Application for Variation of a Pipeline Licence - Pipeline Licence VIC/PL21 (Perch to Shore) (QHZ55G)

Administered by Department of Industry, Science and Resources

Legislation au C2026G00517 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR VARIATION OF A PIPELINE LICENCE - PIPELINE LICENCE VIC/PL21 (PERCH TO SHORE) (QHZ55G)

 

I, MONICA ELAINE ATSALIS, the Delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority hereby give notice pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

Esso Australia Resources Pty Ltd

(ACN 091 829 819)

 

Woodside Energy (Bass Strait) Pty Ltd

(ACN 004 228 004)

 

 

for the variation of Pipeline Licence VIC/PL21 in the offshore area of Victoria, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the
Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

MONICA ELAINE ATSALIS

DELEGATE OF THE TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–VICTORIA

OFFSHORE PETROLEUM JOINT AUTHORITY

 

 

 


APPLICATION FOR VARIATION OF

PIPELINE LICENCE VIC/PL21

 

The application seeks to effect the following amendments to the licence: 

  1.       Removal of the flexible jumpers at Perch and Dolphin platforms, the pipeline remaining on the seabed will be plugged using environmental plugs and the remaining licensed pipeline will be decommissioned at a later date in accordance with the regulatory approvals in place for that decommissioning activity.

 

  1.       The FIRST SCHEDULE of the Licence is varied by deleting the current text and table below the heading “FIRST SCHEDULE ROUTE OF PIPELINE”

and

substituting under the heading the following:

“The route of the pipeline is described in the table below, and displayed in the map below

(Attachment A), commencing at the start of the steel pipeline near the Perch platform location before proceeding through two major deflections, and continuing in a straight line with minor deflections to a point which intersects the boundary of Commonwealth offshore waters at the 3 nautical mile limit.”

 

ID

Description

Easting (mE)

Northing (mN)

1

Start of Steel Pipe near Perch platform

528072

5730975

2

Tangent Intersection Point 06

527415

5731937

3

Tangent Intersection Point 07

533816

5739201

4

Dolphin Platform T connection location

532889

5740035

5

3 Nautical Mile Limit Crossing

522272

5749839

Coordinate set above is based on GDA 94/MGA Zone 55, survey of pipeline centreline.

 

 

  1.       The SECOND SCHEDULE of the Licence is varied by deleting all current text as stated in the licence instrument dated 31 August 1989 and all subsequent variations (e.g., variation dated 8 May 2020 and 3 April 2025), and substituting with the following:

 

SPECIFICATION 

 

(A) Design

 

The pipeline design is based on the following parameters –

 

  1.             one 300 mm nominal diameter pipeline for the conveyance of liquid hydrocarbons;
  2.             a flow rate of 3,800 sm3/d (0.024 MMbbl/d) of liquid hydrocarbons;
  3.             an internal design pressure of 15,310 kPag;
  4.             a design temperature of 65.5°C;
  5.             a specific gravity of 2.5 for the 323.9 mm X 22.2 mm pipeline (including contents);
  6.             a pipeline length of approximately 26.4 km.

 

(B) Materials of Construction

 

  1.             Steel Pipe

 

The line pipe shall be in accordance with the requirements of the American Petroleum Institute Specification – API Spec 5L for Grade X42 seamless pipe and Esso Australia Limited supplemental pipe specification accompanying the pipeline licence application and the pipeline shall have the dimensions 323.9 mm O.D. with 22.2 mm W.T.

 

  1.             Protective Coating

 

The line pipe shall be protected by a coating of Taubmans HB3005 Fusion Bonded Epoxy 400-500 Microns thick, and in accordance with the Esso Australia Limited Protective Coatings Specifications accompanying the pipeline licence application.

 

(C) Cathodic Protection

 

Sacrificial anodes in the form of zinc bracelets 600mm long by 560mm O.D., net  weight 628Kg, shall be installed and spaced 625 metres apart on the pipeline, as               detailed in the construction specifications and cathodic protection design.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 