COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR VARIATION OF A PIPELINE LICENCE

(PIPELINE LICENCE WA-11-PL)

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby give notice pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

Santos WA Northwest Pty Ltd

(ACN 009 140 854)

 

Santos (BOL) Pty Ltd

(ACN 000 670 575)

 

 for the variation of Pipeline Licence WA-11-PL in the offshore area of Western Australia, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the
Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

 

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–WESTERN AUSTRALIA

OFFSHORE PETROLEUM JOINT AUTHORITY

 

 


APPLICATION FOR VARIATION OF

PIPELINE LICENCE WA-11-PL

 

The application seeks to effect the following amendments to the licence:

 

  1. The Schedule under Specifications, the Basis of Design table is varied by updating the items in bold and italics:

 

(B) Basis of Design

 

The pipeline design is based on the following parameters:

 

Item

Item Description

Details

1

Outside diameter of pipe and riser

457.2 mm (18 in)

2

Wall thickness of pipe inclusive of riser (only for carbon steel)

15.9 mm (0.6 in) (KP21.2 to KP48.1 and pipeline riser);

17.5 mm (0.7 in) (KP48.1 to KP53.9);

15.9 mm (0.6 in) (KP53.9 to KP54.4) pipeline repair spools

3

Length

33.2 km (approximate)

4

Design life

20 years (approximate)

10 years for replacement spool installed as part of the John Brookes Replacement Project completed Q1 2023

5

Pipeline Material

Carbon Steel

6

Pipeline and Riser Steel Grade

DNV-OS-F101 Grade 450

7

Pipeline Specification

DNV-OS-F101 High Frequency Weld

8

Minimum yield strength of pipe steel

450 MPa (65,267.0 psi) Specified Minimum Yield Strength (SMYS)

9

Maximum Allowable Operating Pressure

13.75 MPag (1,994.3 psi)

10

Design Capacity

Maximum design flowrate of 260 MMscf/d

11

Characteristics of substance proposed to be conveyed

Wet gas (approximate 85.5% methane saturated with water at reservoir conditions)

12

General plans and descriptions of pump stations, tank stations or valve stations and their equipment

  • Subsea isolation valve located adjacent to
    John Brookes platform, which is provided with dropped object protection frame and
    1 electrical cable and 1 hydraulic pack

13

General plans and descriptions of pipeline repair

2015 Replacement Project

  • The inclusion of a 520 m (1,706 ft) (nominal) length comprising straight spools and tie-in spools to form a cooling spool downstream of the Subsea Isolation Valve as the replacement for the existing Carbon Steel pipeline
  • Straight spools American National Standards Institute (ANSI) flange jointed (Weld Neck/swivel-ring pairs) as 4 lengths (nominally 46 m (150.9 ft) long), externally coated with Thermally Sprayed Aluminium (TSA)
  • Tie-in spools ANSI flange jointed (WN/swivel-ring pairs) as varying lengths, externally coated with TSA
  • Straight spools, tie-in spools and flanges corrosion-resistant alloy (CRA) (Inconel 625) clad internally
  • Straight and tie-in spools stabilised by gravity anchors
  • Cooling spool cathodic protection by sacrificial anodes affixed to the gravity anchors and cable connected to the straight and tie-in spools
  • Straight and tie-in spool welded joints TSA coated
  • Subsea Isolation Valve structural modification to accommodate the new spool configuration
  • Downstream tie-in of the cooling spool via mechanical connector
  • Removal of the existing Ring Pair Corrosion Monitoring (RPCM) probe and dummy spool immediately downstream of the Subsea Isolation Valve
  • Installation of a retrievable temperature data logger in the vicinity of the mechanical connector.

 

2023 Tie-In Spool Replacement

  • Replacement of the tie-in spool directly upstream of the Subsea Isolation Valve
  • Tie-in spool ANSI flange jointed (WN/swivel-ring pair) and externally coated with TSA
  • Tie-in spool and flanges corrosion-resistant alloy (CRA) (Inconel 625) clad internally
  • Tie-in spool cathodic protection by sacrificial anodes affixed to the existing gravity anchor

14

General plans and description of pigging facilities

Provision for offshore pig launcher located at the platform and an onshore pig receiver at Varanus Island

 

Interactions