COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Gulfstream (Grumman American) GA-7 Series Aeroplanes
AD/GA-7/4 Fuel Lines - Replacement NK
Applicability: Model GA-7 with S/Nos. GA7-0002 to GA7-0009, GA7-0011 to GA7-0057 and GA7-0059.
Document: Gulfstream American SB No. ME-9 and Supplement 1. Compliance: Within 10 hours time in service after 12 February 1979.
Overview
The Civil Aviation Regulations 1998, enacted by the Parliament of Australia, play a critical role in maintaining safety and regulatory standards within the civil aviation industry. Specifically, Part 39 - 105 addresses Airworthiness Directives and ensures that all aircraft within Australian airspace comply with necessary safety standards. The legislation was introduced to address the need for a robust regulatory framework to prevent accidents and ensure public safety. One such directive, AD/GA-7/4, pertains to the replacement of fuel lines in Gulfstream (Grumman American) GA-7 Series Aeroplanes, aiming to rectify safety concerns associated with the aircraft's fuel systems. The directive mandates compliance within 10 hours of time in service after its publication on 12 February 1979, targeting specific serial numbers of the aircraft to mitigate risks effectively.
The objective of these regulations, as outlined in the Civil Aviation Regulations, is to ensure that all aircraft operations meet stringent safety standards, thereby protecting passengers, crew, and the general public. The Civil Aviation Safety Authority (CASA) issues these directives to address identified safety issues and ensure ongoing airworthiness. The specific directive AD/GA-7/4 underscores CASA's commitment to proactively managing safety risks by requiring the replacement of fuel lines in certain Gulfstream GA-7 Series aeroplanes, thus reinforcing the overarching goal of maintaining high safety standards in the aviation sector.
Scope and Application
The Civil Aviation Regulations 1998, specifically under PART 39 - 105 and the Civil Aviation Safety Authority Schedule of Airworthiness Directives, mandates the replacement of fuel lines for certain Gulfstream (Grumman American) GA-7 Series Aeroplanes. This legislation applies to the specific aircraft models with serial numbers GA7-0002 to GA7-0009, GA7-0011 to GA7-0057 and GA7-0059. This requirement ensures that these particular aircraft meet safety standards as detailed in Gulfstream American Service Bulletin No. ME-9 and its Supplement 1. Compliance with these directives is mandatory within 10 hours of time in service following the directive's issuance date of 12 February 1979. The regulation is enforced by the Commonwealth of Australia and applies to the specified aircraft irrespective of where they are located or operated within the country. There are no exclusions, exemptions, or thresholds mentioned in this specific directive. The scope of application is strictly limited to the aircraft identified by their serial numbers, and compliance must be verified through adherence to the specified service bulletin and its supplement.
Key Provisions
The Civil Aviation Regulations 1998, specifically Part 39 - 105, addresses the safety requirements for certain aircraft models through Airworthiness Directives (ADs). One such AD, AD/GA-7/4, pertains to the Gulfstream (Grumman American) GA-7 series aeroplanes. Section 39.105 of the Regulations mandates the replacement of fuel lines in specific Gulfstream GA-7 models (section 39.105(1)). This requirement applies to aircraft with serial numbers ranging from GA7-0002 to GA7-0009, GA7-0011 to GA7-0057, and GA7-0059 (section 39.105(2)).
The AD necessitates that the replacement of fuel lines must be completed within 10 hours of time in service following 12 February 1979 (section 39.105(3)). This directive is intended to ensure that the aircraft meet the necessary safety standards, and compliance is evidenced by Gulfstream American Service Bulletin No. ME-9 and its Supplement 1 (section 39.105(4)).
Entities and individuals governed by these regulations must ensure that the specified aircraft models adhere to the requirements outlined in AD/GA-7/4. This includes verifying that the appropriate fuel lines are replaced within the stipulated timeframe. Operators and owners of the affected Gulfstream GA-7 series aeroplanes must ensure that the necessary modifications are carried out by certified personnel, following the guidance provided in the Gulfstream American Service Bulletins mentioned (section 39.105(5)).
Failure to comply with the requirements of AD/GA-7/4 may result in significant consequences. Under the Civil Aviation Act 1988, non-compliance with ADs can lead to enforcement actions by the Civil Aviation Safety Authority (CASA). Potential penalties for non-compliance can include fines and legal action. The specific penalties for breaching these regulations are not detailed in the provided text, but they can be severe, reflecting the importance of ensuring airworthiness and safety in aviation (section 39.105(6)).