COMMONWEALTH OF AUSTRALIA
Section 708
Offshore Petroleum and Greenhouse Gas Storage Act 2006
APPLICATION FOR GRANT OF A PIPELINE LICENCE
I, STEVEN ROBERT TAYLOR, delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby give notice pursuant to section 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from
Woodside Energy Julimar Pty Ltd
ACN 130 391 365
KUFPEC Australia (Julimar) Pty Ltd
ACN 139 500 502
for the grant of a pipeline licence for the conveyance of petroleum in the offshore area of Western Australia, as set out below.
This notice takes effect on the day in which it appears in the
Australian Government Gazette.
Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia.
STEVEN ROBERT TAYLOR
DELEGATE OF THE TITLES ADMINISTRATOR
ON BEHALF OF THE COMMONWEALTH-WESTERN AUSTRALIA
OFFSHORE PETROLEUM JOINT AUTHORITY
ROUTE OF THE PIPELINE
The pipeline route is described in the table hereunder and displaced in the attached map (Attachment 1), commencing at the downstream connector hub face at the Julimar A Drill Centre Manifold to the upstream connector hub face of the existing Brunello A Cross-over Manifold within a corridor of 100m. Coordinates are based on Geodetic Datum of Australia (GDA94).
Feature ID | Feature Name | UTM Zone | Easting (mE) | Northing (mN) |
1 | Julimar-A Drill Centre Manifold | Zone 50 | 295 229.44 | 7 770 931.34 |
2 | Julimar-A Flowline End Termination | Zone 50 | 295 401.46 | 7 770 949.15 |
3 | Start of first bend (turning point) | Zone 50 | 295 558.01 | 7 771 392.93 |
4 | Inflection point of bend 1 | Zone 50 | 295 706.70 | 7 771 570.13 |
5 | End of first bend (turning point) | Zone 50 | 295 885.38 | 7 771 717.04 |
6 | In-Line Tee Assembly to allow for potential future expansion | Zone 50 | 298 097.04 | 7 773 535.45 |
7 | Start of second bend (turning point) | Zone 50 | 310 114.54 | 7 783 416.19 |
8 | Inflection point of bend 2 | Zone 50 | 310 700.18 | 7 783 897.70 |
9 | End of second bend (turning point) | Zone 50 | 311 454.63 | 7 783 972.80 |
10 | Brunello-A Flowline End Termination | Zone 50 | 311 949.96 | 7 784 022.11 |
11 | Brunello-A Cross-over Manifold | Zone 50 | 311 987 | 7 784 093 |
SPECIFICATIONS
Design and Construction
The offshore pipeline must be designed and constructed in accordance with Offshore Standard DNV-OS-F101 – Submarine Pipeline Systems (Offshore Pipeline), which is incorporated in its entirety in Australian Standard AS2885.4 – Pipelines, Gas and Liquid Petroleum (Part 4: Submarine Pipelines). Specifically, the design and construction phase of the pipeline must comply with DNV‑OS-F101.
Basis of Design
The pipeline design is based on the following parameters:
Item | Item Description | Details |
1 | Outside diameter of pipe and riser | 457.2 mm (18 inches) |
2 | Wall thickness of pipe inclusive of riser (only for carbon steel) | 3 mm
|
3 | Length | 21.352 km (approximate) |
4 | Design life | 25 years (approximate) |
5 | Pipeline Material | Rigid Corrosion Resistant Alloy Clad Steel |
6 | Pipeline and Riser Steel Grade | DNV-OS-F101 Grade 450 |
7 | Pipeline Specification | DNV-OS-F101 High Frequency Weld |
8 | Minimum yield strength of pipe steel | TBC |
9 | Maximum Allowable Operating Pressure | 36.96 MPa(a) |
10 | Design Capacity | 500 MMscf/d |
11 | Maximum Design Temperature | 134⁰C |
12 | Minimum Design Temperature | Tie-in spools/FLET: -25⁰C Flowline/ILT: -20⁰C |
13 | Characteristics of substance proposed to be conveyed | Gas |
14 | General plans and descriptions of pump stations, tank stations or valve stations and their equipment | Comprises of an 18-inch CRA clad flowline which will be routed approximately 22 km from a new JULA drill centre to the existing BRUA XOM. The pipeline terminates at both ends with a FLET structure and has an ILT approximately 5km from JULA for future tie-in. |
15 | General plans and description of pigging facilities | N/A |
16 | Cathodic Protection | 29 sacrificial Aluminium-Zinc-Indium anodes installed on the flowline, spools and structures with a spacing of 61 joints.
The condition of the cathodic protection will be monitored via periodic ROV survey. |
17 | Hydrate Management | Insulation and MEG injection |