AD/STRIKEMASTER/2 - Control Column Cracking

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2006B07134 In force Legislative Instrument

Legislation content

COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES

 


BAe (BAC 167) Strikemaster Series Aeroplanes

 

AD/STRIKEMASTER/2 Control Column Cracking 12/96 DM

Applicability: BAe BAC 167 Strikemaster all Mks.

 

Requirement: 1. Inspect the control column in accordance with BAe CSTM/SM/156.

 

2. Inspect by NDI, the control column lugs for cracks in accordance with BAe CSI/STRIKEMASTER/51.

 

Note: UK CAA Mandatory Permit Directive 1995-108 refers.

 

Compliance: 1. Unless already accomplished, before further flight after 25 September 1996.

 

2. Within 150 hours time in service or 28 days after 25 September 1996, whichever occurs last, after the initial inspection in accordance with Requirement 1; thereafter at intervals not exceeding 150 hours time in service.

 

Background: A case has occurred where the upper part of the Post Mod 1759 control column has cracked at the aft lug, which forms part of the column top to base pivot point. As a result, permit holders are required to assure the integrity of the control column structure through ensuring that Requirement 1. has been carried out, and continuing to inspect thereafter.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.