Application for Grant of a Pipeline Licence - Offshore Area of Western Australia

Administered by Department of Industry, Science and Resources

Legislation au C2021G00601 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Section 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR GRANT OF A PIPELINE LICENCE - OFFSHORE AREA OF WESTERN AUSTRALIA

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby give notice pursuant to section 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

Woodside Energy Ltd

(ACN 005 482 986)

 

BHP Petroleum (North West Shelf) Pty Ltd

(ACN 004 514 489)

 

BP Developments Australia Pty Ltd

(ACN 081 102 856)

 

Chevron Australia Pty Ltd

(ACN 086 197 757)

 

Japan Australia LNG (MIMI) Pty Ltd

(ACN 006 303 180)

 

Shell Australia Pty Ltd

(ACN 009 663 576)

 

 

for the grant of a pipeline licence for the conveyance of petroleum in the offshore area of Western Australia, as set out below.

 

A person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day in which it appears in the

Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH-WESTERN AUSTRALIA

OFFSHORE PETROLEUM JOINT AUTHORITY

ROUTE OF THE PIPELINE

 

The pipeline route is described in the table hereunder and displayed in the attached map (Attachment 1), commencing at the Universal Connection System (UCON) connector face on the flexible flowline downstream of the Lambert Deep manifold to the flange upstream of the riser emergency shutdown valve (RESDV) on the Angel Platform within an 80 m corridor (± 40 m centred on the pipeline). Coordinates are based on Geodetic Datum of Australia (GDA94).

 Feature

UTM Zone

Easting

(mE)

Northing

(mN)

Radius m

 J-Tube Entry at Angel Platform

Zone 50

457 814 E

7 843 974 N

 

TP1

Zone 50

457 798 E

7 843 994 N

 

IP1

Zone 50

457 792 E

7 844 001 N

100

TP2

Zone 50

457 784 E

7 844 007 N

 

TP3

Zone 50

457 705 E

7 844 071 N

 

IP2

Zone 50

457 686 E

7 844 087 N

70

TP4

Zone 50

457 661 E

7 844 087 N

 

TP5

Zone 50

456 760 E

7 844 087 N

 

IP3

Zone 50

456 750 E

7 844 087 N

70

TP6

Zone 50

456 740 E

7 844 084 N

 

TP7

Zone 50

455 878 E

7 843 824 N

 

IP4

Zone 50

455 421 E

7 843 686 N

1000

TP8

Zone 50

455 026 E

7 843 956 N

 

TP9

Zone 50

452 366 E

7 845 769 N

 

IP5

Zone 50

452 238 E

7 845 857 N

1000

TP10

Zone 50

452 142 E

7 845 980 N

 

TP11

Zone 50

451 667 E

7 846 587 N

 

IP6

Zone 50

451 621 E

7 846 645 N

500

TP12

Zone 50

451 561 E

7 846 688 N

 

TP13

Zone 50

445 887 E

7 850 675 N

 

IP7

Zone 50

445 878 E

7 850 682 N

30

TP14

Zone 50

445 866 E

7 850 680 N

 

IP8

Zone 50

445 855 E

7 850 679 N

30

TP15

Zone 50

445 845 E

7 850 686 N

 

Lambert Deep Manifold

Zone 50

445 760 E

7 850 745 N

 

 

 

SPECIFICATIONS

 

Design and Construction

 

The offshore pipeline must be designed and constructed in accordance with Offshore Standard DNV-OS-F101 – Submarine Pipeline Systems (Offshore Pipeline), which is incorporated in its entirety in Australian Standard AS2885.4 – Pipelines, Gas and Liquid Petroleum (Part 4: Submarine Pipelines). Specifically, the design and construction phase of the pipeline must comply with DNVGL-ST-F101.

 

Basis of Design

 

The pipeline design is based on the following parameters:

 

Item

Item Description

Details

1

Outside diameter of pipe and riser

254 mm (10 inches)

2

Wall thickness of flowline and riser section

TBC

3

Length

14.7 km (approximate)

4

Design life

20 years

5

Pipeline Material

Flexible Corrosion Resistant Alloy steel

6

Pipeline and Riser Steel Grade

DNVGL-ST-F101 API 17J unbonded flexible pipe

7

Pipeline Specification

DNVGL-ST-F101

8

Minimum yield strength of pipe steel

415 MPa

9

Maximum Allowable Operating Pressure

19.5 MPa(a)

10

Design Capacity

180 MMscf/d

11

Maximum Design Temperature

115 ⁰C

12

Minimum Design Temperature

-30 ⁰C

13

Operating temperature range

Maximum: 97 – 115 ⁰C

Minimum: 21.3 ⁰C

14

Characteristics of substance proposed to be conveyed

Gas

15

General plans and descriptions of pump stations, tank stations or valve stations and their equipment

Comprises of a 10-inch CRA clad flowline which will be routed from the Lambert Deep manifold drill centre to the Angel Platform.

 

The applicants have requested that the proposed Lambert Deep manifold in Petroleum Production Licence WA16L be declared as a terminal station pursuant to section 16 of the Act.

16

General plans and description of pigging facilities

N/A

17

Cathodic Protection

Al-Zn-In sacrificial bracelet anodes

Monitoring via ROV or AUV survey

18

Hydrate Management

Insulation and MEG injection

Attachment 1

Overview

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 was enacted to establish a framework for the regulation of offshore petroleum and greenhouse gas storage activities. This Act addresses the need for a comprehensive legislative regime to manage the environmental, safety, and economic aspects of offshore petroleum exploration, production, and storage. Enacted by the Parliament of Australia, the policy objective of this Act is to ensure that offshore petroleum activities are conducted in a manner that is safe, environmentally responsible, and economically efficient. The Act provides the legal basis for the regulation of offshore petroleum operations, including the issuance of licenses and permits, the setting of environmental standards, and the imposition of penalties for non-compliance. The legislation establishes a joint authority between the Commonwealth and the relevant state or territory to administer the Act. This collaborative approach ensures that both federal and state interests are considered in the regulation of offshore activities. The Act also includes provisions for public consultation and the consideration of community impacts, reflecting a commitment to transparency and stakeholder engagement in the decision-making process. Through this legislative framework, the Act aims to balance the development of offshore resources with the protection of the marine environment and the interests of local communities.

Scope and Application

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 applies to the granting of a pipeline licence for the conveyance of petroleum in the offshore area of Western Australia. Specifically, this notice pertains to an application received from Woodside Energy Ltd, BHP Petroleum (North West Shelf) Pty Ltd, BP Developments Australia Pty Ltd, Chevron Australia Pty Ltd, Japan Australia LNG (MIMI) Pty Ltd, and Shell Australia Pty Ltd for such a licence. The application details the design, construction, and operational specifications of the proposed pipeline, including its route, materials, and capacity. This notice is effective upon its publication in the Australian Government Gazette and is issued by the National Offshore Petroleum Titles Administrator on behalf of the Commonwealth-Western Australia Offshore Petroleum Joint Authority. The Act provides for public submissions regarding the application within 30 days of the notice’s publication, allowing stakeholders to voice their concerns or support. The application is subject to compliance with the Offshore Standard DNV-OS-F101 and Australian Standard AS2885.4, ensuring the pipeline's design and construction meet stringent safety and technical standards.

Key Provisions

The notice given under section 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 (the Act) pertains to an application for the grant of a pipeline licence by several companies, including Woodside Energy Ltd, BHP Petroleum (North West Shelf) Pty Ltd, BP Developments Australia Pty Ltd, Chevron Australia Pty Ltd, Japan Australia LNG (MIMI) Pty Ltd, and Shell Australia Pty Ltd, for the conveyance of petroleum in the offshore area of Western Australia. The pipeline's route is described in detail and is depicted in the attached map (Attachment 1), specifying the coordinates based on the Geodetic Datum of Australia (GDA94). The design and construction of the pipeline must adhere to the Offshore Standard DNV-OS-F101 – Submarine Pipeline Systems, as incorporated in Australian Standard AS2885.4 – Pipelines, Gas and Liquid Petroleum (Part 4: Submarine Pipelines), specifically complying with DNVGL-ST-F101. The pipeline design parameters include an outside diameter of 254 mm (10 inches), a length of approximately 14.7 km, a design life of 20 years, and a flexible Corrosion Resistant Alloy steel material. The Act imposes several obligations and requirements on the parties involved. The offshore pipeline must be designed and constructed according to the specified standards and parameters. This includes the use of flexible Corrosion Resistant Alloy steel for the pipeline material, ensuring compliance with DNVGL-ST-F101 API 17J unbonded flexible pipe. The pipeline's design capacity is set at 180 MMscf/d, with a maximum allowable operating pressure of 19.5 MPa. Additionally, the pipeline must be capable of operating within a temperature range of 97–115 °C and -30 °C. The applicants have requested that the proposed Lambert Deep manifold in Petroleum Production Licence WA-16-L be declared as a terminal station. The design must also incorporate cathodic protection using Al-Zn-In sacrificial bracelet anodes, monitored via ROV or AUV survey, and hydrate management through insulation and MEG injection. Failure to comply with the provisions of the Act may result in various civil and criminal consequences. The Act provides for offences and penalties for breaches, although specific maximum penalties are not detailed in the notice. Breaches of the Act can lead to enforcement actions, including fines, imprisonment, or both, depending on the nature and severity of the violation. Additionally, the applicants may face legal action if their pipeline does not meet the required standards or if they fail to adhere to the specified operational and safety requirements. The penalties can vary based on the specific provisions of the Act and the circumstances of the breach.

Legal classification tags

Area of Law
Environmental Law
Instrument
Gazette Notice
Concepts
Definitions & Interpretation
Reporting & Disclosure Obligations
Compliance Obligations

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.