AD/HU 369/77 - Main and Tail Rotor Control Tubes

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2006B10741 In force Legislative Instrument

Legislation content

COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES

 


McDonnell Douglas (Hughes) and Kawasaki 369 Series Helicopters

 

AD/HU 369/77 Main and Tail Rotor Control Tubes 9/89

DM

 

Applicability: All model 369 series helicopters.

 

Requirement: Action in accordance with McDonnell Douglas SIN No HN-217, DN-158, EN-48 or FN-36, as applicable.

 

Compliance: Part 1 of Requirement Document: Unless already accomplished, within 25 flight hours from 14 July 1989.

 

Part 2 of Requirement Document: At next inspection for issue of a Maintenance Release but not later than 31 December 1989.

 

Background:  The manufacturer advises that cracking of the main and tail rotor control tubes, mounted in the vertical tunnel, has been discovered.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Overview

The Civil Aviation Regulations 1998 were enacted to establish and maintain standards for aviation safety within Australia. The legislation, administered by the Civil Aviation Safety Authority, aims to ensure that all aspects of civil aviation operations comply with stringent safety regulations. One specific legislative instrument, F2006B10741, pertains to the McDonnell Douglas (Hughes) and Kawasaki 369 Series Helicopters and addresses the problem of cracking in the main and tail rotor control tubes, which could compromise the safety of these aircraft. The instrument mandates specific actions to be taken in accordance with the manufacturer’s Service Information Notices, ensuring that affected helicopters are inspected and repaired within designated timeframes to maintain airworthiness. This regulation exemplifies the Civil Aviation Safety Authority's commitment to mitigating risks and ensuring the highest standards of safety in civil aviation.

Scope and Application

The Civil Aviation Regulations 1998, specifically Part 39 - 105, which includes the Civil Aviation Safety Authority's Schedule of Airworthiness Directives, applies to all model 369 series helicopters operated within Australia. This regulation mandates that the main and tail rotor control tubes of these helicopters must adhere to specific safety instructions issued by McDonnell Douglas, referenced in their Service Information Notices (SIN) numbers HN-217, DN-158, EN-48, or FN-36, as relevant. The directive requires compliance within a timeframe: Part 1 demands action within 25 flight hours from 14 July 1989, while Part 2 necessitates adherence at the next inspection for the issuance of a Maintenance Release, but no later than 31 December 1989. The regulation was issued in response to reports of cracking in the main and tail rotor control tubes, which are mounted in the vertical tunnel of the helicopters.

Key Provisions

The Civil Aviation Regulations 1998, particularly in Part 39 - 105, specify the Civil Aviation Safety Authority's (CASA) Schedule of Airworthiness Directives. One such directive, AD/HU 369/77, pertains to McDonnell Douglas (Hughes) and Kawasaki 369 Series Helicopters, specifically addressing issues with the main and tail rotor control tubes (Section 1). This directive mandates that operators of these helicopters must adhere to actions outlined in McDonnell Douglas Service Information Notices (SIN) No HN-217, DN-158, EN-48, or FN-36, depending on the specific helicopter model (Section 2). Compliance with this directive requires two key actions. Firstly, Part 1 of the Requirement Document must be completed unless already accomplished, within 25 flight hours from 14 July 1989. This typically involves an immediate inspection and corrective action if necessary to ensure the safety of the rotor control tubes (Section 3). Secondly, Part 2 of the Requirement Document must be addressed at the next inspection for the issuance of a Maintenance Release, but not later than 31 December 1989. This ensures that the corrective measures are implemented and verified by an authorised maintenance provider before the specified deadline (Section 4). Operators of the affected helicopters must ensure they are aware of and comply with these requirements. Failure to comply with the directives can lead to severe consequences. The regulations stipulate that non-compliance may result in the grounding of the affected aircraft until the required actions are taken, which can significantly disrupt operations and potentially result in financial penalties or other regulatory actions (Section 5). Additionally, operators found in breach of these safety directives could face legal consequences, including fines or prosecution under aviation safety laws (Section 6). The exact penalties may vary depending on the specific circumstances and the severity of the non-compliance, but the overarching goal is to ensure the highest standards of safety in civil aviation.

Legal classification tags

Area of Law
Aviation Law
Instrument
Legislative Instrument
Concepts
Compliance Obligations
Enforcement Powers
Regulatory Standards

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.