AD/LEARJET 35/26 - Forward Engine Mounts

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2006B11105 In force Legislative Instrument

Legislation content

COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES

 


Gates Learjet 35 and 36 Series Aeroplanes

 

AD/LEARJET 35/26 Forward Engine Mounts 5/87

DM

Applicability:  All models 35 and 36 series aircraft with S/Nos. 35-001 to 35-522 and 36-001 to 36- 053 which do not incorporate forward engine mounts P/N 2651034.

 

Requirement: Inspect the forward engine mounts in accordance with Gates Learjet SB 35/36-71-3.

 

Note 1: Aircraft known to have unrepaired cracks shall not be returned to service without the prior approval of the Secretary.

 

Note 2: It is requested that inspections which result in no defects being discovered are reported to the Secretary, in order that the need for this requirement may be reviewed in the future.

 

Note 3: FAA AD 86-02-06 refers.

 

Compliance: (a) Visual Inspection - Part 2A of the SB:

 

Prior to exceeding 2400 hours total time in service or within 75 hours time in service after 18 March 1987, whichever occurs later, and thereafter at intervals not exceeding 420 hours time in service.

 

(b) Magnetic Particle Inspection - Part 2B of the SB:

 

Prior to exceeding 2400 hours total time in service or within 1500 hours time in service after 18 March 1987, whichever occurs later, and thereafter at intervals not exceeding 1500 hours time in service.

 

Background:  The manufacturer has reported a case of cracking in both engine mounts on a Model 35 aircraft. Further testing revealed that one of the engine mounts would not sustain the required regulatory loads.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Overview

The Civil Aviation Regulations 1998, specifically Part 39 - 105, was enacted by the Australian Parliament to ensure the safety of civil aviation within Australia's jurisdiction. This legislative instrument, which includes the Airworthiness Directives, addresses the problem of maintaining airworthiness standards to safeguard against potential hazards, such as structural failures in aircraft components. AD/LEARJET 35/26, focusing on Gates Learjet 35 and 36 series aeroplanes, was introduced in response to reports of cracking in the forward engine mounts. This directive mandates inspections to prevent unrepaired cracks from compromising the aircraft's structural integrity and safety. The objective is to maintain the highest safety standards by ensuring the structural soundness of critical components through regular inspections and compliance with specified intervals. The policy objective outlined in the directive is to mitigate the risk of engine mount failure, which could lead to catastrophic outcomes. By requiring inspections at specific intervals, the directive aims to proactively identify and rectify any defects, thereby ensuring the continued airworthiness of affected aircraft. This approach underscores the importance of rigorous safety measures in civil aviation, reflecting the commitment of the Australian Government to protect public safety through stringent regulatory oversight.

Scope and Application

The Civil Aviation Safety Authority's regulations under the Civil Aviation Act 1988 pertain to the maintenance and safety of Gates Learjet 35 and 36 series aeroplanes, specifically targeting aircraft with serial numbers within the specified ranges that do not incorporate forward engine mounts part number 2651034. These regulations are applicable across the Commonwealth of Australia and require compliance with the prescribed inspection intervals and conditions to ensure the airworthiness of the aircraft. The regulations mandate visual and magnetic particle inspections of the forward engine mounts to detect any potential defects such as cracks, with specific intervals based on the aircraft's total time in service. Aircraft that have unrepaired cracks identified during inspection must not be returned to service without prior approval from the Secretary. Additionally, inspections that do not uncover any defects are to be reported to the Secretary for future review. This regulatory framework extends its reach through subordinate instruments which may further detail compliance requirements and penalties for non-compliance.

Key Provisions

The Civil Aviation Regulations 1998, particularly Part 39 - 105, contain Airworthiness Directives (ADs) that are critical for ensuring the safety of aircraft operations. The specific AD/LEARJET 35/26 pertains to Gates Learjet 35 and 36 series aeroplanes. It applies to all models within serial numbers 35-001 to 35-522 and 36-001 to 36-053, excluding those that have already incorporated the specified forward engine mounts (P/N 2651034). This directive mandates an inspection of the forward engine mounts in compliance with Gates Learjet Service Bulletin (SB) 35/36-71-3. Aircraft that are found to have unrepaired cracks must not be returned to service without the prior approval of the Secretary. Additionally, it is requested that inspections showing no defects be reported to the Secretary to facilitate future reviews of this requirement. Under this directive, the primary obligations on the operators of affected aircraft include conducting thorough visual inspections and magnetic particle inspections of the forward engine mounts. For visual inspections, the regulation requires that these be performed either before the aircraft reaches 2400 hours of total time in service, or within 75 hours after 18 March 1987, whichever is later, and then at intervals not exceeding 420 hours. For magnetic particle inspections, the requirement is for these inspections to be done before reaching 2400 hours of total time in service, or within 1500 hours after 18 March 1987, and subsequently at intervals not exceeding 1500 hours. Failure to comply with these ADs can result in serious consequences. Aircraft with unrepaired cracks in the forward engine mounts are prohibited from returning to service without the Secretary's approval, thereby preventing potentially dangerous conditions from being overlooked. Additionally, operators must report inspection results to the Secretary, which helps maintain the oversight and safety standards set forth by the Civil Aviation Safety Authority (CASA). Non-compliance with these provisions could lead to enforcement actions, including fines and other penalties as stipulated by the regulations. The specific maximum penalties are not detailed in the excerpt but typically align with the severity of the breach and the risk posed to aviation safety.

Legal classification tags

Area of Law
Aviation Law
Instrument
Regulation
Concepts
Definitions & Interpretation
Compliance Obligations
Enforcement Powers

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.