COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Gates Learjet 24 & 25 Series Aeroplanes
AD/LEARJET/23
Amdt 1
Tailcone Service Area - Inspection 1/81
Applicability: All models 24 & 25 not incorporating Mod. Kit. No. AMK 80-7.
Requirement: Immediately after the engines are shut down, open the tailcone service area access cover and accomplish the following, using a flashlight or supplemental light as necessary:
- Check the motive flow valves for leaks or stains indicating leaks.
2. Check all vents and drains to ensure that they are clean and free from obstruction.
3. Any leaking motive flow valve must be replaced with a new or factory rebuilt valve prior to further flight. 4. Secure access cover.
Note 1. This inspection may be performed and certified by the pilot in command. Note 2. FAA AD 80-19-09 Amdt. 39-3913 refers.
Compliance: After every flight until modified to AMK 80-7.
Background: Undetected leakage of flammable fluids in the tailcone service area may, when combined with a source of ignition, result in fire or explosion. Incorporation of modification kit AMK 80-7 will eliminated the requirement for post-flight inspection of this area.
Overview
The Civil Aviation Regulations 1998, as amended, contain specific safety directives aimed at ensuring the airworthiness of aircraft, particularly addressing potential hazards such as the leakage of flammable fluids in the tailcone service area of Gates Learjet 24 and 25 Series Aeroplanes. The enactment of these regulations by the Australian Parliament through the Civil Aviation Act 1988 was intended to fill a critical gap in aviation safety by providing detailed instructions on the maintenance and inspection of aircraft to prevent accidents due to undetected leaks. The policy objective underpinning these regulations is to enhance the safety of air travel by mandating regular inspections and the prompt rectification of any issues that could compromise the structural integrity or safety of an aircraft. The regulations specifically target the prevention of fires or explosions that could arise from flammable fluid leaks in the tailcone service area, a known risk factor in aircraft operations.
Scope and Application
The Civil Aviation Regulations 1998, specifically Part 39 - 105, applies to all Gates Learjet 24 and 25 series aeroplanes that have not incorporated Modification Kit No. AMK 80-7. This regulation mandates that after every flight, the tailcone service area must be inspected for leaks or stains indicating leaks in the motive flow valves, as well as ensuring that all vents and drains are clean and free from obstruction. Any leaking motive flow valves identified during this inspection must be replaced with a new or factory rebuilt valve before further flight. The inspection and certification of compliance can be performed by the pilot in command. This directive extends to ensuring safety by preventing undetected leakage of flammable fluids, which could lead to fire or explosion if combined with a source of ignition. The application of this directive is nationwide, governed under Commonwealth regulations, and it does not specify exclusions or exemptions beyond the noted modification kit. The regulation may also be supplemented by subordinate instruments that further detail compliance and enforcement mechanisms.
Key Provisions
The Civil Aviation Regulations 1998, specifically under Part 39, Section 105, mandate strict procedures for the inspection of Gates Learjet 24 and 25 series aeroplanes. The key provision (AD/LEARJET/23 Amendment 1) focuses on the inspection of the tailcone service area, which is critical for safety reasons. According to section 1, operators must inspect the tailcone service area immediately after shutting down the engines. This includes checking the motive flow valves for any leaks or stains that may indicate leakage, examining all vents and drains to ensure they are clear of obstructions, and replacing any leaking motive flow valves before further flight. Section 4 then requires the access cover to be secured. This inspection can be performed by the pilot in command, as noted in section 1, Note 1.
The Act imposes several obligations on the operators and owners of Gates Learjet 24 and 25 series aeroplanes. Firstly, they must conduct the aforementioned inspection after every flight. This ongoing requirement is emphasised in section 1, which stipulates that the inspection must be performed until the aircraft is modified to incorporate Modification Kit No. AMK 80-7. This modification, referenced in section 1, Note 2, eliminates the need for post-flight inspections of the tailcone service area. Operators are also expected to maintain detailed records of these inspections, ensuring that all steps are properly documented.
Failure to comply with the requirements outlined in this legislation can lead to significant consequences. The Act does not specify particular offences or penalties but indicates the seriousness of the issue by referencing the potential for fire or explosion due to undetected leakage of flammable fluids. The safety regulations are designed to prevent such incidents, and any failure to adhere to the prescribed inspection procedures could result in severe operational penalties. While the exact penalties are not detailed in the provided text, non-compliance with civil aviation safety directives can typically lead to enforcement actions, fines, or even grounding of the aircraft until the required inspections are satisfactorily completed. The overarching aim is to ensure the highest standards of aviation safety are maintained to protect passengers, crew, and the public.