AD/PA-32/74 Amdt 1 - Ammeter Installation

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2006B05870 In force Legislative Instrument

Legislation content

COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES

 


Piper PA-32 (Cherokee Six) Series Aeroplanes

 

AD/PA-32/74

Amdt 1


Ammeter Installation 12/86

 

Applicability:

PA-32-260

with S/Nos

32-1 through 32-7800008

 

PA-32-300

with S/Nos

32-40000 through 32-7940290

 

PA-32R-300

with S/Nos

32R-7680001 through 32R-7880068

 

PA-32RT-300

with S/Nos

32R-7885001 through 32R-7985105

 

PA-32RT-300T

with S/Nos

32R-7787001 through 32R-7987126

 

PA-32-301

with S/Nos

32-8006001 through 32-8106087

 

PA-32-301T

with S/Nos

32-8024001 through 32-8124030

 

PA-32R-301

with S/Nos

32R-8013001 through 32R-8113094

 

PA-32R-301T

with S/Nos

32R-8029001 through 32R-8129090

 

Except those aircraft fitted with ninety (90) ampere alternators.

 

Requirement: Action in accordance with Piper Service Bulletin No 811A. Ensure the shunt is positioned and adequately supported to prevent mechanical loads being applied to the 20 gauge wires connected to the ammeter.

 

Compliance: Within 100 hours time in service after 31 July 1986.

 

Background: Reports have been received of loose and/or shorting ammeter connections at the ammeter cluster gauge. If this condition is allowed to continue without rectification the possibility exists for electrical failure or a fire within the cockpit. Amendment 1 clarifies the protection requirement.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.