AD/ML-M4/7 - Aileron Control System - Modification

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2006B11293 In force Legislative Instrument

Legislation content

COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES

 


Maule M-4 Series Aeroplanes

 

AD/ML-M4/7 Aileron Control System - Modification 10/69

Applicability: All models.

 

Requriement: Remove the bolt attaching the most forward aileron control system pulley to the control column.

 

Replace the pulley assembly with the addition of washers AN970-5 and AN960-516, and bolt AN5-27 instead of the original bolt in the following order from front to rear:

 

  1. AN5-27 Bolt - head forward.

 

2.    AN970-5 Washer

 

3.    AN960-516 Washer

 

4.    Original Pulley

 

5.    Control Column

 

6.    AN960-516 Washer 7. AN365-524 Nut.

Compliance: Within 25 hours time in service after 1 October 1969.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.