Application for Variation of a Pipeline Licence – Pipeline Licence VIC/PL26 (PNNQMH)

Administered by Department of Industry, Science and Resources

Legislation au C2024G00349 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR VARIATION OF A PIPELINE LICENCE –

PIPELINE LICENCE VIC/PL26 (PNNQMH)

 

I, STEVEN ROBERT TAYLOR, Delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority hereby give notice pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 (the Act) that an application has been received from

 

Esso Australia Resources Pty Ltd

(ACN 091 829 819)

 

Woodside Energy (Bass Strait) Pty Ltd

(ACN 004 228 004)

 

for the variation of Pipeline Licence VIC/PL26 in the offshore area of Victoria, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the
Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

STEVEN ROBERT TAYLOR

DELEGATE OF THE TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–VICTORIA

OFFSHORE PETROLEUM JOINT AUTHORITY

 

 


APPLICATION FOR VARIATION OF

PIPELINE LICENCE VIC/PL26

 

 

The application seeks to affect the following amendments to the licence:

 

  1. The FIRST SCHEDULE (Route of the Pipeline) is varied by deleting all the current text and replacing with the following:

 

The route of the pipeline is described in the table below, and displayed in the map below (Attachment A), commencing at cut spool location at the Bream B platform and terminating at the first flange upstream of the First Valve On (FVO) on the Bream A platform.

 

ID

DESCRIPTION

Easting (m)

Northing (m)

1

Cut spool location at Bream B platform

573165.75

5736356.95

2

Inflection Point 01

573169.96

5736378.18

3

Inflection Point 02

567311.66

5738412.31

4

BMA350 Gas Pipeline Crossing

567313.12

5738464.42

5

Inflection Point 03

567313.23

5738467.90

6

FVO Bream A Manifold

567333.57

5738466.16

 

Coordinate set above is based on GDA 94/MGA Zone 55, survey of pipeline centreline.

 

2.      The SECOND SCHEDULE of the Licence is varied by:

 

  1. deleting the following text in item (iii), Part A – Design:

 

(iii) The riser design is based on the following parameters:

 

(a)   one 250mm nominal diameter pipeline connected to each end of the pipeline referred to in A(i)(a) above;

(b)   a flow rate of 7500 sm3/d (0.047 MMbbl/d) of liquid hydrocarbons and water and 1.80 MMsm3/d (63.57 MMscf/d) of gaseous hydrocarbons;

(c)   a design temperature of 70oC;

(d)   full production up to 95% water cut;

(e)   operation with a maximum H2S concentration of 200 ppm and CO2 concentration of 2.7 Mol%.

 

b.      deleting the following text under the third paragraph in item (i), Part B – Materials of

Construction – Steel Pipe:

 

The riser pipe shall be in accordance with the requirements of the American Petroleum Institute Specification – API Spec 5L, Nov 1992, 40th Edition for Grade X65 seamless pipe and Esso Australia Limited supplemental pipe specification accompanying the pipeline licence application, and shall have the dimensions 273.1 mm O.D. with 18.3 mm W.T.

 

c.       deleting the following text under item (ii), Part B – Protective Coating:

 

Protection of the riser pipework by an epoxy coating shall be in accordance with the Coating Specification No 4.3 – Protective Coatings for Onshore Plants, Offshore Platforms and other Marine Structures.

 

The riser pipework in the splash zone area is protected with a 12 mm mild steel sleeve and 5 mm monel sheeting.

 

d.      deleting the text under Part C – Cathodic Protection:

 

(a)   Insulating joints shall be installed at each end of the pipeline in accordance with the construction specifications accompanying the pipeline licence application.

 

(b)   Transformer rectifier units on the Bream A platform shall provide protection to the subsea portion of the pipeline.

 

(c)   Sacrificial anodes in the form of zinc bracelets 620 mm long with a net weight of 112 kg, shall be installed and spaced approx. 96 metres apart on the pipeline as detailed in the construction specifications and cathodic protection design.

 

The rest of the SECOND SCHEDULE remains as stated in the licence instrument dated 14 October 1996 and as varied on 19 May 2020.


 

Attachment A

Overview

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 was enacted to provide a comprehensive legal framework for the regulation of offshore petroleum activities and greenhouse gas storage in Australia. This Act addresses the need for a unified and efficient system to manage the exploration, production, and storage of offshore petroleum resources, while also considering environmental protection and the mitigation of greenhouse gas emissions. Enacted by the Commonwealth Parliament, the Act aims to ensure that offshore activities are conducted in a manner that balances economic interests with environmental sustainability and public safety. The Act establishes the legal basis for licensing, environmental protection, and safety standards, providing a structured approach to the regulation of offshore operations. The Commonwealth of Australia, through the enactment of this Act, seeks to achieve policy objectives such as promoting the responsible development of offshore petroleum resources, protecting the marine environment, and ensuring the safety and reliability of offshore infrastructure. The Act empowers the relevant authorities to issue licenses, impose conditions, and enforce compliance with safety and environmental standards. This legislative framework is designed to foster responsible and sustainable practices in the offshore petroleum industry, thereby contributing to both economic growth and environmental stewardship.

Scope and Application

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 applies to the regulation and management of offshore petroleum activities and greenhouse gas storage within Australian waters. Specifically, this Act governs the granting and variation of pipeline licences, such as Pipeline Licence VIC/PL26, which is pertinent to the offshore area of Victoria. The Act applies to entities involved in offshore petroleum activities, including companies like Esso Australia Resources Pty Ltd and Woodside Energy (Bass Strait) Pty Ltd, who are seeking variations to their pipeline licences. The geographic reach of this Act is limited to Commonwealth waters, including state offshore areas such as Victoria. The Act also outlines procedures for public submissions on licence variations, as indicated in the notice, allowing interested parties to comment within a specified period. Additionally, the Act may extend or restrict its application through subordinate instruments, which may provide further detail on technical standards and operational requirements. However, the notice does not explicitly mention any exclusions, exemptions, or thresholds applicable to this specific variation application.

Key Provisions

Pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006, Steven Robert Taylor, acting as the Delegate of the National Offshore Petroleum Titles Administrator, provides notice of an application by Esso Australia Resources Pty Ltd and Woodside Energy (Bass Strait) Pty Ltd to vary Pipeline Licence VIC/PL26. The application proposes significant changes to the pipeline's route and operational parameters. Specifically, the First Schedule (Route of the Pipeline) will be amended to detail a new pipeline route from the Bream B platform to the Bream A platform, with precise coordinates provided for various inflection points and critical junctions. Additionally, the Second Schedule, which details design, materials, protective coatings, and cathodic protection, will be altered by removing specific riser design parameters, materials specifications, coating requirements, and cathodic protection methods. The application imposes obligations on Esso Australia Resources Pty Ltd and Woodside Energy (Bass Strait) Pty Ltd to provide detailed plans and specifications for the proposed pipeline route and modifications. They must ensure that all changes comply with relevant safety and environmental standards, and must submit these to the Titles Administrator for review. Furthermore, the companies must address any feedback from the Titles Administrator and the public during the submission period. The application also requires the companies to submit any additional documentation or information necessary to support their proposal for the pipeline variation. Under the Act, failure to comply with the requirements for pipeline licence variations may result in penalties or other enforcement actions. Any breaches of the legislative provisions regarding the operation and management of offshore petroleum activities can lead to civil or criminal penalties. The maximum penalties for serious offences under the Act can include substantial fines and, in some cases, imprisonment for individuals. For companies, the penalties can include fines that are significant, reflecting the severity of the breach and its impact on safety and the environment. The Act also allows for the suspension or revocation of licences in cases of serious non-compliance or repeated offences.

Legal classification tags

Area of Law
Environmental Law
Instrument
Gazette Notice
Concepts
Reporting & Disclosure Obligations