COMMONWEALTH OF AUSTRALIA

 

Section 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR GRANT OF A PIPELINE LICENCE (JDP3-JULB Pipeline) – OFFSHORE AREA OF WESTERN AUSTRALIA

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby give notice pursuant to section 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

Woodside Energy Julimar Pty Ltd

(ACN 130 391 365)

 

KUFPEC Australia (Julimar) Pty Ltd

(ACN 139 500 502)

 

for the grant of a pipeline licence for the conveyance of petroleum in the offshore area of Western Australia, as set out below.

 

A person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day in which it appears in the

Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH-WESTERN AUSTRALIA

OFFSHORE PETROLEUM JOINT AUTHORITY


 

ROUTE OF THE PIPELINE

The pipeline route for the system of pipes commences at the upstream connector hub face of the inline tee (ILT) of the Julimar Phase 2 (JDP2) rigid pipeline (Petroleum Pipeline Licence WA-29-PL) to the production jumper end fitting hub faces, connecting to downstream Diverless connectors at the JUB1A and JUB1B Christmas tree ends, via two infield production flowlines tied back to the JULB manifold, within a 40 m corridor (± 20 m centred on the pipelines) as described in the tables hereunder and displayed in the attached map (Attachment 1).

 

10” Production Flowline

Feature ID

Feature Name

UTM Zone

Easting

(mE)

Northing

(mN)

1

JULB Manifold (centroid)

50

296852.0

7775457.0

2

JULB Manifold Hub

50

296852.0

7775451.3

3

Turning Point 1

50

296852.0

7775308.0

4

Intersection Point 1

50

296852.0

7775265.7

5

Turning Point 2

50

296074.1

7775229.6

6

Turning Point3

50

297891.2

7773569.0

7

Intersection Point 2

50

297920.5

7773522.0

8

Turning Point 4

50

297972.0

7773562.5

9

ILT Hub

50

297988.4

7773575.4

10

JULB ILT (centroid)

50

297993.0

7773549.6

 

 

JUB1A Christmas tree (XT) 8” Production Jumper

Feature ID

Feature Name

Easting

(mE)

Northing

(mN)

1

JULB Manifold (centroid)

296852.0

7775457.0

2

JULB Manifold Hub

296846.6

7775455.5

3

Turning Point 1

269820.7

7775455.5

4

Intersection Point 1

269792.1

7775455.5

5

Turning Point 2

296801.9

7775428.6

6

JUB1A XT Hub

296807.7

7775412.5

7

JUB1A XT (centroid)

296809.0

7775409.0

 


 

JUB1B Christmas tree (XT) 8” Production Jumper

Feature ID

Feature Name

Easting

(mE)

Northing

(mN)

1

JULB Manifold (centroid)

296852.0

7775457.0

2

JUB1B Manifold Hub

296857.4

7775455.5

3

Turning Point 1

296996.8

7775455.5

4

Intersection Point 1

297025.7

7775455.5

5

Turning Point 2

297052.5

7775466.1

6

Turning Point3

300739.7

7776938.5

7

Intersection Point 2

300760.2

7776946.7

8

Turning Point 4

300782.2

7776948.6

9

JUB1B XT Hub

300897.3

7776958.7

10

JUB1B XT (centroid)

300901.0

7776959.0

 

SPECIFICATIONS

 

Design and Construction

 

The offshore pipeline must be designed and constructed in accordance with Offshore Standard DNV-OS-F101 – Submarine Pipeline Systems (Offshore Pipeline), which is incorporated in its entirety in Australian Standard AS2885.4 – Pipelines, Gas and Liquid Petroleum (Part 4: Submarine Pipelines). Specifically, the design and construction phase of the pipeline must comply with DNVGL-RP-F101

 

Basis of Design

 

The pipeline design is based on the following parameters:

 

Item

Item Description

Details

1

Outside diameter of pipe and riser

JULB flowline: 435.88 mm (10 inches)

JUB1A & JUB1B flowlines: 382.48mm (8 inches)

2

Wall thickness of pipe inclusive of riser (only for carbon steel)

JULB flowline: 76.94 mm

JUB1A & JUB1B flowlines: 89.64mm

3

Length

JULB flowline: 2.33km

JUB1A flowline: 0.1km

JUB1B flowline: 4.38km

Total: 6.82km

4

Design life

Flowlines and Jumpers: 20 years

JULB Manifold: 25 years

5

Pipeline Material

Flexible Corrosion Resistant Alloy steel

6

Pipeline and Riser Steel Grade

DNVGL-RP-F101 API 17J unbonded flexible pipe

7

Pipeline Specification

DNVGL-RP-F101

8

Minimum yield strength of pipe steel

415 MPa

9

Maximum Allowable Operating Pressure

36.12 MPa(a)

10

Design Capacity

180 MMscf/d

11

Maximum Design Temperature

Flowlines and Jumpers: 128°C

JULB Manifold: 136°C

12

Minimum Design Temperature

Flowlines and Jumpers: -30°C

JULB Manifold: -29°C

13

Operating Temperature Range

Maximum: 119.6°C

Minimum: 109.6°C

14

Characteristics of substance proposed to be conveyed

Gas

15

General plans and descriptions of pump stations, tank stations or valve stations and their equipment

N/A

16

General plans and description of pigging facilities

N/A

 

17

Cathodic Protection

The cathodic protection system for the JULB production flowlines and jumper comprises Aluminium-Zinc-Indium anodes adjacent to the flexible end fittings.

 

The condition of the cathodic protection will be monitored via periodic ROV or AUV surveys.

18

Hydrate Management

Insulation

 