COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 106 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Pratt and Whitney Canada Turbine Engines - PW100 Series
AD/PW100/8 Fuel Manifolds 3/97
Applicability: All PW100 series engines.
Requirement: Install new fuel manifold transfer tubes and new lockplates in accordance with Pratt and Whitney Canada Service Bulletins, 21077R7 dated 10 October 1996 and 21373R3 dated 11 October 1996, respectively.
Note1: Later revisions of the referenced service bulletins or superseding service bulletins that meet the intent of the referenced service bulletins satisfy the requirements of this Directive.
Note2: Transport Canada AD CF-96-22 refers.
Compliance: Unless previously accomplished:-
(a) At the next engine shop visit; or
(b) No later than the next fuel nozzle change; or
(c) Prior to 30 November 1998; whichever occurs first.
This Directive becomes effective 27 February 1997.
Background: There have been reports of fuel leaks which have resulted in fire warnings and inflight shutdowns. The majority of these fuel leaks have occurred shortly after fuel manifold maintenance. The manufacturer has advised that the fuel manifold transfer tube lockplates are sensitive to installation errors and are a contributing factor to the fuel leaks.
Overview
The Civil Aviation Regulations 1998, under PART 39 - 106, incorporates the Civil Aviation Safety Authority’s Schedule of Airworthiness Directives, specifically addressing Pratt and Whitney Canada’s PW100 Series turbine engines. This legislation was enacted to address safety concerns associated with fuel leaks in PW100 series engines, which have led to fire warnings and inflight shutdowns, particularly after fuel manifold maintenance. The directive mandates the installation of new fuel manifold transfer tubes and lockplates, in accordance with Pratt and Whitney Canada’s service bulletins dated 10 October 1996 and 11 October 1996, to mitigate these risks. Compliance with this directive is mandatory and must be achieved by the next engine shop visit, the next fuel nozzle change, or by 30 November 1998, whichever occurs first.
The Australian Government, through the Civil Aviation Safety Authority, implemented this directive to ensure the continued airworthiness and safety of PW100 series engines used in aviation. The policy objective is to prevent fuel leaks by correcting installation errors in the fuel manifold transfer tube lockplates, thereby reducing the risk of inflight shutdowns and enhancing overall aviation safety. This directive became effective on 27 February 1997.
Scope and Application
The Civil Aviation Regulations 1998, specifically Part 39 - 106, applies to all PW100 series engines used in civil aviation within the Commonwealth of Australia. This regulation mandates that operators of such engines must comply with Airworthiness Directives concerning the installation of new fuel manifold transfer tubes and lockplates. These directives are in response to reports of fuel leaks that have led to fire warnings and inflight shutdowns, particularly after fuel manifold maintenance. The requirement is to adhere to Pratt and Whitney Canada Service Bulletins, 21077R7 dated 10 October 1996, and 21373R3 dated 11 October 1996, or any subsequent bulletins that meet the original intent. The compliance timeline stipulates that the installations must be completed at the next engine shop visit, no later than the next fuel nozzle change, or by 30 November 1998, whichever comes first. This directive became effective on 27 February 1997, reflecting the urgency to address the identified safety concerns.
Key Provisions
The Civil Aviation Regulations 1998, specifically Part 39 - 106, address airworthiness directives for Pratt and Whitney Canada Turbine Engines of the PW100 Series. The Airworthiness Directive (AD) in question, AD/PW100/8, pertains to fuel manifolds and was issued on 3 September 1997. According to section (3/97), this directive applies to all PW100 series engines and mandates the installation of new fuel manifold transfer tubes and new lockplates. These components must be installed in accordance with Pratt and Whitney Canada Service Bulletins 21077R7 dated 10 October 1996 and 21373R3 dated 11 October 1996, respectively. It is noted that later revisions of these service bulletins or any superseding bulletins that align with the original intent will also satisfy the requirements of this directive.
The directive imposes several obligations on the parties and entities it governs. Owners and operators of PW100 series engines must ensure compliance with the directive unless they have already fulfilled the requirements. Compliance must occur at the next engine shop visit, during the next fuel nozzle change, or by 30 November 1998, whichever comes first. This directive became effective on 27 February 1997. The background information provided indicates that there have been reports of fuel leaks leading to fire warnings and inflight shutdowns, primarily after fuel manifold maintenance. The manufacturer has identified installation errors in the fuel manifold transfer tube lockplates as a contributing factor to these leaks.
Failure to comply with the AD/PW100/8 directive could result in significant consequences. While specific offences and penalties are not detailed in the provided text, non-compliance with airworthiness directives is generally considered a serious breach of aviation safety regulations. Such breaches could lead to civil penalties, including fines or other monetary penalties, as well as potential criminal charges if the non-compliance results in accidents or other safety incidents. The severity of penalties would depend on the specific circumstances and the impact of the non-compliance on aviation safety.