C

7

Design life

15 Years

 

 

 

Table 8: Key design parameters for EYA Manifold

 

Item

Item Description

Details

1

Internal diameter header

10 Inches

2

Internal diameter branches

7 Inches

3

Number of headers / branches

1 / 2

4

Maximum allowable operating pressure

34.5 MPa(a)

5

Maximum design temperature

110°C

6

Maximum operating temperature

104°C

7

Minimum design temperature

-18°C

8

Material Class

HH Trim

9

Design life

15 Years

 

 

The existing ROUTE OF THE PIPELINE and SPECIFICATIONS of the Greater Western Flank-2 (GWF-2) system of pipes within Pipeline Licence WA-27-PL remains as stated in the licence instrument dated 6 October 2016 and as varied 1 September 2017.

 

  1.       The GWF-2 Route Map on page 6 is deleted and replaced with the map at Attachment 1.

 

 


       

Attachment 1