COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Eurocopter BK 117 Series Helicopters
AD/GBK 117/9 Rotor Mast Assembly 12/97
Applicability: All MBB BK 117 helicopters fitted with either main rotor mast assembly P/N 4639205016 or 4639205011.
Requirement: Inspect the main rotor mast assembly flange for cracking in accordance with Eurocopter Alert Service Bulletin MBB-BK-117-10-114 dated August 27, 1997.
Note: LBA AD 97-276 refers.
Compliance: Unless previously carried out, prior to further flight after the effective date inspect the main rotor mast flange for cracking. Thereafter, re inspect at intervals not exceeding 100 hours time in service.
This airworthiness directive becomes effective on 6 November 1997.
Background: The manufacturer has advised that cracking has been found in the flange area of a main rotor mast assembly.
Overview
The Civil Aviation Regulations 1998, specifically Part 39 - 105, was enacted to ensure the safety of civil aviation in Australia. The regulation was enacted by the Parliament of Australia and aims to maintain a consistent standard of airworthiness across the nation. This particular legislative instrument, F2006B10266, pertains to Eurocopter BK 117 Series Helicopters and addresses a critical safety concern identified in the rotor mast assembly. The problem it was introduced to address involves the potential for cracking in the main rotor mast flange of certain MBB BK 117 helicopters. This directive mandates that operators inspect the main rotor mast flange for any signs of cracking, following specific guidelines provided by Eurocopter, to ensure continued safe operation of the aircraft. The policy objective is to mitigate the risk of catastrophic failure due to structural weaknesses in the rotor mast assembly.
The airworthiness directive, AD/GBK 117/9, became effective on 6 November 1997, requiring that inspections be conducted before further flights after the directive's effective date and subsequently at intervals not exceeding 100 hours of time in service. The directive references Eurocopter Alert Service Bulletin MBB-BK-117-10-114 dated 27 August 1997, and notes the applicability to helicopters fitted with main rotor mast assembly parts numbers 4639205016 or 4639205011. This directive ensures that operators adhere to stringent safety measures to maintain the airworthiness of these helicopters, thereby protecting passengers, crew, and the public.
Scope and Application
The Civil Aviation Safety Authority (CASA) regulations, specifically Part 39 - 105 of the Civil Aviation Regulations 1998, apply to all MBB BK 117 helicopters that are equipped with either main rotor mast assembly part numbers 4639205016 or 4639205011. This airworthiness directive, AD/GBK 117/9, mandates that the main rotor mast assembly flange must be inspected for cracking, in accordance with the Eurocopter Alert Service Bulletin MBB-BK-117-10-114 dated 27 August 1997. Compliance with this directive is essential, requiring that inspections be conducted before any further flight after the directive’s effective date, 6 November 1997, and subsequently at intervals not exceeding 100 hours of time in service. Failure to comply with these inspection requirements can lead to significant safety risks, as cracking in the flange area of the rotor mast assembly has been identified by the manufacturer as a potential hazard. CASA’s directive ensures that operators of these helicopters maintain the airworthiness of their aircraft by adhering to these specific inspection protocols.
Key Provisions
The Civil Aviation Regulations 1998, specifically Part 39 - 105, establish the requirements for the maintenance and airworthiness of aircraft. Section AD/GBK 117/9 focuses on the rotor mast assembly for the Eurocopter BK 117 Series Helicopters. It mandates that all MBB BK 117 helicopters equipped with main rotor mast assembly parts numbers 4639205016 or 4639205011 must undergo an inspection of the main rotor mast assembly flange for any signs of cracking. This inspection must be performed in accordance with Eurocopter Alert Service Bulletin MBB-BK-117-10-114 dated August 27, 1997. The directive references LBA AD 97-276 for additional guidance.
The obligations under this directive require that, unless the inspection has already been completed, the main rotor mast flange must be inspected for cracking before any further flight after the directive's effective date of November 6, 1997. Following this initial inspection, subsequent inspections must be conducted at intervals not exceeding 100 hours of time in service. This ensures that any potential issues with the rotor mast assembly are identified and addressed promptly to maintain the helicopter's airworthiness.
Failure to comply with the requirements set out in the airworthiness directive can lead to serious safety concerns. Operators of the MBB BK 117 helicopters must adhere strictly to the inspection schedule and procedures to avoid any risk of in-flight failure due to undetected cracks in the rotor mast assembly. Non-compliance with these regulations can result in severe consequences, including grounding of the aircraft, legal penalties, and potential criminal charges for those responsible for the oversight. The specific penalties for non-compliance are not detailed within the text, but they are likely to be significant given the critical nature of the inspection requirements.