AD/EMB-110/36 Amdt 1 - Elevator Trim Tab Actuation - Dual Control Rod Installation

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2006B09477 In force Legislative Instrument

Legislation content

COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES

 


Embraer EMB-110 (Bandeirante) Series Aeroplanes

 

AD/EMB-110/36

Amdt 1


Elevator Trim Tab Actuation - Dual Control Rod Installation


11/85

 

Applicability: All model EMB-110 with S/Nos referenced in the Requirement Document. Requirement:               Action in accordance with Embraer SB 110-27-068 Rev 1.

Note: Brazilian AD 82-06-01 R5.

 

Compliance: Within 250 hours time in service after 30 November 1985.

 

Note: Aircraft which have complied with previous issues of this Directive require further rework in accordance with SB 110-27-068 R1.

 

Background: To preclude the effect of rod failure the installation of dual rods with bearings and increased weight to the elevator mass balance is now a mandatory requirement. This amendment references Rev 1 to the Requirement Document.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.