COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Fairchild (Swearingen) SA226 and SA227 Series Aeroplanes
AD/SWSA226/23 Fuel and Hyraulic Lines Inspection 11/76
Applicability: All SA-226 series not incorporating Swearingen SB No. 54-003. Document: Swearingen SB 54-002.
Compliance: Within 50 hours time in service after 28 October 1976 and thereafter at intervals not exceeding 50 hours time in service.
Overview
The Civil Aviation Regulations 1998, enacted by the Parliament of Australia, is a comprehensive regulatory framework designed to ensure the safety, efficiency, and orderly development of civil aviation within Australia. One particular legislative instrument within this framework is F2006B07166, which addresses the need for regular inspections of specific aircraft models to maintain their airworthiness. This particular instrument, titled "AD/SWSA226/23 Fuel and Hydraulic Lines Inspection," targets Fairchild (Swearingen) SA226 and SA227 series aeroplanes, ensuring the integrity of their fuel and hydraulic lines. The policy objective of this instrument is to mitigate potential risks associated with these aircraft by enforcing timely inspections, thus enhancing safety standards and ensuring compliance with the overarching goals of the Civil Aviation Regulations.
The problem this legislation addresses is the need for regular and systematic inspections of specific aircraft components to prevent potential failures that could compromise flight safety. By mandating inspections within 50 hours of time in service after a specific date and at intervals not exceeding 50 hours thereafter, the Civil Aviation (Safety) Authority aims to proactively manage and reduce the risk of accidents related to fuel and hydraulic line failures in the targeted aircraft models. This instrument underscores the commitment to maintaining high safety standards within Australia's civil aviation sector.
Scope and Application
The Civil Aviation Regulations 1998, specifically Part 39 - 105, includes the Civil Aviation Safety Authority's Schedule of Airworthiness Directives which govern the operational safety of aircraft in Australia. One such directive, AD/SWSA226/23, pertains to the Fairchild (Swearingen) SA226 and SA227 series aeroplanes, focusing on the inspection of fuel and hydraulic lines. This directive applies to all SA-226 series aircraft that do not incorporate Swearingen SB No. 54-003, as documented in Swearingen SB 54-002. Compliance with this directive is mandatory for ensuring the airworthiness of these aircraft, requiring inspections to be conducted within 50 hours of time in service after 28 October 1976, and subsequently at intervals not exceeding 50 hours of time in service. The regulatory framework set by the Civil Aviation Regulations 1998, and by extension the AD/SWSA226/23 directive, ensures that the specified aircraft meet stringent safety standards to protect the public and maintain the integrity of civil aviation operations within Australia.
Key Provisions
The Civil Aviation Regulations 1998, Part 39 - 105, specifically in the context of the Civil Aviation Safety Authority (CASA) Schedule of Airworthiness Directives for Fairchild (Swearingen) SA226 and SA227 series aeroplanes, includes an Airworthiness Directive (AD) titled AD/SWSA226/23, which mandates inspection of fuel and hydraulic lines. This directive applies to all SA-226 series aircraft that do not incorporate Swearingen Service Bulletin No. 54-003, as documented in Swearingen Service Bulletin 54-002. According to section 11/76 of the directive, compliance is required within 50 hours of time in service after 28 October 1976, and then at intervals not exceeding 50 hours of time in service thereafter.
Entities and parties governed by this directive must ensure that inspections of the fuel and hydraulic lines are conducted as specified. This includes reviewing the condition of the lines to prevent any potential failure that could compromise the aircraft's safety. The responsibility falls on aircraft owners, operators, and maintenance personnel to adhere to these requirements meticulously. This obligation ensures that the aircraft remains airworthy and complies with the regulatory standards set by CASA.
Failure to comply with the provisions outlined in AD/SWSA226/23 may result in severe consequences. CASA has the authority to enforce penalties and sanctions against non-compliant entities. Civil penalties can be imposed, which may include fines or other financial penalties. In more severe cases, CASA may suspend or revoke the aircraft’s certificate of airworthiness, leading to grounding of the aircraft until the required inspections are completed and compliance is verified. Additionally, any breach of these regulations can lead to criminal charges, where individuals or companies may face prosecution, potentially resulting in imprisonment depending on the severity and intent behind the non-compliance.