AD/IAI-W/13 - Forward Engine Mount Fasteners

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2006B10788 In force Legislative Instrument

Legislation content

COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES

 


Israel Aircraft Industries 1123 and 1124 (Westwind) Series Aeroplanes

 

AD/IAI-W/13 Forward Engine Mount Fasteners 13/89

Applicability: Model 1124, 1124A Westwinds with Serial Numbers prior to 441, except 432, 435 and 438.

 

Requirement: Action in accordance with Mandatory Service Bulletin No. 1124-71-091 Revision 2.

 

Compliance: Prior to exceeding 100 hours time in service after 28 December 1989 or at the next scheduled inspection for issue of Maintenance Release after 28 December 1989, whichever occurs later, and thereafter at intervals not exceeding 300 hours time in service until replaced.

 

Background: The manufacturer considers this Mandatory. At least one local incident of an H-11 steel forward engine mount bolt failure has occurred.

Overview

The Civil Aviation Regulations 1998, under Part 39, establish a framework for maintaining aircraft airworthiness in Australia, with specific directives for various aircraft models. The legislation was enacted to ensure the safety of civil aviation by setting mandatory standards and requirements for aircraft operation and maintenance. One such directive is AD/IAI-W/13, which applies to Israel Aircraft Industries 1123 and 1124 (Westwind) Series Aeroplanes, specifically requiring action on forward engine mount fasteners to address known safety issues. This directive responds to the need for stringent measures following incidents such as the failure of an H-11 steel forward engine mount bolt, as identified by the manufacturer. The objective of these regulations is to enhance aviation safety by mandating specific maintenance actions to prevent recurrence of such incidents. The Civil Aviation Regulations 1998 are enacted by the Australian Government and administered by the Civil Aviation Safety Authority (CASA). The policy objective behind AD/IAI-W/13 is to ensure that operators of Westwind Series Aeroplanes adhere to strict maintenance protocols to mitigate risks associated with engine mount failures, thereby safeguarding the integrity and safety of civil aviation operations within Australia.

Scope and Application

The Civil Aviation Regulations 1998, specifically Part 39 - 105 concerning Airworthiness Directives, applies to the Israel Aircraft Industries 1123 and 1124 (Westwind) series aeroplanes, focusing on the forward engine mount fasteners. This regulation mandates compliance with Mandatory Service Bulletin No. 1124-71-091 Revision 2 for the Model 1124 and 1124A Westwinds, with certain serial numbers excluded, namely 432, 435, and 438. The directive applies to aircraft with serial numbers prior to 441, requiring specific actions to be taken within a defined timeframe to ensure safety. Compliance must be achieved before the aircraft exceeds 100 hours of time in service after 28 December 1989 or at the next scheduled inspection for the issue of a Maintenance Release after that date, whichever comes later, and must continue at intervals not exceeding 300 hours of time in service until the fasteners are replaced. The regulation’s scope is limited to the specified aircraft models and serial numbers, and it extends its application through the mandatory adherence to the service bulletin, which outlines the necessary actions to address potential safety issues.

Key Provisions

The Civil Aviation Regulations 1998, specifically Part 39 - 105, includes a Schedule of Airworthiness Directives that governs the maintenance and safety of various aircraft models, including the Israel Aircraft Industries (IAI) 1123 and 1124 (Westwind) series aeroplanes. Within this directive, AD/IAI-W/13 pertains to the forward engine mount fasteners of Model 1124 and 1124A Westwinds, excluding those with specific serial numbers (432, 435, and 438) and those prior to serial number 441 (paragraph 13/89). This directive mandates adherence to the requirements outlined in Mandatory Service Bulletin No. 1124-71-091 Revision 2, which specifies the necessary action to be taken concerning the forward engine mount fasteners. These aircraft owners and operators must ensure that the required action is completed before the aircraft exceeds 100 hours of time in service after 28 December 1989, or at the next scheduled inspection for the issuance of a Maintenance Release after that date, whichever comes later. Additionally, this maintenance must be repeated at intervals not exceeding 300 hours of time in service until the fasteners are replaced (section 13/89). This directive underscores the importance of maintaining the structural integrity of the forward engine mount, given the manufacturer's consideration of this issue as mandatory, and the occurrence of at least one local incident involving an H-11 steel forward engine mount bolt failure. The obligations imposed by this directive are clear and specific. Aircraft owners and operators must ensure that the forward engine mount fasteners are inspected and maintained in accordance with the prescribed schedule and specifications. This includes following the detailed instructions provided in the referenced service bulletin, which likely involves replacing or repairing the fasteners to prevent any potential failure that could compromise the aircraft's safety. Compliance with this directive is not optional; it is a legal requirement to maintain the airworthiness of the affected aircraft. Failure to comply with the requirements of this directive may result in serious consequences. Although the specific penalties are not detailed in the provided text, non-compliance with airworthiness directives in general can lead to both civil and criminal penalties under the Civil Aviation Act 1988. Civil penalties can include fines and the potential grounding of the aircraft until compliance is achieved. In severe cases, criminal charges may be brought against individuals responsible for the aircraft's maintenance, potentially leading to imprisonment. The specific penalties would depend on the extent of non-compliance and the resulting impact on aviation safety.

Legal classification tags

Area of Law
Aviation Law
Instrument
Regulation
Concepts
Definitions & Interpretation
Compliance Obligations
Enforcement Powers
Catchwords
Airworthiness Directives
Mandatory Service Bulletin

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.